American Green Technology Inc. (AGT), a leader in the manufacture and import of "magnetic induction lights," has concluded its equity funding by raising an additional $900,000.
This equity round officially closed on May 31, 2012. It will solidify AGT's already strong balance sheet, provide the capital necessary to sustain planned growth for the next several quarters, as well as finalize the acquisition of Detroit-based BDT Light Source LLC.
"Because BDT is 'excellent' operationally, AGT and BDT will be able to integrate their operations quickly, which will give the combined companies the infrastructure to handle the sales growth which we are experiencing in this energy efficient lighting space," said Danny Bogar, CEO of AGT. "AGT is excited about concluding its financing and purchase of BDT, and looks forward to the growth in business afforded by the increase in equity, bank financing, and the acquisition of BDT."
AGT has also concluded its bank financing with 1st Source Bank of South Bend, bringing its total financing available to $1.05 million.
AGT has also completed its purchase agreement with BDT Light Source LLC by executing the final Membership Interest Purchase Agreement with the BDT members.
Related Stories
| Mar 1, 2012
8 tips for architects to consider before LED installation
Lighting experts offer Building Team members critical information to consider before upgrading lighting systems to LEDs.
| Feb 28, 2012
LUMEnergi names Weinbaum president and CEO
Weinbaum’s experience spans communications, nanotechnology, electronics components, consumer products, semiconductors, software, wireless and lighting.
| Jan 24, 2012
U of M installs new lighting at Crisler Player Development Center
Energy efficient lighting installed at PDC reduce costs and improves player performance.
| Jan 9, 2012
Lutron appoints Pessina president
In his 35-year career with Lutron, Pessina has acquired broad experience in the engineering, quality assurance and manufacturing areas.
| Dec 13, 2011
Lutron’s Commercial Experience Center awarded LEED Gold
LEED certification of the Lutron facility was based on a number of green design and construction features that positively impact the project itself and the broader community. These features include: optimization of energy performance through the use of lighting power, lighting controls and HVAC, plus the use of daylight.
| Nov 23, 2011
Griffin Electric completes Gwinnett Tech project
Accommodating up to 3,000 students annually beginning this fall, the 78,000-sf, three-story facility consists of thirteen classrooms and twelve high-tech laboratories, in addition to several lecture halls and faculty offices.
| Nov 17, 2011
Campus-wide energy-efficiency program aims to deliver $3.5 million in energy and operational savings
Merced College and Honeywell will use the school’s energy usage statistics to develop a course curriculum on sustainability, and raise awareness among students of the positive impact conservation practices contribute to the community.
| Oct 17, 2011
Schneider Electric introduces UL924 emergency lighting control devices
The emergency lighting control devices require fewer maintenance costs and testing requirements than backup batteries because they comply with the UL924 standard, reducing installation time.
| Oct 14, 2011
MaxLite receives 2011 Lighting for Tomorrow honorable mention
The judging panel was particularly impressed with the performance of this fixture.