flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Another billionaire sports club owner plans to build a football stadium in Los Angeles

Another billionaire sports club owner plans to build a football stadium in Los Angeles

Kroenke Group is the latest in a series of high-profile investors that want to bring back pro football to the City of Lights.


By John Caulfield, Senior Editor | January 5, 2015
Kroenke Groups owner, billionaire real estate developer Stan Kroenke, is the fi
Kroenke Groups owner, billionaire real estate developer Stan Kroenke, is the first existing NFL owner to control enough land in

An investment group controlled by the owner of the St. Louis Rams NFL team has joined forces with Stockbridge Capital Group, which owns the 298-acre Hollywood Park site in Inglewood, Calif., to add an 80,000-seat football stadium and 6,000-seat performance arena to a massive mixed-use development Stockbridge already has in the works, according to the Los Angeles Times and other news reports.

A year ago, Kroenke Group purchased 60 acres of land adjacent to the Forum arena in Inglewood. With its deal with Stockbridge, Kroenke Group’s owner, billionaire real estate developer Stan Kroenke, becomes the first existing NFL owner to control enough land in the Los Angeles market to accommodate a football stadium and parking since the Rams left L.A. for St. Louis after the 1994 season.

For decades, team owners in other cities have used the threat of relocating to Los Angeles as leverage for negotiating improvements to their own stadiums from local municipalities or states. And Kroenke has expressed displeasure with the conditions of Edward Jones Dome in St. Louis, where the Rams currently play. 

The Times reports that next month the Rams can opt out of its 30-year lease in St. Louis 10 years early and convert it to a year-to-year arrangement. But the earliest the Rams could relocate to Los Angeles would be 2016.

No tax dollars would be used to build the Hollywood Park development, including the stadium. The investors are already gathering signatures to put the project onto the city’s municipal ballot this year. Inglewood’s Mayor James Butts, Jr. is on record supporting this project, which the investors have dubbed the City of Champions Revitalization Project. 

The developer Wilson Meany, with offices in L.A. and San Francisco, is heading up this development, which, if approved, could be completed by 2018. HKS Architects is also involved in this project. 

Kroenke and Stockbridge’s proposal is competing with at least two other plans for new stadiums in or around L.A. The entertainment giant AEG, which owns this city’s professional hockey and soccer teams, wants to build a $1.5 billion football stadium in downtown L.A., called Farmers Field, along with a new wing for the city’s nearby convention center. Another real estate magnate, Ed Roski, has had a stadium plan for City of Industry, Calif., on the table for several years. However, neither of these competing plans has mustered a commitment from an NFL team to relocate. 

The Hollywood Park project would include more than 4 million sf of retail, office, and residential space, and 25 acres of parks. But to move forward, the Rams would have to commit to moving, and the project would need to get past any political or environmental opposition. 

Related Stories

| Jul 9, 2012

Modular Construction Delivers Model for New York Housing in Record Time

A 65-unit supportive housing facility in Brooklyn, N.Y., was completed in record time using modular construction with six stories set in just 12 days.

| Jul 9, 2012

NELSON, Torchia announce merger

Former competitors seek competitive advantage by joining forces.

| Jul 9, 2012

Integrated Design Group completes UCSB data center

Firm uses European standard of power at USCB North Hall Research Data Center.

| Jul 9, 2012

Oakdale, Calif., Heritage Oaks Senior Apartments opens

New complex highlights senior preferences for amenities.

| Jul 3, 2012

Trimble to acquire WinEstimator

Acquisition adds estimating software solutions to Meridian Systems’ portfolio.

| Jul 3, 2012

Summit Design+Build completes Emmi Solutions HQ

The new headquarters totals 20,455 sq. ft. and features a loft-style space with exposed masonry and mechanical systems, 17-ft clear ceilings, two large rooftop skylights, and private offices with full glass partition walls.

| Jul 3, 2012

TOLK now called Dewberry

The renaming indicates a simplification in Dewberry’s corporate naming conventions.

| Jul 2, 2012

Bernards building mixed-use project in Beverly Hills

The project includes 88 luxury apartment homes atop a 14,000-sf Trader Joe’s market and a new coffee shop.

| Jul 2, 2012

San Francisco lays claim to the greenest building in North America

The 13-floor building can hold around 900 people, but consumes 60% less water and 32% less energy than most buildings of its kind.

| Jul 2, 2012

Plumosa School of the Arts earns LEED Gold

Education project dedicated to teaching sustainability in the classroom.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021