flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Another billionaire sports club owner plans to build a football stadium in Los Angeles

Another billionaire sports club owner plans to build a football stadium in Los Angeles

Kroenke Group is the latest in a series of high-profile investors that want to bring back pro football to the City of Lights.


By John Caulfield, Senior Editor | January 5, 2015
Kroenke Groups owner, billionaire real estate developer Stan Kroenke, is the fi
Kroenke Groups owner, billionaire real estate developer Stan Kroenke, is the first existing NFL owner to control enough land in

An investment group controlled by the owner of the St. Louis Rams NFL team has joined forces with Stockbridge Capital Group, which owns the 298-acre Hollywood Park site in Inglewood, Calif., to add an 80,000-seat football stadium and 6,000-seat performance arena to a massive mixed-use development Stockbridge already has in the works, according to the Los Angeles Times and other news reports.

A year ago, Kroenke Group purchased 60 acres of land adjacent to the Forum arena in Inglewood. With its deal with Stockbridge, Kroenke Group’s owner, billionaire real estate developer Stan Kroenke, becomes the first existing NFL owner to control enough land in the Los Angeles market to accommodate a football stadium and parking since the Rams left L.A. for St. Louis after the 1994 season.

For decades, team owners in other cities have used the threat of relocating to Los Angeles as leverage for negotiating improvements to their own stadiums from local municipalities or states. And Kroenke has expressed displeasure with the conditions of Edward Jones Dome in St. Louis, where the Rams currently play. 

The Times reports that next month the Rams can opt out of its 30-year lease in St. Louis 10 years early and convert it to a year-to-year arrangement. But the earliest the Rams could relocate to Los Angeles would be 2016.

No tax dollars would be used to build the Hollywood Park development, including the stadium. The investors are already gathering signatures to put the project onto the city’s municipal ballot this year. Inglewood’s Mayor James Butts, Jr. is on record supporting this project, which the investors have dubbed the City of Champions Revitalization Project. 

The developer Wilson Meany, with offices in L.A. and San Francisco, is heading up this development, which, if approved, could be completed by 2018. HKS Architects is also involved in this project. 

Kroenke and Stockbridge’s proposal is competing with at least two other plans for new stadiums in or around L.A. The entertainment giant AEG, which owns this city’s professional hockey and soccer teams, wants to build a $1.5 billion football stadium in downtown L.A., called Farmers Field, along with a new wing for the city’s nearby convention center. Another real estate magnate, Ed Roski, has had a stadium plan for City of Industry, Calif., on the table for several years. However, neither of these competing plans has mustered a commitment from an NFL team to relocate. 

The Hollywood Park project would include more than 4 million sf of retail, office, and residential space, and 25 acres of parks. But to move forward, the Rams would have to commit to moving, and the project would need to get past any political or environmental opposition. 

Related Stories

| Oct 13, 2010

County building aims for the sun, shade

The 187,032-sf East County Hall of Justice in Dublin, Calif., will be oriented to take advantage of daylighting, with exterior sunshades preventing unwanted heat gain and glare. The building is targeting LEED Silver. Strong horizontal massing helps both buildings better match their low-rise and residential neighbors.

| Oct 12, 2010

Holton Career and Resource Center, Durham, N.C.

27th Annual Reconstruction Awards—Special Recognition. Early in the current decade, violence within the community of Northeast Central Durham, N.C., escalated to the point where school safety officers at Holton Junior High School feared for their own safety. The school eventually closed and the property sat vacant for five years.

| Oct 12, 2010

Guardian Building, Detroit, Mich.

27th Annual Reconstruction Awards—Special Recognition. The relocation and consolidation of hundreds of employees from seven departments of Wayne County, Mich., into the historic Guardian Building in downtown Detroit is a refreshing tale of smart government planning and clever financial management that will benefit taxpayers in the economically distressed region for years to come.

| Oct 12, 2010

Richmond CenterStage, Richmond, Va.

27th Annual Reconstruction Awards—Bronze Award. The Richmond CenterStage opened in 1928 in the Virginia capital as a grand movie palace named Loew’s Theatre. It was reinvented in 1983 as a performing arts center known as Carpenter Theatre and hobbled along until 2004, when the crumbling venue was mercifully shuttered.

| Oct 12, 2010

University of Toledo, Memorial Field House

27th Annual Reconstruction Awards—Silver Award. Memorial Field House, once the lovely Collegiate Gothic (ca. 1933) centerpiece (along with neighboring University Hall) of the University of Toledo campus, took its share of abuse after a new athletic arena made it redundant, in 1976. The ultimate insult occurred when the ROTC used it as a paintball venue.

| Oct 12, 2010

Owen Hall, Michigan State University, East Lansing, Mich.

27th Annual Reconstruction Awards—Silver Award. Officials at Michigan State University’s East Lansing Campus were concerned that Owen Hall, a mid-20th-century residence facility, was no longer attracting much interest from its target audience, graduate and international students.

| Oct 12, 2010

Gartner Auditorium, Cleveland Museum of Art

27th Annual Reconstruction Awards—Silver Award. Gartner Auditorium was originally designed by Marcel Breuer and completed, in 1971, as part of his Education Wing at the Cleveland Museum of Art. Despite that lofty provenance, the Gartner was never a perfect music venue.

| Oct 12, 2010

Cell and Genome Sciences Building, Farmington, Conn.

27th Annual Reconstruction Awards—Silver Award. Administrators at the University of Connecticut Health Center in Farmington didn’t think much of the 1970s building they planned to turn into the school’s Cell and Genome Sciences Building. It’s not that the former toxicology research facility was in such terrible shape, but the 117,800-sf structure had almost no windows and its interior was dark and chopped up.

| Oct 12, 2010

The Watch Factory, Waltham, Mass.

27th Annual Reconstruction Awards — Gold Award. When the Boston Watch Company opened its factory in 1854 on the banks of the Charles River in Waltham, Mass., the area was far enough away from the dust, dirt, and grime of Boston to safely assemble delicate watch parts.

| Oct 12, 2010

Cuyahoga County Soldiers’ and Sailors’ Monument, Cleveland, Ohio

27th Annual Reconstruction Awards—Gold Award. The Cuyahoga County Soldiers’ and Sailors’ Monument was dedicated on the Fourth of July, 1894, to honor the memory of the more than 9,000 Cuyahoga County veterans of the Civil War.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021