flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Architects and contractors underestimate cyberattack risk

Architects

Architects and contractors underestimate cyberattack risk

After five days, ransomware attacks cause serious disruptions, according to a new report. 


By Peter Fabris, Contributing Editor | October 4, 2023
Architects and contractors underestimate cyberattack risk - Image by Cliff Hang from Pixabay
Image by Cliff Hang from Pixabay

Design and construction industry firms underestimate their vulnerability to cyberattacks, according to a new report, Data Resilience in Design and Construction: How Digital Discipline Builds Stronger Firms by Dodge Construction Network and content security and management company Egnyte.

Fifty-nine percent of firms responding to a survey experienced a cybersecurity threat within the last two years. General contractors were hit most frequently, with 70% experiencing a threat and 30% suffering a ransomware attack since 2021.

Successful attacks can be dire, with 77% of firms saying they would experience critical schedule delays if access to documentation is blocked for more than five days. Ransomware attacks often take a lot longer to resolve than just a few days, though.

The average duration of a successful ransomware attack in the U.S. ranged from 15 days to 26 days between the first quarter of 2020 and the second quarter of 2022, according to Statista, a company that operates a global data and business intelligence platform.

The study also says that the industry needs improvement on data resilience, which it defines as “the ability to access all project and business documents and data to support work at any time, from anywhere, and on any device.” Just 39% of AEC firms’ data networks meet that standard at least 90% of the time, “meaning most of the industry struggles with this issue.”

Related Stories

| Jan 16, 2013

SOM’s innovative Zhengzhou Greenland Plaza opens

The 2.59-million-square-feet building houses a mixed-use program of offices on its lower floors and a 416-room hotel.

| Jan 15, 2013

Morris Architects joins Huitt-Zollars

Morris, which will continue to provide services under its current name and leadership, is entering its 75th year of continuous practice as an architectural, interior design, landscape architecture, and planning firm.

| Jan 11, 2013

HMC Architects: In their own voices

See what HMC professionals say about their “Best AEC Firm to Work For”

| Jan 10, 2013

Guide predicts strongest, weakest AEC markets for 2013

2013 Guide to U.S. AEC markets touts apartments, natural gas, senior housing and transmission and distribution.

| Jan 9, 2013

Panasonic and Bluebeam preview new architect app at CES 2013

Panasonic and Bluebeam Software collaborate to develop and introduce the 4K tablet and software to the design and construction industry.

| Jan 3, 2013

Answered prayers

A bold renovation enables a small church to expand its mission on a grand scale.

| Jan 3, 2013

Top BIM/VDC articles of 2011-2012

A compendium of BD+Cs top building information modeling and virtual design + construction articles from 2011-12.

| Jan 3, 2013

8 trends shaping today’s senior housing

The ranks of those age 65 and older are swelling by the thousands every day. Is there an opportunity for your firm in the seniors housing market?

| Jan 2, 2013

Trends Report: New facilities enhance the quality of campus life

Colleges and universities are building state-of-the-art student unions, dining halls, and other non-academic buildings to enrich the campus experience, boost enrollment, and stay competitive.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021