flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Architecture firm Perkins&Will to deliver ‘carbon forecasts’ for clients

Codes and Standards

Architecture firm Perkins&Will to deliver ‘carbon forecasts’ for clients

 

Perkins&Will aims to mitigate buildings’ environmental impact through this new initiative.


By Peter Fabris, Contributing Editor | April 28, 2022
Architecture firm Perkins & Will to deliver ‘carbon forecasts’ for clients
Graphic: Perkins & Will

Global architecture firm Perkins & Will says it will issue its clients a “carbon forecast” for their projects.

This tool is an effort to “facilitate measurable and meaningful carbon reduction in the built environment,” according to a news release. Carbon forecasts will help clients understand their projects’ carbon emissions, and the impact of those emissions on human and environmental health, at the earliest stages of design.

The forecasts will include information on building design, construction, and operation (known as whole-life-carbon). And, importantly, they will identify steps clients and project teams can take to reduce those emissions.

The forecasts will include options on how to reduce operational carbon through passive design, minimization of energy loads, optimization of systems, disconnection from unclean fuel sources, and integration of renewable energy. Measures for realizing maximum reductions in embodied carbon will be offered.

In addition, the firm will provide opportunities for enabling circular design that can minimize material waste, maximize material reuse, and optimize environments for material health.

Related Stories

| Mar 30, 2012

CSI webinar: Durable & energy efficient building envelope design, April 24

This seminar will review recent changes in North America energy codes, examples of building enclosure wall assemblies being considered for code compliance, potential moisture management and durability challenges, and design tools that could be used to assess and minimize potential problems.

| Mar 30, 2012

Improved construction that followed seismic codes helped avert loss of life in Mexico temblor

A magnitude-7.4 earthquake that shook Mexico from Mexico City to Acapulco damaged hundreds of homes and sent thousands fleeing from swaying office buildings, yet no one was killed, according to early reports.

| Mar 30, 2012

Chicago may allow people to live in retail spaces

The Chicago City Council’s Zoning Committee approved a zoning change that will allow up to 50% of work space in low-intensity business districts to be used for living space.

| Mar 30, 2012

LEED growing fast in the housing rental market

Last year, developers of 23,000 U.S. multifamily housing units applied for LEED certification.

| Mar 30, 2012

Forest Stewardship Council critical of proposed LEED 2012 changes

According to the Forest Stewardship Council (FSC), the third draft of LEED 2012, if approved as written, would represent a step backward from the current Certified Wood Credit.

| Mar 22, 2012

Symposium on water efficiency: How much more water can be saved?

The Third International Emerging Technology Symposium by IAPMO and the World Plumbing Council features a session on water efficiency.

| Mar 22, 2012

Broker doesn’t have to inform contractor that insurer went broke, California court rules

A California appellate court ruled that an insurance broker did not have a duty to inform a subcontractor that a project’s insurer had gone bankrupt.

| Mar 22, 2012

Public agencies shouldn’t negotiate project labor agreements, says AGC official

When a public agency rather than the contractor negotiates a PLA with unions, it interferes with the right of employers and workers to reach their own agreements on working conditions and benefits, says Steve Isenhart, president of the Associated General Contractors of Washington.

| Mar 22, 2012

Proposed rule would let crane operators get licenses without prior city experience

The Bloomberg administration is considering letting operators of giant tower cranes get their license without requiring that they first run cranes as apprentices in the city for three years.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021