flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Arkansas Arts Center to undergo $142 million transformation into the Arkansas Museum of Fine Arts

Museums

Arkansas Arts Center to undergo $142 million transformation into the Arkansas Museum of Fine Arts

Studio Gang is designing the project.


By David Malone, Associate Editor | January 28, 2021

All renderings courtesy Studio Gang.

Located in Little Rock, the Arkansas Arts Center is currently undergoing a $142 million transformation to become the Arkansas Museum of Fine Arts. The new museum will include an increase in space of almost 50% and the addition of 13 acres of new grounds.

The signature feature of Studio Gang’s design is a new structure, dubbed the Blossom, that winds through the length of the museum. Defined outwardly by its pleated roof, the Blossom will become the core of the visitor experience, laying out a clear path for visitors, uniting the museum’s programmed spaces, and providing major new public features at either end: an expansive glass-enclosed gathering space overlooking the Downtown side, and a restaurant that spreads out into MacArthur Park. The pleated roof also allows for the collection of storm water, which will feed the park’s new gardens and native perennial meadows.

 

Arkansas Museum of Fine Arts exterior

 

The project joins the landscape experience with the museum and provides 2,200 linear feet of new paths and trails throughout 13 acres of MAcArthur Park. Inspiration for the landscape (designed by SCAPE Landscape Architecture) draws from Little Rock’s unique regional ecologies, including the banks of Fourche Creek, the bluffs of Emerald Park, and the agrarian landscapes of the Mississippi Delta. 

 

Arkansas Museum of Fine Arts gallery

 

SCAPE’s design preserves many of the parks existing mature trees and relies on sustainable, native plantings and incorporates more than 50 species of perennials, shrubs, native trees, and ornamental grasses. An additional 250 new trees will be planted, which will create a canopy throughout the park over time.

The Arkansas Museum of Fine Arts is slated for completion in spring 2022.

 

The Blossom at the Arkansas Museum of Fine Arts

 

Arkansas Museum of Fine Arts entrance from the South

Tags

Related Stories

| Mar 13, 2014

Do you really 'always turn right'?

The first visitor center we designed was the Ernest F. Coe Visitor Center for the Everglades National Park in 1993. I remember it well for a variety of reasons, not the least of which was the ongoing dialogue we had with our retail consultant. He insisted that the gift shop be located on the right as one exited the visitor center because people “always turn right.” 

| Mar 12, 2014

14 new ideas for doors and door hardware

From a high-tech classroom lockdown system to an impact-resistant wide-stile door line, BD+C editors present a collection of door and door hardware innovations. 

| Mar 5, 2014

5 tile design trends for 2014

Beveled, geometric, and high-tech patterns are among the hot ceramic tile trends, say tile design experts.

| Feb 24, 2014

New Menil Drawing Institute will fit in with leafy surroundings

In Houston, plans are being finalized for the first freestanding American building built to house and conserve modern and contemporary drawings. 

| Feb 18, 2014

Robert A.M. Stern sent back to drawing board for Revolutionary War museum in Philadelphia

The Philadelphia Art Commission has suggested some significant changes to the design by Robert A.M. Stern Architects, namely the elimination of a cupola and the addition of eye-level windows on the ground floor.

| Feb 14, 2014

Giant interactive pinwheel adds fun to museum exterior

The proposed design for the Santa Cruz Museum of Art and History features a 10-foot pinwheel that can be activated by passersby.

| Feb 14, 2014

Crowdsourced Placemaking: How people will help shape architecture

The rise of mobile devices and social media, coupled with the use of advanced survey tools and interactive mapping apps, has created a powerful conduit through which Building Teams can capture real-time data on the public. For the first time, the masses can have a real say in how the built environment around them is formed—that is, if Building Teams are willing to listen.

| Feb 13, 2014

Extreme Conversion: Nazi bunker transformed into green power plant, war memorial

The bunker, which sat empty for over 60 years after WWII, now uses sustainable technology and will provide power to about 4,000 homes.

| Jan 30, 2014

How reverse engineering nature can spur design innovation

It’s not enough to copy nature. Today’s designers need a deeper understanding of environmental nuance, from the biome in.

| Jan 28, 2014

16 awe-inspiring interior designs from around the world [slideshow]

The International Interior Design Association released the winners of its 4th Annual Global Excellence Awards. Here's a recap of the winning projects.

boombox1
boombox2
native1

More In Category

Museums

UT Dallas opens Morphosis-designed Crow Museum of Asian Art

In Richardson, Tex., the University of Texas at Dallas has opened a second location for the Crow Museum of Asian Art—the first of multiple buildings that will be part of a 12-acre cultural district. When completed, the arts and performance complex, called the Edith and Peter O’Donnell Jr. Athenaeum, will include two museums, a performance hall and music building, a grand plaza, and a dedicated parking structure on the Richardson campus.




Museums

The Tampa Museum of Art will soon undergo a $110 million expansion

In Tampa, Fla., the Tampa Museum of Art will soon undergo a 77,904-sf Centennial Expansion project. The museum plans to reach its $110 million fundraising goal by late 2024 or early 2025 and then break ground. Designed by Weiss/Manfredi, and with construction manager The Beck Group, the expansion will redefine the museum’s surrounding site.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021