flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Aston Martin breaks ground on new F1 headquarters

Sports and Recreational Facilities

Aston Martin breaks ground on new F1 headquarters

The project is located in Northamptonshire.


By David Malone, Managing Editor | September 15, 2021
Aston Martin campus aerial
Renderings courtesy Aston Martin Racing

The Aston Martin Cognizant Formula One Team has recently broken ground on a new headquarters in Northamptonshire, England. The project, which represents the first all-new F1 factory in the UK since the McLaren Technology Centre opened in 2004, is being designed by Ridge and Partners LLP.

The project will span 400,000 sf across multiple buildings, including a factory and a wind tunnel. The three-unit factory will be built just across the street from the Silverstone Grand Prix Circuit. One building will house the team’s design, manufacturing and marketing resource; a second building will be occupied by the new wind tunnel; and the third will redevelop and repurpose the existing factory premises as a central hub with staff amenities and a logistics center. The new headquarters will house every manufacturing resource within a single campus for the first time in Aston Martin’s history.

Aston Martin campus rendering

The new wind tunnel will use the latest steel-belt rolling-road system and a state-of-the-art flow-imaging section area. The site will incorporate the wind tunnel, model support, and production facilities. The commissioning of the wind tunnel is due to start in Q3 2023.

Aston Martin campus

The project also claims to be the first “smart factory” in Formula One. It has been designed from the ground-up to be a wireless, adaptive, streamlined facility with all of its information streams, monitoring systems, and manufacturing processes tied together via data in the cloud. The technology will give the headquarters the ability to constantly adapt to the cyclical manufacturing processes of a Formula One team.

The new headquarters is slated for completion in late 2022 or early 2023.

Aston Martin campus aerial

Aston martin F1 campus

 

 

 

 

Related Stories

Sports and Recreational Facilities | Apr 21, 2017

Boston Celtics training and practice facility will be part of Boston Landing mixed-use development

The facility will also include two floors of Class A laboratory and office space and retail space.

Sports and Recreational Facilities | Apr 19, 2017

Mercedes-Benz Stadium delayed until late August

The stadium is now scheduled to open on Aug. 26 in a preseason game between the Falcons and the Jaguars.

Concrete | Apr 7, 2017

‘Cool’ pavement creates ice rink aesthetic outside NHL practice facility

The concrete contains unique colors, aggregates, and textures.

Sports and Recreational Facilities | Apr 5, 2017

Informed design: A dynamic approach to athletic facilities design

With the completion of the athletic facility upgrade—dubbed the Arden Project—students will have access to state-of-the-art facilities.

Sports and Recreational Facilities | Mar 9, 2017

The construction of the Atlanta Braves’ new stadium, in 1 minute

OxBlue’s time-lapse video draws from more than 200,000 images.

Sports and Recreational Facilities | Feb 27, 2017

Miami’s AmericanAirlines Arena debuts a multipurpose event space

601 offers variety and flexibility not found in the arena’s other food and entertainment locations.

Sports and Recreational Facilities | Feb 22, 2017

3XN Architects wins competition to design Swedish aquatic center

The Danish firm beat entries from Zaha Hadid Architects and Henning Larsen Architects for the project.

Sports and Recreational Facilities | Feb 8, 2017

Dan Gilbert’s Rock Ventures proposes a land-for-jailhouse construction exchange

He would take over a downtown Detroit site, where he wants to build a soccer stadium, and build a new jail and courthouse about 1.5 miles away.

Sports and Recreational Facilities | Jan 26, 2017

How human performance facilities are changing the game

Human performance facilities are emerging as a new way for people to attend to their overall wellness.

Sports and Recreational Facilities | Jan 11, 2017

The Oakland Raiders could build this $1.9 billion stadium if they move to Vegas

The proposal was designed by MANICA Architecture and would seat 65,000 fans with room to expand to 72,000 for the Super Bowl.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021