flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Aurora, Colo., recreation center features city’s first indoor field house, unobstructed views of the Rocky Mountains

Sports and Recreational Facilities

Aurora, Colo., recreation center features city’s first indoor field house, unobstructed views of the Rocky Mountains

The $41.9 million, 77,000-sf Southeast Aurora Recreation Center and Fieldhouse aims to mimic the geography of a canyon.


By Novid Parsi, Contributing Editor | March 17, 2023
Aurora, Colo., recreation center features city’s first indoor field house, unobstructed views of the Rocky Mountains
All photos: Conor Culver, courtesy Populous

In January, design firm Populous and the City of Aurora, Colo. marked the opening of the Southeast Aurora Recreation Center and Fieldhouse. The 77,000-sf facility draws design inspiration from the nearby Rocky Mountains.

With natural Douglas Fir structure and decking, the building aims to mimic the geography of a canyon. The large open entryway spans the length of the building and offers expansive mountain views through a glass curtainwall. The glass walls also provide light and visibility into various areas such as the basketball courts.

Populous designed the facility, including the city’s first indoor field house, to respect the site while also meeting the project requirements of operational efficiency, cost-effective design, and the community’s betterment.

“This new recreation center and field house stands apart as a breathtaking example of a community asset that is built to reflect, benefit, and showcase its people and its landscape,” Gudmundur Jonsson, senior architect and principal at Populous, said in a statement. “The City of Aurora now has another cost-effective and operationally efficient space that will allow it to further serve its community.”

An elevated running track extends from inside the gym out into the entryway and along the curtainwall, evoking a mountain trail. The fitness area includes a 3,000-sf patio and a garage door opening to outdoor training areas. In addition to the gym, track, and other outdoor fitness areas, the recreation center includes community spaces, volleyball courts, pickleball courts, pools, and a 20-foot-tall waterslide that runs 152 feet long.

The $41.9 million project is the second ground-up recreation center constructed for Aurora in over four decades. Populous also led the design of Aurora’s Central Recreation Center.

On the Building Team:
Owner: City of Aurora Parks, Recreation, and Open Space Department
Design architect and architect of record: Populous
MEP engineers: The Ballard Group, Innovative Electrical Systems
Structural engineer: Martin Martin
General contractor/construction manager: Saunders Construction

Southeast Aurora Recreation Center and Fieldhouse by Populous Photo by Conor Culver

Southeast Aurora Recreation Center and Fieldhouse by Populous Photo by Conor Culver

Southeast Aurora Recreation Center and Fieldhouse by Populous Photo by Conor Culver

Southeast Aurora Recreation Center and Fieldhouse by Populous Photo by Conor Culver

Southeast Aurora Recreation Center and Fieldhouse by Populous Photo by Conor Culver

Related Stories

| Jun 12, 2014

Austrian university develops 'inflatable' concrete dome method

Constructing a concrete dome is a costly process, but this may change soon. A team from the Vienna University of Technology has developed a method that allows concrete domes to form with the use of air and steel cables instead of expensive, timber supporting structures.

| Jun 11, 2014

Esri’s interactive guide to 2014 World Cup Stadiums

California-based Esri, a supplier of GIS software, created a nifty interactive map that gives viewers a satellite perspective of Brazil’s many new stadiums.

| Jun 4, 2014

Construction team named for Atlanta Braves ballpark

A joint venture between Barton Malow, Brasfield & Gorrie, Mortenson Construction, and New South Construction will build the Atlanta Braves ballpark, which is scheduled to open in early 2017. Check out the latest renderings of the plan.

| Jun 2, 2014

Parking structures group launches LEED-type program for parking garages

The Green Parking Council, an affiliate of the International Parking Institute, has launched the Green Garage Certification program, the parking industry equivalent of LEED certification.

| May 29, 2014

7 cost-effective ways to make U.S. infrastructure more resilient

Moving critical elements to higher ground and designing for longer lifespans are just some of the ways cities and governments can make infrastructure more resilient to natural disasters and climate change, writes Richard Cavallaro, President of Skanska USA Civil.

| May 22, 2014

Just two years after opening, $60 million high school stadium will close for repairs

The 18,000-seat Eagle Stadium in Allen, Texas, opened in 2012 to much fanfare. But cracks recently began to appear throughout the structure, causing to the school district to close the facility. 

| May 20, 2014

Kinetic Architecture: New book explores innovations in active façades

The book, co-authored by Arup's Russell Fortmeyer, illustrates the various ways architects, consultants, and engineers approach energy and comfort by manipulating air, water, and light through the layers of passive and active building envelope systems.

| May 19, 2014

What can architects learn from nature’s 3.8 billion years of experience?

In a new report, HOK and Biomimicry 3.8 partnered to study how lessons from the temperate broadleaf forest biome, which houses many of the world’s largest population centers, can inform the design of the built environment.

| May 16, 2014

Toyo Ito leads petition to scrap Zaha Hadid's 2020 Olympic Stadium project

Ito and other Japanese architects cite excessive costs, massive size, and the project's potentially negative impact on surrounding public spaces as reasons for nixing Hadid's plan.  

| May 13, 2014

First look: Nadel's $1.5 billion Dalian, China, Sports Center

In addition to five major sports venues, the Dalian Sports Center includes a 30-story, 440-room, 5-star Kempinski full-service hotel and conference center and a 40,500-square-meter athletes’ training facility and office building.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021