In addition to gaining 200 much-needed parking spaces, the city of West Hollywood, Calif., is effectively planting hundreds of acres’ worth of trees.
The city recently opened a new fully-automated parking garage for city staff, residents, and local businesses. Designed by LPA Inc., and outfitted with technology from Unitronics Automated Solutions, the garage will use robots to move and store cars throughout the building.
Since the cars are turned off when being parked and retrieved, the city says that the reduction in carbon dioxide emissions is equal to removing 92 cars from the road over a year. That’s equal to planting 67,000 trees.
To make the garage even more sustainable, the shell surrounding the warehouse is made of composite wood panels made from recycled plastic grocery bags. Photovoltaic solar panels and drought-tolerant landscaping has also been installed. The garage will also display public art and serve as a "community open space," according to LPA.
(Click photos to enlarge)
Related Stories
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 7, 2012
2012 BUILDING TEAM AWARDS: Audie L. Murphy VA Hospital
How a Building Team created a high-tech rehabilitation center for wounded veterans of the conflicts in Iraq and Afghanistan.
| Apr 23, 2012
Thornton Tomasetti project wins AISC Merit Award
Thornton Tomasetti provided structural design services through construction administration to architect HOK for the 1.6-million-sf tower and tiara structure, which comprises 15 steel tube arches spanning approximately 158 feet horizontally and 130 feet vertically from the top of the main building roof.
| Feb 15, 2012
Skanska secures $87M contract for subway project
The construction value of the project is $261.9 M. Skanska will include its full share, $87 M, in the bookings for Skanska USA Civil for the first quarter 2012.
| Feb 10, 2012
LAX Central Utility Plant project tops out
Construction workers placed the final structural steel beam atop the Plant, which was designed with strict seismic criteria to help protect the facility and airport utilities during an earthquake.
| Dec 19, 2011
Davis Construction breaks ground on new NIAID property
The new offices will total 490,998 square feet in a 10-story building with two wings of 25,000 square feet each.
| Nov 15, 2011
Suffolk Construction breaks ground on the Victor housing development in Boston
Project team to manage construction of $92 million, 377,000 square-foot residential tower.
| Nov 15, 2011
Miller joins Perkins Eastman as regional manager, Middle East and Northern Africa
Miller joins Perkins Eastman with more than 48 years of experience in architecture, design management, and construction administration for planning and infrastructure.