flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Barton Malow is celebrating its 100th anniversary with a road show

Contractors

Barton Malow is celebrating its 100th anniversary with a road show

A traveling exhibit will make 30 stops this summer and fall, many at project sites.


By John Caulfield, Senior Editor | July 30, 2024
 A 42-ft van will take Barton Malow's Legacy Tour exhibit to 30 locations.
A 42-ft trailer will transport Barton Malow's Legacy Tour exhibit to 30 locations. Image: Barton Malow

The general contractor Barton Malow is taking its centennial celebration on the road.

This Friday, the company will make the first stop on its “Legacy Tour” in Detroit, a city where Barton Malow was founded by Carl Osborn Barton in 1924, and with which it has a long building history. (Its first contract was interior renovations for Michigan Bell Telephone Company.)

The company’s 100th anniversary exhibit, which includes special artifacts and interactive displays, is contained within a 42-ft truck, on the side of which reads Barton Malow’s tagline: “Building Today for a Better Tomorrow.”

(It takes about an hour to set up the stage and stairs to access the exhibit, says a company spokesman.)

Through the end of October, the truck is scheduled to make about 30 stops that will include 20 at Barton Malow projects and jobsites.

Celebrating employees and the Motor City

Ryan Maibach, the company’s fourth generation President and CEO, said in a prepared statement that Barton Malow’s anniversary is meant “to celebrate the contributions of the team members on our jobsites.” The Legacy Tour, he added, will “give team members the opportunity to experience this initiative.”

Barton Malow re-emphasizes its connection with Detroit on its website, which features a nearly 10-minute video where Maibach and three other team members—Kara Martini, Detroit office manager; Kevin Zeleji, Senior Director of Field Services; and Dannis Mitchell, Senior Director-Community Engagement—single out Detroit-area projects that Barton Malow built, including the historic restoration and rebuilding of the 130-room Shinola Hotel, which took two years to complete; and the construction of Little Caesars Arena, on which Barton Malow worked with Hunt and White Construction. Three-fifths of the contractors on the $862 million arena project were Detroit-based, said Mitchell.

“With every project we do, we’re partnering with the community,” said Zeleji on the video interview. Maibach, who has been the company’s president since 2011, also emphasized the importance of market diversity and expansion. Barton Malow launched its Mid-Atlantic operations in 1989, and is now building in 16 states nationwide and the Canadian province of Ontario. It serves nine building types.

Related Stories

MFPRO+ News | Sep 24, 2024

Major Massachusetts housing law aims to build or save 65,000 multifamily and single-family homes

Massachusetts Gov. Maura Healey recently signed far-reaching legislation to boost housing production and address the high cost of housing in the Bay State. The Affordable Homes Act aims to build or save 65,000 homes through $5.1 billion in spending and 49 policy initiatives.

AEC Tech | Sep 24, 2024

Generative AI can bolster innovation in construction industry

Jeff Danley, Associate Technology and Innovation Consultant at Burns & McDonnell, suggests several solutions generative AI could have within the construction industry.

Mixed-Use | Sep 19, 2024

A Toronto development will transform a 32-acre shopping center site into a mixed-use urban neighborhood

Toronto developers Mattamy Homes and QuadReal Property Group have launched The Clove, the first phase in the Cloverdale, a $6 billion multi-tower development. The project will transform Cloverdale Mall, a 32-acre shopping center in Toronto, into a mixed-use urban neighborhood.

3D Printing | Sep 17, 2024

Alquist 3D and Walmart complete one of the nation’s largest free-standing, 3D-printed commercial structures

Walmart has completed one of the largest free-standing, 3D-printed commercial structures in the US. Alquist 3D printed the almost 8,000-sf, 20-foot-high addition to a Walmart store in Athens, Tenn. The expansion, which will be used for online pickup and delivery, is the first time Walmart has applied 3D printing technology at this scale. 

Retail Centers | Sep 17, 2024

Thinking outside the big box (store)

For over a decade now, the talk of the mall industry has been largely focused on what developers can do to fill the voids left by a steady number of big box store closures. But what do you do when big box tenants stay put?

Government Buildings | Sep 17, 2024

OSHA’s proposed heat standard published in Federal Register

The Occupational Safety and Health Administration (OSHA) has published a proposed standard addressing heat illness in outdoor and indoor settings in the Federal Register. The proposed rule would require employers to evaluate workplaces and implement controls to mitigate exposure to heat through engineering and administrative controls, training, effective communication, and other measures.

Codes and Standards | Sep 17, 2024

New California building code encourages, but does not mandate heat pumps

New California homes are more likely to have all-electric appliances starting in 2026 after the state’s energy regulators approved new state building standards. The new building code will encourage installation of heat pumps without actually banning gas heating. 

Codes and Standards | Sep 17, 2024

ASHRAE’s first group of certified decarbonization professionals announced

ASHRAE recently announced its inaugural cohort of Certified Decarbonization Professionals (CDPs). Individuals who earned this designation demonstrate competency to assess, analyze, and develop effective and sustainable strategies to reduce or eliminate the life-cycle carbon footprint of buildings. 

Mass Timber | Sep 17, 2024

Marina del Rey mixed-use development is L.A.’s largest mass timber project

An office-retail project in Marina del Rey is Los Angeles’ largest mass timber project to date. Encompassing about 3 acres, the 42XX campus consists of three low-rise buildings that seamlessly connect with exterior walkways and stairways. The development provides 151,000 sf of office space and 1,500 sf of retail space.

Education Facilities | Sep 16, 2024

Hot classrooms, playgrounds spur K-12 school districts to go beyond AC for cooling

With hotter weather occurring during the school year, school districts are turning to cooling strategies to complement air conditioning. Reflective playgrounds and roads, cool roofs and window films, shade structures and conversion of asphalt surfaces to a natural state are all being tried in various regions of the country. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021