Tampa, Florida (June 19, 2014) – Contractor Batson-Cook has named Frank J. Rygiel, LEED AP,the Vice President of Business Development for its Tampa office. In this new position, Mr. Rygiel will be responsible for cultivating and maintaining business relationships in the state of Florida, concentrating his efforts on expanding the firm’s presence in the state’s private development sector.
Mr. Rygiel most recently served as Senior Project Manager with Batson-Cook, managing in excess of $100 million in projects. He has been integral to the firm’s projects with the School District of Hillsborough County, leading the construction of the Stowers Elementary and Barrington Middle School combined campus in Lithia. His multi-family work has included the construction of The Portland apartments in St. Petersburg, and SkyHouse Orlando, a 23-story luxury high-rise apartment project in downtown Orlando.
A graduate of East Carolina University, Mr. Rygiel is a member of Leadership Pasco’s Class of 2011 and Leadership Tampa Bay’s Class of 2013. His work has been recognized nationally, regionally and locally, as he achieved the following designations in 2012: Building Design+Construction Top 40 Under 40, Engineering News Record Southeast Top 20 Under 40 and the Tampa Bay Business Journal “Up and Comer”. He also serves on the Board of Directors for Pasco-Hernando State College Foundation and Lutz Preparatory School, and is the Sergeant-at-Arms of The Rotary Club of Wesley Chapel Sunrise.
Batson-Cook Construction, founded in 1915, builds a wide range of commercial projects for healthcare, industrial, manufacturing and private development clients throughout the Southeast. We have the heart of a family-owned general contractor with the reach of a global construction firm. We build with passion. We operate with integrity. For more information visit www.batson-cook.com.
Related Stories
Building Team Awards | Apr 10, 2015
Virtual collaboration helps complete a hospital in 24 months
PinnacleHealth needed a new hospital STAT! This team delivered it in two years, start to finish.
Building Team Awards | Apr 10, 2015
New arts venue reinvigorates Virginia Tech's campus
The STV-led Building Team creates a world-class performance and arts venue with learning and entrepreneurial dimensions.
Building Team Awards | Apr 9, 2015
Multifaced fitness center becomes campus landmark
A sloped running track and open-concept design put this Building Team to the test.
Building Team Awards | Apr 9, 2015
Nation's first LEED-certified bus depot
A bus garage in Harlem shows that even the most mundane of facilities can strut its environmentally sensitive stuff.
Building Team Awards | Apr 9, 2015
Setting the bar for port-of-entry design
Whenever you eat a tomato from Mexico, there’s a one-in-three chance it came through this LEED Gold gateway.
Building Team Awards | Apr 9, 2015
Big D’s billion-dollar baby: New Parkland Hospital Tops the Chart | BD+C
Dallas’s new $1.27 billion public hospital preserves an important civic anchor, Texas-style.
Building Team Awards | Apr 9, 2015
IPD-driven fusion facility serves science and student life in Chicago
In dire need of modern science labs and a student union, North Park University built both—in the same building.
Building Team Awards | Apr 9, 2015
‘Prudent, not opulent’ sets the tone for this Catholic hospital
This Building Team stuck with a project for seven years to get a new hospital built for a faithful client.
Building Team Awards | Apr 9, 2015
9/11 museum triumphs over controversy
The Building Team for this highly visible project had much more than design, engineering, and construction problems to deal with.
Building Team Awards | Apr 7, 2015
Unique test facility will help make wind power more feasible
A new facility at Clemson University makes it possible to test the huge stresses that large-scale wind turbines must be able to withstand.