Tampa, Florida (June 19, 2014) – Contractor Batson-Cook has named Frank J. Rygiel, LEED AP,the Vice President of Business Development for its Tampa office. In this new position, Mr. Rygiel will be responsible for cultivating and maintaining business relationships in the state of Florida, concentrating his efforts on expanding the firm’s presence in the state’s private development sector.
Mr. Rygiel most recently served as Senior Project Manager with Batson-Cook, managing in excess of $100 million in projects. He has been integral to the firm’s projects with the School District of Hillsborough County, leading the construction of the Stowers Elementary and Barrington Middle School combined campus in Lithia. His multi-family work has included the construction of The Portland apartments in St. Petersburg, and SkyHouse Orlando, a 23-story luxury high-rise apartment project in downtown Orlando.
A graduate of East Carolina University, Mr. Rygiel is a member of Leadership Pasco’s Class of 2011 and Leadership Tampa Bay’s Class of 2013. His work has been recognized nationally, regionally and locally, as he achieved the following designations in 2012: Building Design+Construction Top 40 Under 40, Engineering News Record Southeast Top 20 Under 40 and the Tampa Bay Business Journal “Up and Comer”. He also serves on the Board of Directors for Pasco-Hernando State College Foundation and Lutz Preparatory School, and is the Sergeant-at-Arms of The Rotary Club of Wesley Chapel Sunrise.
Batson-Cook Construction, founded in 1915, builds a wide range of commercial projects for healthcare, industrial, manufacturing and private development clients throughout the Southeast. We have the heart of a family-owned general contractor with the reach of a global construction firm. We build with passion. We operate with integrity. For more information visit www.batson-cook.com.
Related Stories
| Apr 12, 2011
Miami courthouse design does justice to children and the environment
Suffolk Construction broke ground recently for the Miami-Dade County Children’s Courthouse, a $328 million project the firm has a 30-month contract to complete.
| Apr 12, 2011
Long-awaited San Francisco center is music to jazz organization’s ears
After 28 years, SFJAZZ is getting its first permanent home. The San Francisco-based nonprofit, which is dedicated to advancing the art of jazz through concerts and educational programs, contracted local design firm Mark Cavagnero Associates and general contractor Hathaway Dinwiddie to create a modern performance center in the city’s Hayes Valley neighborhood
| Apr 12, 2011
Mitsubishi commissions electric power manufacturing plant in Memphis
Greenville, S.C.-based design and construction firm O’Neal Inc. is providing design, engineering, procurement, and construction services for Mitsubishi Electric Power Products.
| Apr 12, 2011
BIM Grows Up: Separating Hype from Reality in a 3D World
While BIM adoption still lags in both design and construction, some enterprising owners, architects, and contractors are unlocking the potential of this dynamic technology.
| Apr 12, 2011
Metal cladding: Enhancing design with single-skin panels, MCMs, and IMPs
Single-skin metal panels, metal composite panels, and insulated metal panels can add both aesthetic and functional value to your projects, if you use them correctly.
| Apr 12, 2011
American Institute of Architects announces Guide for Sustainable Projects
AIA Guide for Sustainable Projects to provide design and construction industries with roadmap for working on sustainable projects.
| Apr 5, 2011
What do Chengdu, Lagos, and Chicago have in common?
They’re all “world middleweight cities” that are likely to become regional megacities (10 million people) by 2025—along with Dongguan, Guangzhou, Hangzhou, Shenzhen, Tianjin, and Wuhan (China); Kinshasa (Democratic Republic of the Congo); Jakarta (Indonesia); Lahore (Pakistan); and Chennai (India), according to a new report from McKinsey Global Institute: “Urban World: Mapping the economic power of cities”.
| Mar 22, 2011
San Francisco ready to test hiring law
San Francisco's new construction law, billed as the nation’s toughest local hiring ordinance, establishes strict requirements for how many work hours on city-financed projects must be completed by city residents, starting with 20% this year. It also requires that a set percentage of hours be performed by low-income workers. The requirements apply to municipal construction projects worth more than $400,000 within 70 miles of the city.