flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Battle over low-cost, Chinese-made solar equipment could stunt solar power growth

Battle over low-cost, Chinese-made solar equipment could stunt solar power growth

Proposed tariffs on PVs opposed by solar power installers


By Peter Fabris, Contributing Editor | June 18, 2014
Photo: U.S. Department of Agriculture via Wikimedia Commons
Photo: U.S. Department of Agriculture via Wikimedia Commons

The U.S. Department of Commerce tentatively agreed to assess tariffs of up to 35% on solar equipment, a move that could slow the rapid growth of the domestic solar power industry. SolarWorld, a German company with a U.S. base is in Oregon, requested the tariffs, claiming China unfairly subsidizes its solar manufacturers.

Solar panel installers, on the other hand, are opposed to tariffs. These companies have boomed as panel prices have fallen 70 percent since the start of 2010. Tariffs, they say, will make solar power less affordable.

SolarWorld made a similar complaint to U.S. trade officials in 2011. The next year, the Commerce Department imposed duties averaging 31% on Chinese solar cells. Many Chinese companies responded by taking cells made in other countries, assembling them into panels in China, and shipping them to the U.S. to sidestep the tariffs.

Many solar power industry insiders are holding out hope that SolarWorld and the Chinese can work out a settlement.     

(http://www.sfgate.com/business/article/Tariffs-could-dim-solar-energy-s-rapid-growth-5538030.php)

Related Stories

| Feb 19, 2014

USGBC introduces new online educational platform

The U.S. Green Building Council has introduced “Education @USGBC” a new educational platform.

| Feb 17, 2014

Channeling weather forecasts to building systems can yield significant energy savings

Using weather forecasts to predict outdoor temperature changes can lead to significant energy savings, exceeding 10%, researchers say.

| Feb 17, 2014

Lawmakers may take away control of Florida hospital project from the VA

The project is $100 million over budget and has missed its scheduled completion date.

| Feb 17, 2014

Business, labor at odds over toughening of OSHA silica dust rule

OSHA says the rules will protect workers and prevent 700 fatalities annually. Others say the rules would hurt businesses and jobs. 

| Feb 17, 2014

Tulsa, Okla., mulls code change to require storm shelters in new schools

State and city officials are pushing for increased bonding capacity to pay for the storm shelters.

| Feb 13, 2014

Appraisal Institute issues guidelines on evaluating green property

The Appraisal Institute and the Institute for Market Transformation have issued guidelines for training property appraisers to evaluate green buildings.

| Feb 7, 2014

New LEED Dynamic Plaque system will measure building performance

The U.S. Green Building Council recently unveiled the LEED Dynamic Plaque, which is a new system designed for benchmarking and comparing post-occupancy building performance on a global scale.

| Feb 7, 2014

Los Angeles officials struggle to deal with needed seismic retrofits

Sixteen years ago, the Los Angeles City Council decided against requiring retrofits of existing buildings because of the projected cost and the threat of losing 20,000 apartment buildings.

| Feb 7, 2014

Los Angeles officials struggle to deal with needed seismic retrofits

Sixteen years ago, the Los Angeles City Council decided against requiring retrofits of existing buildings because of the projected cost and the threat of losing 20,000 apartment buildings.

| Feb 7, 2014

EPA, Freddie Mac collaborate on energy- and water-efficient apartments

Freddie Mac will gather data on energy and water use from property owners, and encourage lenders to spend on energy-efficient investments for multifamily housing. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021