flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

BBS Architects & Engineers receives 2011 Sustainable Design Award from AIA Long Island Chapter

BBS Architects & Engineers receives 2011 Sustainable Design Award from AIA Long Island Chapter


By By BD+C Staff | October 24, 2011
AIA LI bestowed the award in recognition of an outstanding use of sustainable design practices during BBS work at the Nesconset

The American Institute of Architects Long Island Chapter (AIA LI) presented its prestigious 2011 Sustainable Design Award to BBS Architects & Engineers (BBS). AIA LI bestowed the award in recognition of an outstanding use of sustainable design practices during BBS’ work at the Nesconset Public Library Branch. LIPA Long Island Power Authority sponsored the Sustainable Design Award.

AIA LI also recognized BBS with the 2011 ARCHI Award Commendation for the St. Charles Resurrection Cemetery St. Charles Resurrection Cemetery Welcoming and Information Center in Farmingdale, NY.

Located in Nesconset, NY, the 25,000-sf Nesconset Library Branch project encompassed a conversion of a former federal armory structure into a library and technical services center for the entire Smithtown Special Library District. The Nesconset Library is currently undergoing the LEED certification by the US Green Building Council, with the LEED Silver level target.

BBS, a leading Greater New York area architect and designer of green institutional, educational and corporate facilities, served as architect, interior designer and engineer for the library conversion.

“We are tremendously honored to receive the 2011 Sustainable Design Award,” said BBS President and Lead Architect Roger P. Smith, AIA, LEED AP. “The Nesconset Library Branch project presented the BBS design team with an exciting opportunity to redevelop an abandoned structure into an environmentally responsible public use facility that will serve the local community for decades to come.”

The entire library building was fully renovated, including new HVAC, lighting, electrical and plumbing systems. The armory’s “drill room” was converted into a soaring open plan library space with unobstructed clerestory windows that allow natural light into the interiors. The new finishes, millwork, furniture, casework, and lighting created an inviting and fully accessible community environment for library patrons.

Headquartered in Patchogue, NY, BBS Architects & Engineers is a leading Long Island and Tri-state area designer of sustainable commercial, institutional and public facilities. The firm designed the first LEED-certified public school in New York State ­– the Hampton Bays Middle School in Hampton Bays, NY – which received LEED Silver certification, indicating a very high level of environmental sustainability in design and construction practices. BBS services include architecture and interior design as well as mechanical, electrical and plumbing engineering. 

The firm’s current and recent work includes the 100-room Hyatt Place East End hotel in Riverhead, NY; the new $28.5-million Life Sciences Building at the Suffolk County Community College Ammerman Campus in Selden, NY; the $78.2-million Riverhead Central School District expansion and capital improvement program in Riverhead, NY; the Holy Sepulchre Cemetery Administrative Building in Coram, NY; and the new Sacred Heart Roman Catholic Church in North Merrick, NY. BD+C

Related Stories

| Dec 6, 2011

Construction industry leaders gather for forum on diversity

Declared a “groundbreaking” event for the industry, Gilbane’s First Annual National Partners Council Forum addressed diversity and inclusion as well as building partnerships with minority, veteran, and women-owned businesses.

| Dec 6, 2011

Mortenson Construction completes Elk Wind Project in Iowa

By the end of 2011, Mortenson will have built 17 wind projects in the state generating a total of 1894 megawatts of renewable power.

| Dec 6, 2011

?ThyssenKrupp acquires Sterling Elevators Services

The acquisition of Sterling Elevator Services Corporation is the third acquisition completed by ThyssenKrupp Elevator AG in the last three months in North America. 

| Dec 6, 2011

Vivenzio named vice president of building performance practice at Thornton Tomasetti’s New York Office

Vivenzio, a licensed architect in New York and New Jersey, has more than 28 years of experience in architectural project management, construction administration, building diagnostic services and forensic investigation.

| Dec 6, 2011

New office building features largest solar panel system in New Orleans

Woodward Design+Build celebrates grand opening of new green headquarters in Central City.

| Dec 5, 2011

New York and San Francisco receive World Green Building Council's Government Leadership Awards

USGBC commends two U.S. cities for their innovation in green building leadership.

| Dec 5, 2011

Summit Design+Build begins renovation of Chicago’s Esquire Theatre

The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.

| Dec 5, 2011

Fraser Brown MacKenna wins Green Gown Award

Working closely with staff at Queen Mary University of London, MEP Engineers Mott MacDonald, Cost Consultants Burnley Wilson Fish and main contractor Charter Construction, we developed a three-fold solution for the sustainable retrofit of the building.

| Dec 5, 2011

RJM Construction begins building Nova Classical Academy in St. Paul

As the general contractor, RJM is constructing the 94,000-sf building that will consolidate the St. Paul school’s two other locations. 

| Dec 5, 2011

Gables Residential brings mixed-use building to Houston's Tanglewood area

The design integrates a detailed brick and masonry facade, acknowledging the soft pastel color palette of the surrounding Mediterranean heritage of Tanglewood.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021