flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

BD+C 2021 Building Team Awards Payment Information

Building Team Awards

BD+C 2021 Building Team Awards Payment Information


By BD+C Staff | March 12, 2021

 

Payment Information ($250.00 per entry)

Download form as a Word file

 

Credit Card Type_______________________________________

Cardholder's Name_____________________________________

Cardholder's Address___________________________________

____________________________________________________

____________________________________________________

Credit Card Number____________________________________

Expiration Date________________________________________

Amount______________________________________________

Company name_______________________________________

Authorization (if other than cardholder)

____________________________________________________

Today's Date_________________________________________

 

Please include this payment sheet in your submission and send to David Barista, Editorial Director, dbarista@sgcmail.com by May 14, 2021. 


If paying by check, please make payable to "SGC Horizon" and mail check to:

Building Design+Construction
3030 W. Salt Creek Lane, Ste. 201
Arlington Heights, IL 60005
Attn: David Barista

Questions? Contact David Barista, Editor-in-Chief, at dbarista@sgcmail.com or 847-954-7929.

Related Stories

Building Team Awards | Apr 9, 2015

IPD-driven fusion facility serves science and student life in Chicago

In dire need of modern science labs and a student union, North Park University built both—in the same building.

Building Team Awards | Apr 9, 2015

‘Prudent, not opulent’ sets the tone for this Catholic hospital

This Building Team stuck with a project for seven years to get a new hospital built for a faithful client.

Building Team Awards | Apr 9, 2015

9/11 museum triumphs over controversy

The Building Team for this highly visible project had much more than design, engineering, and construction problems to deal with.

Building Team Awards | Apr 7, 2015

Unique test facility will help make wind power more feasible

A new facility at Clemson University makes it possible to test the huge stresses that large-scale wind turbines must be able to withstand.

Building Team Awards | Apr 5, 2015

UK's leading foot and mouth disease lab turns containment design inside out

A daring Building Team breaks the bunker mentality common to research containment with this light-filled, open facility in the English countryside.

Building Team Awards | Apr 5, 2015

‘Project first’ philosophy shows team’s commitment to a true IPD on the San Carlos Center

Skanska and NBBJ join forces with Sutter Health on a medical center project where all three parties share the risk.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021