1. Integrated sink system
Sloan
Project: Planet Fitness, Palmdale, Calif. Problem: Members of previous Planet Fitness locations complained of excess water on countertops and floors, which led to safety hazards. Solution: Sloan installed the AER-DEC sink system that features a sink basin, faucet, soap dispenser, and hand dryer all within an arm’s reach. The touch-free, integrated system eliminated the trips between sinks and hand dryers that caused the excess water on countertops and floors.
2. Insulated metal panels
Mcelroy metal
Project: CubeSmart, Cranston, R.I. Problem: Self-storage facilities are often mundane buildings. CubeSmart wanted to buck the trend. Solution: The two buildings that make up the storage facility were clad in a staggered arrangement of 29,000 sf of Ash Gray panels and 10,000 sf of CubeSmart Red panels. On the team: Lacuna Design (architect), Ubane Construction (GC), and EKM Construction (IMP installer).
3. Aluminum Composite Panels
3A Composites USA
Project: South Texas College Technology Campus expansion, McAllen, Texas. Problem: The new university building needed a colorful, durable product to use as a decorative theme for the college while retaining an industrial look. Solution: 15,200 sf of 4mm Alucobond aluminum composite material in custom colors was juxtaposed with cream-colored brick and brown split-face block wainscot on the building’s façade. Also used: 6,200 sf of custom STC Green; 2,700 sf of custom STC Violet; and 6,300 sf of Silver Metallic. On the team: EGV Architects (architect) and E-Con Group (GC).
4. High-efficiency windows
Linetec and winco windows
Project: Vida, San Francisco. Problem: A mixed-use building wanted a neutral, energy-efficient contrast for its colorful façade, which reflects the color and texture of the neighborhood’s Latin-influenced murals and crafts. Solution: Winco Windows’ 1450 Series 4-inch unitized window wall and 3325 Series 3.25-inch zero sightline vents, finished by Linetec in Snow White color. The finish improves thermal performance while maintaining the long-term durability of the fenestration. On the team: DLR Group, Kwan Henmi (architects), Build Group (GC), Bagatelos Architectural Glass Systems (glazing contractor).
5. Energy-efficient roof system
Firestone Building Products
Project: Bridgestone Tower, Nashville, Tenn. Problem: To achieve LEED Gold certification, the project team needed an energy-efficient roof system. Solution: Firestone Building Products’ UltraPly TPO and ISO 95+ were used for the project. UltraPly TPO added LEED points to the design, operation, and maintenance of the building. Its white reflective surface exceeds the EPA’s Energy Star requirements. ISO 95+ offers the highest R-value ratings per inch compared to other insulation materials, says the maker.
6. Metal Panel Exterior
Centria
Project: Richland County Decker Center, Columbia, S.C. Problem: The building needed to be visually unified and eliminate any semblance of its former purpose as a strip mall. Solution: Formawall panels in an Off White color with a smooth finish were contrasted with Formawall panels in Chromium Gray across the main building façade. Versawall embossed insulated metal panels in Silver and metallic Sundance AM coating were used around the rear of the building. On the team: Boudreaux (architect), H.G. Reynolds (GC), SECO Architectural Systems (metal panel installer).
Related Stories
| Dec 27, 2011
State of the data center 2011
Advances in technology, an increased reliance on the Internet and social media as well as an increased focus on energy management initiatives have had a significant impact on the data center world.
| Dec 21, 2011
Hoboken Terminal restoration complete
Restoration of ferry slips, expanded service to benefit commuters.
| Dec 21, 2011
BBI key to Philly high-rise renovation
The 200,000 sf building was recently outfitted with a new HVAC system and a state-of-the-art window retrofitting system.
| Dec 20, 2011
Research identifies most expensive U.S. commercial real estate markets
New York City, Washington, D.C. and San Mateo, Calif., rank highest in rents.
| Dec 20, 2011
BCA’s Best Practices in New Construction available online
This publicly available document is applicable to most building types and distills the long list of guidelines, and longer list of tasks, into easy-to-navigate activities that represent the ideal commissioning process.
| Dec 14, 2011
Belfer Research Building tops out in New York
Hundreds of construction trades people celebrate reaching the top of concrete structure for facility that will accelerate treatments and cures at world-renowned institution.
| Dec 14, 2011
Tyler Junior College and Sika Sarnafil team up to save energy
Tyler Junior College wanted a roofing system that wouldn’t need any attention for a long time.
| Dec 13, 2011
Lutron’s Commercial Experience Center awarded LEED Gold
LEED certification of the Lutron facility was based on a number of green design and construction features that positively impact the project itself and the broader community. These features include: optimization of energy performance through the use of lighting power, lighting controls and HVAC, plus the use of daylight.