1. Integrated sink system
Sloan
Project: Planet Fitness, Palmdale, Calif. Problem: Members of previous Planet Fitness locations complained of excess water on countertops and floors, which led to safety hazards. Solution: Sloan installed the AER-DEC sink system that features a sink basin, faucet, soap dispenser, and hand dryer all within an arm’s reach. The touch-free, integrated system eliminated the trips between sinks and hand dryers that caused the excess water on countertops and floors.
2. Insulated metal panels
Mcelroy metal
Project: CubeSmart, Cranston, R.I. Problem: Self-storage facilities are often mundane buildings. CubeSmart wanted to buck the trend. Solution: The two buildings that make up the storage facility were clad in a staggered arrangement of 29,000 sf of Ash Gray panels and 10,000 sf of CubeSmart Red panels. On the team: Lacuna Design (architect), Ubane Construction (GC), and EKM Construction (IMP installer).
3. Aluminum Composite Panels
3A Composites USA
Project: South Texas College Technology Campus expansion, McAllen, Texas. Problem: The new university building needed a colorful, durable product to use as a decorative theme for the college while retaining an industrial look. Solution: 15,200 sf of 4mm Alucobond aluminum composite material in custom colors was juxtaposed with cream-colored brick and brown split-face block wainscot on the building’s façade. Also used: 6,200 sf of custom STC Green; 2,700 sf of custom STC Violet; and 6,300 sf of Silver Metallic. On the team: EGV Architects (architect) and E-Con Group (GC).
4. High-efficiency windows
Linetec and winco windows
Project: Vida, San Francisco. Problem: A mixed-use building wanted a neutral, energy-efficient contrast for its colorful façade, which reflects the color and texture of the neighborhood’s Latin-influenced murals and crafts. Solution: Winco Windows’ 1450 Series 4-inch unitized window wall and 3325 Series 3.25-inch zero sightline vents, finished by Linetec in Snow White color. The finish improves thermal performance while maintaining the long-term durability of the fenestration. On the team: DLR Group, Kwan Henmi (architects), Build Group (GC), Bagatelos Architectural Glass Systems (glazing contractor).
5. Energy-efficient roof system
Firestone Building Products
Project: Bridgestone Tower, Nashville, Tenn. Problem: To achieve LEED Gold certification, the project team needed an energy-efficient roof system. Solution: Firestone Building Products’ UltraPly TPO and ISO 95+ were used for the project. UltraPly TPO added LEED points to the design, operation, and maintenance of the building. Its white reflective surface exceeds the EPA’s Energy Star requirements. ISO 95+ offers the highest R-value ratings per inch compared to other insulation materials, says the maker.
6. Metal Panel Exterior
Centria
Project: Richland County Decker Center, Columbia, S.C. Problem: The building needed to be visually unified and eliminate any semblance of its former purpose as a strip mall. Solution: Formawall panels in an Off White color with a smooth finish were contrasted with Formawall panels in Chromium Gray across the main building façade. Versawall embossed insulated metal panels in Silver and metallic Sundance AM coating were used around the rear of the building. On the team: Boudreaux (architect), H.G. Reynolds (GC), SECO Architectural Systems (metal panel installer).
Related Stories
| Aug 11, 2010
Gensler, Arup, HOK among the largest office sector design firms
A ranking of the Top 100 Office Design firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
Callison strengthens retail design presence with RYA acquisition
Callison LLC on June 1 acquired RYA Design Consultancy, a Dallas-based retail architecture and design firm with offices in New York City. The new “Callison RYA Studio” will merge staff and clients into Callison ’s existing retail practice at their Dallas and New York offices.
| Aug 11, 2010
RSMeans/RCD forecast 14% drop in hospital construction for 2009
RSMeans forecasts a 14% drop in hospital construction in 2009 compared to 2008, with $17.1 billion in registered hospital projects as of June 30, 2009. The Reed Construction Data unit finds renovation of healthcare facilities increasing, from 36% of projects in 2008, to 40% of projects in the pipeline in the first six months of 2009.
| Aug 11, 2010
Prism-shaped design unveiled for five-star hotel in Saudi Arabia
Goettsch Partners has been commissioned by Saudi Oger Ltd. to design a new five-star, 214-key business hotel in the King Abdullah Financial District in Riyadh, Saudi Arabia. As a design-build assignment, Saudi Oger is serving as the contractor, selected by developer Rayadah Investment Company. The project is sited on Parcel 1.08, one of the first 10 parcels currently under development in the massive new master-planned district.
| Aug 11, 2010
Data center construction costs are down, according to a study by Environmental Systems Design
The current economic crisis has an up-side for owners of mission-critical facilities: On average, it costs less today to construct a new data center than it did in late 2007, according to a study by Environmental Systems Design (ESD). ESD found that the prices of feeder and cable have dropped by more than half, major data center equipment by 12%, labor and materials by 19.6%, and shipping and handling by 15% from the fourth quarter of 2007 to July 15, 2009.
| Aug 11, 2010
Construction Specifications Institute to end support of MasterFormat 95 on December 31, 2009
The Construction Specifications Institute (CSI) announced that the organization will cease to license and support MasterFormat 95 as of December 31, 2009. The CSI Board of Directors voted to stop licensing and supporting MasterFormat 95 during its June 16, 2009, meeting at the CSI Annual Convention in Indianapolis.
| Aug 11, 2010
Gensler among eight teams named finalists in 'classroom of the future' design competition
Eight teams were recognized today as finalists of the 2009 Open Architecture Challenge: Classroom. Finalists submitted designs ranging from an outdoor classroom for children in inner-city Chicago, learning spaces for the children of salt pan workers in India, safe spaces for youth in Bogota, Colombia and a bamboo classroom in the Himalayan mountains.
| Aug 11, 2010
9 rooftop photovoltaic installation tips
The popularity of rooftop photovoltaic (PV) panels has exploded during the past decade as Building Teams look to maximize building energy efficiency, implement renewable energy measures, and achieve green building certification for their projects. However, installing rooftop PV systems—rack-mounted, roof-bearing, or fully integrated systems—requires careful consideration to avoid damaging the roof system.