1. Lighting for rehearsal space
USAI Lighting
Project: Voxman Music Building, University of Iowa, Iowa City. Problem: A 2008 flood ruined the Voxman Music Building, causing the university to rebuild and relocate the facility. The new space required functional, well-lit performance and rehearsal spaces. Solution: USAI Lighting’s BeveLED 2.1 Classic White fixtures were incorporated into rehearsal spaces due to their high intensity and ability to withstand the constant and intense sound waves produced by the instruments. On the team: HLB LA (lighting designer).
2. Nature-inspired, sculptural ceiling
Pinta Acoustics
Project: Children’s Discovery Museum of San Jose, Calif. Problem: For the museum’s newly renovated circulation area, the design team wanted to create a dramatic, nature-inspired sculpture to signify the transition from the main museum to the outdoor nature exploration area, Bill’s Backyard. Solution: Pinta Acoustics’ WILLTEC foam material was used to create custom abstract butterfly shapes that provide acoustical control and create movement in the circulation area. The flat sheets are available in various shapes and sizes up to 48x96 inches, and thicknesses up to four inches. On the team: Modulus (architect).
3. Veiled metal panels
Centria
Project: Broadcom Parking Garage, Moon Township, Pa. Problem: The renovation of the existing structure needed a product to make it appear more open and interact better with its surroundings. Solution: Centria provided 20,050 sf of EcoScreen Cascade perforated metal panels in Champagne Pearl and Clay. The metallic veil of perforated metal allowed the project team to screen car headlights from users and neighbors while allowing daylight and ventilation to flow through. On the team: HOK (architect) and Devcon Construction (GC).
4. High-performance sunshades
Mermet
Project: Drayton Mills Elementary School, Spartanburg, S.C. Problem: Natural light and views improve student performance, but there are times in a school setting when light is not desired. Solution: The school features Mermet’s E Screen in 3% openness and Avila Twilight 100% blackout fabrics in charcoal. The dark fabrics were chosen to blend with the inherent color of the SunGuard coated glass that was used to minimize the appearance of the shades from the exterior. The sunshades combined with the glass maximize thermal control. On the team: McMillan Pazdan Smith (architect) and Draper Inc. (fabricator).
5. Symmetrical standing seam panels
McElroy
Project: Roma High School, Roma, Texas. Problem: The school had issues with roof leaks at various transition points that were causing excessive damage. Solution: The original leaky tile roof was removed and replaced with McElroy’s 138T symmetrical standing seam metal roofing. The system was also used to re-cover an existing roof. The symmetrical nature of the panels allowed for the installation to begin anywhere on the roof. On the team: Amtech (design and restoration consulting firm) and Rio Roofing (onsite roll forming).
6. Continuous wall insulation
Atlas Roofing
Project: Kaiser Permanente Medical Building, La Habra, Calif. Problem: The newly constructed 28,000-sf building features 25 exam rooms and 16 physician offices that required the maximization of occupant comfort and energy efficiency while maintaining compliance with environmental regulations. Solution: HMC Architects specified Atlas EnergyShield Pro continuous wall insulation in tandem with the patented Diamond Furr TT-4 lath attachment system by Brand X Metals. According to Atlas, EnergyShield Pro provides the highest R-value per inch of any insulation and resists water, air, and vapor penetration. It offers zero ozone depletion potential and zero global warming potential. On the team: HMC Architects (architect) and Swinerton Builders (GC).
Related Stories
| Apr 3, 2012
Luxury hotel 'groundscraper' planned in abandoned quarry
Would you spend $300 a night to sleep underground? You might, once you see the designs for China's latest hotel project.
| Apr 3, 2012
Educational facilities see long-term benefits of fiber cement cladding
Illumination Series panels made for a trouble-free, quick installation at a cost-effective price. The design for Red Hawk Elementary School stems from the desire to create a vibrant place for kids to learn. In an effort to achieve this design, RB+B Architects selected Nichiha USA to provide a durable yet modern, contemporary exterior finish.
| Mar 22, 2012
Hawaiian architecture firm chooses FRP trellis system over traditional materials
MGA Architecture plans to add five more trellis systems on the neighboring building.
| Mar 16, 2012
Marvin Windows and Doors accepting entries for fourth-annual myMarvin Architect’s Challenge
Architects in U.S. and abroad offered the chance to showcase their very best work.
| Mar 13, 2012
Commercial glazer Harmon expanding into Texas
Company expanding into the Texas market with a new office in Dallas and a satellite facility in Austin.
| Mar 12, 2012
Improving the performance of existing commercial buildings: the chemistry of sustainable construction
Retrofitting our existing commercial buildings is one of the key steps to overcoming the economic and environmental challenges we face.
| Mar 5, 2012
Franklin Institute in Philadelphia selects Skanska to construct new pavilion
The building has been designed by SaylorGregg Architects and will apply for LEED Silver certification.
| Mar 1, 2012
Intelligent construction photography, not just pretty pictures
Our expert tells how to organize construction progress photos so you don’t lose track of all the valuable information they contain.