1. Lighting for rehearsal space
USAI Lighting
Project: Voxman Music Building, University of Iowa, Iowa City. Problem: A 2008 flood ruined the Voxman Music Building, causing the university to rebuild and relocate the facility. The new space required functional, well-lit performance and rehearsal spaces. Solution: USAI Lighting’s BeveLED 2.1 Classic White fixtures were incorporated into rehearsal spaces due to their high intensity and ability to withstand the constant and intense sound waves produced by the instruments. On the team: HLB LA (lighting designer).
2. Nature-inspired, sculptural ceiling
Pinta Acoustics
Project: Children’s Discovery Museum of San Jose, Calif. Problem: For the museum’s newly renovated circulation area, the design team wanted to create a dramatic, nature-inspired sculpture to signify the transition from the main museum to the outdoor nature exploration area, Bill’s Backyard. Solution: Pinta Acoustics’ WILLTEC foam material was used to create custom abstract butterfly shapes that provide acoustical control and create movement in the circulation area. The flat sheets are available in various shapes and sizes up to 48x96 inches, and thicknesses up to four inches. On the team: Modulus (architect).
3. Veiled metal panels
Centria
Project: Broadcom Parking Garage, Moon Township, Pa. Problem: The renovation of the existing structure needed a product to make it appear more open and interact better with its surroundings. Solution: Centria provided 20,050 sf of EcoScreen Cascade perforated metal panels in Champagne Pearl and Clay. The metallic veil of perforated metal allowed the project team to screen car headlights from users and neighbors while allowing daylight and ventilation to flow through. On the team: HOK (architect) and Devcon Construction (GC).
4. High-performance sunshades
Mermet
Project: Drayton Mills Elementary School, Spartanburg, S.C. Problem: Natural light and views improve student performance, but there are times in a school setting when light is not desired. Solution: The school features Mermet’s E Screen in 3% openness and Avila Twilight 100% blackout fabrics in charcoal. The dark fabrics were chosen to blend with the inherent color of the SunGuard coated glass that was used to minimize the appearance of the shades from the exterior. The sunshades combined with the glass maximize thermal control. On the team: McMillan Pazdan Smith (architect) and Draper Inc. (fabricator).
5. Symmetrical standing seam panels
McElroy
Project: Roma High School, Roma, Texas. Problem: The school had issues with roof leaks at various transition points that were causing excessive damage. Solution: The original leaky tile roof was removed and replaced with McElroy’s 138T symmetrical standing seam metal roofing. The system was also used to re-cover an existing roof. The symmetrical nature of the panels allowed for the installation to begin anywhere on the roof. On the team: Amtech (design and restoration consulting firm) and Rio Roofing (onsite roll forming).
6. Continuous wall insulation
Atlas Roofing
Project: Kaiser Permanente Medical Building, La Habra, Calif. Problem: The newly constructed 28,000-sf building features 25 exam rooms and 16 physician offices that required the maximization of occupant comfort and energy efficiency while maintaining compliance with environmental regulations. Solution: HMC Architects specified Atlas EnergyShield Pro continuous wall insulation in tandem with the patented Diamond Furr TT-4 lath attachment system by Brand X Metals. According to Atlas, EnergyShield Pro provides the highest R-value per inch of any insulation and resists water, air, and vapor penetration. It offers zero ozone depletion potential and zero global warming potential. On the team: HMC Architects (architect) and Swinerton Builders (GC).
Related Stories
| Sep 23, 2011
Fire and hurricane rated glazed wall assemblies installed at multi-family residence in Florida
Fire and hurricane assemblies meet design and code requirements.
| Sep 23, 2011
Curtainwall façade installation at Ohio State Cancer and Critical Care facility
A sophisticated curtainwall facade will be installed at the new OSU Cancer and Critical Care facility.
| Sep 23, 2011
Okanagan College sets sights on Living Buildings Challenge
The Living Building Challenge requires projects to meet a stringent list of qualifications, including net-zero energy and water consumption, and address critical environmental, social and economic factors.
| Sep 14, 2011
USGBC L.A. Chapter's Green Gala features Jason McLennan as keynote speaker
The Los Angeles Chapter of the nonprofit USGBC will launch its Sustainable Innovation Awards this year during the chapter's 7th Annual Green Gala on Thursday, November 3.
| Sep 14, 2011
More than 200 events planned for third annual SteelDay September 23
Special events in major cities including New York City, Chicago, Washington, D.C., and more.
| Sep 14, 2011
Lend Lease’s role in 9/11 Memorial & Museum
Lend Lease is honored to be the general contractor for the National September 11 Memorial & Museum project at the World Trade Center site in New York City.
| Sep 14, 2011
Research shows large gap in safety focus
82% of public, private and 2-year specialized colleges and universities believe they are not very effective at managing safe and secure openings or identities.
| Sep 12, 2011
LACCD’s $6 billion BIM connection
The Los Angeles Community College District requires every design-build team in its massive modernization program to use BIM, but what they do with their 3D data after construction is completed may be the most important change to business as usual.
| Sep 12, 2011
PVs play new roles as a teaching tool
Solar installations are helping K-12 schools around the country save money and teach students the intricacies of renewable energy sources.
| Sep 12, 2011
Living Buildings: Are AEC Firms up to the Challenge?
Modular Architecture > You’ve done a LEED Gold or two, maybe even a LEED Platinum. But are you and your firm ready to take on the Living Building Challenge? Think twice before you say yes.