flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Beck Group/Atlanta wins AGC Build Georgia Award

Beck Group/Atlanta wins AGC Build Georgia Award

Site-specific safety plan, BIM analysis and third-party structural review contributed to successful implementation.


By Posted by Tim Gregorski, Senior Editor | June 15, 2012

The Beck Group has been awarded The 2012 Build Georgia Award by the Associated General Contractors of America (AGC) for its Cave Spring Rehabilitation Center project.

Beck was the Construction Manager at Risk on the project which was completed on budget by the defined completion date, with zero lost-time accidents. 

The Georgia Department of Labor’s Cave Spring Rehabilitation Center provides job and life skills training for people with disabilities, specializing in those with hearing impairments. As part of the project, The Beck Group replaced 50-year-old buildings with a state-of-the-art campus facility that allows for the future expansion of client services. Project plans included designing the new facilities with ADA Plus capabilities, which emphasizes accessibility and technology to meets the needs of those with disabilities.

The end result produced a 17,690-sf classroom/administration building and a 19,690-sf,, two-story dormitory with 52 beds, a restaurant-style kitchen and hotel grade laundry facilities.

Both structures were built to accommodate and train students in the food services and hotel industries and were also equipped with a message board and visual convenience/emergency notification system specifically tailored to those with hearing impairments. Additionally, two teaching greenhouses, an outdoor amphitheater, basketball court, dog walking park and walking trails were completed. 

With this achievement, The Beck Group has accumulated more than 500 construction, design, real estate and organizational awards, including Fortune’s 100 Best Places to Work. The company’s craftsmanship and respectful rapport with clients, subcontractors and industry colleagues contributes to Beck’s reputation for delivering Better Buildings, Better Built. +

Related Stories

| May 23, 2013

Supertall 'Sky City' will house 4,400 families in Changsha, China

Broad Sustainable Building has completed a long and arduous approval process, and is starting excavation and construction on Sky City in June, 2013. The proposed "world's tallest building" will be a mixed-use project that could accommodate life and work needs of up to 30,000 people.

| May 23, 2013

Are design-build contracts killing small architecture firms?

Are federal design-build contract laws unfair to small firms? AIA thinks so, citing an interesting fact: an architecture firm spends a median of $260,000 to compete for a design-build project.

| May 23, 2013

Is the 'bring your own device' discussion stumping your IT group?

A new twist to the communication challenge most companies and IT departments face is the “bring your own device,” or BYOD, conundrum. I call it a conundrum because it is stumping many IT professionals.

| May 23, 2013

Portland State University’s School of Architecture launches Center for Public Interest Design

Portland State University’s School of Architecture is proud to announce the launch of its new Center for Public Interest Design, a research center that aims to investigate and utilize the power of design to make social, economic and environmental change in disadvantaged communities worldwide. The Center is the first of its kind in the nation.

| May 22, 2013

Return of retail? Rent growth seen in recovering markets

Like digging a ditch with a spoon, retail demand driven by population growth has eaten away at the supply of available store space in the markets that have been slowest to recover from the downturn. Vacancy rates are reaching a point that will give at least some landlords in every market the clout to demand slightly higher rents.

| May 22, 2013

New ASTM standard enhances hollow structural sections

ASTM A1085 is a big step forward in simplifying HSS design and usage, thereby making it a more desirable option for HSS.

| May 22, 2013

Architecture billings take a step back in April, ending growth streak

For the first time in 10 months, the AIA's Architecture Billings Index slipped into negative territory, falling to 48.6 in April, down from 51.9 the previous month. This is the ABI's lowest mark since July 2012.

| May 21, 2013

Foster + Partners reveals plans for London residential towers

  British firm Foster + Partners has unveiled plans for two residential skyscrapers as part of a mixed-use development in north London.

| May 21, 2013

RSMeans cost comparisons: pools, racquetball courts, bowling alleys, hockey/soccer facilities

Construction market analysts from RSMeans offer construction costs per square foot for four building types across 25 metro markets.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021