The Beck Group has been awarded The 2012 Build Georgia Award by the Associated General Contractors of America (AGC) for its Cave Spring Rehabilitation Center project.
Beck was the Construction Manager at Risk on the project which was completed on budget by the defined completion date, with zero lost-time accidents.
The Georgia Department of Labor’s Cave Spring Rehabilitation Center provides job and life skills training for people with disabilities, specializing in those with hearing impairments. As part of the project, The Beck Group replaced 50-year-old buildings with a state-of-the-art campus facility that allows for the future expansion of client services. Project plans included designing the new facilities with ADA Plus capabilities, which emphasizes accessibility and technology to meets the needs of those with disabilities.
The end result produced a 17,690-sf classroom/administration building and a 19,690-sf,, two-story dormitory with 52 beds, a restaurant-style kitchen and hotel grade laundry facilities.
Both structures were built to accommodate and train students in the food services and hotel industries and were also equipped with a message board and visual convenience/emergency notification system specifically tailored to those with hearing impairments. Additionally, two teaching greenhouses, an outdoor amphitheater, basketball court, dog walking park and walking trails were completed.
With this achievement, The Beck Group has accumulated more than 500 construction, design, real estate and organizational awards, including Fortune’s 100 Best Places to Work. The company’s craftsmanship and respectful rapport with clients, subcontractors and industry colleagues contributes to Beck’s reputation for delivering Better Buildings, Better Built. +
Related Stories
| May 25, 2011
Developers push Manhattan office construction
Manhattan developers are planning the city's biggest decade of office construction since the 1980s, betting on rising demand for modern space even with tenants unsigned and the availability of financing more limited. More than 25 million sf of projects are under construction or may be built in the next nine years.
| May 25, 2011
Olympic site spurs green building movement in UK
London's environmentally friendly 2012 Olympic venues are fuelling a green building movement in Britain.
| May 25, 2011
TOTO tests universal design at the AIA conference
If you could be 80 years old for 30 minutes—and have to readjust everything you think you know about your own mobility—would you do it?
| May 20, 2011
Hotels taking bath out of the bathroom
Bathtubs are disappearing from many hotels across the country as chains use the freed-up space to install ever more luxurious showers, according to a recent USAToday report. Of course, we reported on this move--and 6 other hospitality trends--back in 2006 in our special report "The Inn Things: Seven Radical New Trends in Hotel Design."
| May 19, 2011
BD+C’s "40 Under 40" winners for 2011
The 40 individuals profiled here are some of the brightest stars in the AEC universe—and they’re under the age of 40. These young architects, engineers, contractors, designers, and developers stood out among a group of 164 outstanding entrants in our sixth annual “40 Under 40” competition.
| May 18, 2011
Sanford E. Garner on the profitability of being diverse
Sanford E. Garner, AIA, NOMA, LEED AP ND, NCARB, founding partner and president of A2SO4 Architecture, LLC, Indianapolis, on gentrification, the profitability of being diverse, and his goals as NOMA president.
| May 18, 2011
8 Tips for Designing Wood Trusses
Successful metal-plate-connected wood truss projects require careful attention to detail from Building Team members.
| May 18, 2011
Major Trends in University Residence Halls
They’re not ‘dorms’ anymore. Today’s collegiate housing facilities are lively, state-of-the-art, and green—and a growing sector for Building Teams to explore.
| May 18, 2011
Former Bronx railyard redeveloped as shared education campus
Four schools find strength in numbers at the new 2,310-student Mott Haven Campus in New York City. The schools—three high schools and a K-4 elementary school—coexist on the 6.5-acre South Bronx campus, which was once a railyard.