flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

BIA opens entries for 2013 Brick in Architecture Awards

BIA opens entries for 2013 Brick in Architecture Awards

Categories added to honor nationwide design excellence


By BIA | February 28, 2013
2012 Brick in Architecture Winner: Ogden International School of Chicago. Photo:
2012 Brick in Architecture Winner: Ogden International School of Chicago. Photo: Ballogg Photography

The Brick Industry Association (BIA) has opened entry submissions for its 2013 Brick In Architecture Awards—with a new Renovation/Restoration category and new category divisions this year. BIA’s annual awards honor architectural excellence and sustainable design nationwide that incorporates clay brick products as the predominant exterior building or paving material. Entries are due by April 30. To enter and for details, go to: http://www.gobrick.com/EventsEducation/BrickInArchitectureAwards/tabid/7661/Default.aspx

The 2013 awards competition will be conducted entirely online. Architectural and design firms from around the country can enter their best material to be judged by a jury of their peers.

“As a versatile building material made in America made from abundant natural resources, there is no substitute for genuine clay brick,” said BIA President and CEO Gregg Borchelt, P.E. “In addition to its unmatched durability and many benefits from its physical properties, brick offers aesthetic flexibility to match the architect’s imagination and desires, and is a main element in sustainable design,” he said.

As the largest and most prestigious juried competition of its kind, entries can be submitted in one or more of the below categories:

  • Commercial (Under $10 Million) – New
  • Commercial (Over $10 Million) – New
  • Education – K-12
  • Education – Colleges & Universities (Higher Education)* – New
  • Health Care Facilities
  • Municipal / Government
  • Houses of Worship
  • Residential – Single Family
  • Residential – Multi-Family
  • Renovation (Additions)** / Restoration (Restoring) – New
  • Paving & Landscape Projects

*Includes residence halls & academic/administrative buildings

**Additions must use at least 50 percent new clay brick products on the building. Restoration construction must include at least 50% clay brick products, which can either be new or salvaged.

For complete information on eligibility, submission requirements, and judging, visit
http://www.gobrick.com/EventsEducation/BrickInArchitectureAwards/tabid/7661/Default.aspx

Founded in 1934, the Brick Industry Association (BIA) is the nationally recognized authority on clay brick construction representing the nation’s distributors and manufacturers of clay brick and suppliers of related products. Web site: www.gobrick.com /703-620-0010.

Related Stories

| Sep 23, 2013

The art of rewarding employees

What’s the best way to reward those employees who go the extra mile, particularly when it’s not always feasible to give large financial bonuses? According to author and “recognition expert” Dr. Bob Nelson, the most effective employee rewards are also the least expensive. 

| Sep 23, 2013

Six-acre Essex Crossing development set to transform vacant New York property

A six-acre parcel on the Lower East Side of New York City, vacant since tenements were torn down in 1967, will be the site of the new Essex Crossing mixed-use development. The product of a compromise between Mayor Michael Bloomberg and various interested community groups, the complex will include ~1,000 apartments.

| Sep 20, 2013

August housing starts reveal multifamily still healthy but single-family stagnating

Peter Muoio, Ph.D., senior principal and economist with Auction.com Research, says the Census Bureau's August Housing Starts data released yesterday hints at improvements in the single-family sector with multifamily slowing down.

| Sep 19, 2013

What we can learn from the world’s greenest buildings

Renowned green building author, Jerry Yudelson, offers five valuable lessons for designers, contractors, and building owners, based on a study of 55 high-performance projects from around the world.

| Sep 19, 2013

6 emerging energy-management glazing technologies

Phase-change materials, electrochromic glass, and building-integrated PVs are among the breakthrough glazing technologies that are taking energy performance to a new level. 

| Sep 18, 2013

Annual SteelDay to include 125 free events around the U.S.

Hosted by the American Institute of Steel Construction (AISC), its members and partners, SteelDay invites the AEC community and the public to see the contributions the industry has made in the design and construction of steel buildings and bridges. 

| Sep 18, 2013

WHR Architects opens first European office, in Copenhagen

WHR Architects has opened its first European office in Copenhagen, Denmark. The decision to locate in the Danish capital was spurred by the Danish healthcare system’s initiative to renew and expand their facilities across the country.

| Sep 17, 2013

NCARB convenes special task force to explore additional pathways to architectural licensure

Potential new pathways to architectural licensure are being explored through the work of a new Licensure Task Force launched by the National Council of Architectural Registration Boards (NCARB). Led by NCARB Immediate Past President Ronald B. Blitch, FAIA, FACHA, NCARB, the group held its first meeting at NCARB offices on September 6-7 in Washington, DC. 

| Sep 17, 2013

SMPS Foundation announces new business development research book

The SMPS Foundation has released its latest research book, A/E/C BUSINESS DEVELOPMENT – The Decade Ahead. 

| Sep 17, 2013

Healthcare project will merge outpatient clinic with YMCA to promote wellness and prevention

Penrose-St. Francis Health Services and the YMCA of the Pikes Peak Region announce collaboration, along with developer The Boldt Company, to create next-generation wellness facility.  

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021