flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Biden Administration will make new investments in building energy efficiency

Codes and Standards

Biden Administration will make new investments in building energy efficiency

Focus on grid-interactive buildings; Energy Star expansion; new targets for energy, water reduction.


By Peter Fabris, Contributing Editor | May 24, 2021

Courtesy Pixabay

The Biden Administration recently announced new federal investments in building energy efficiency and electrification, as well as new opportunities to modernize homes and businesses.

Among the initiatives is an interagency federal sustainability effort to develop the first-ever building performance standards (BPS) for the federal government. BPS will establish metrics, targets, and tracking methods to reach federal carbon emissions goals. The standards will identify progressive performance milestones as well as the resources that agencies need to meet them.

A low-carbon buildings pilot will be launched. Through the Department of Energy’s Better Buildings Initiative, DOE revealed the first 55 commercial, industrial, and multifamily organizations to participate in a program that will share lessons learned for real world pathways to low- and no-emission buildings.

The Environmental Protection Agency said it is launching new residential and commercial sector partnerships to accelerate efficiency and electrification retrofits. This program will have a focus on underserved residential households through the Energy Star Home Upgrade program, accelerate building electrification through an advanced Energy Star certification for new residential buildings, and recognize commercial buildings through a new zero-carbon commercial building certification. It will also launch a new Greenhouse Gas tool linked to its Portfolio Manager tool.

The announcement included the release of a blueprint to integrate grid-interactive buildings into Energy Savings Contracts and new Energy Star standards to advance heat pump technology and fast chargers for electric vehicles.

Related Stories

| Jul 31, 2014

Gypsum Association releases updates to wallboard repair standards

The Gypsum Association released updates to both GA-221 Repair of Joint Ridging and GA-222 Repairing Screw or Nail Pops standards publications.

| Jul 31, 2014

Cambridge, Mass., is latest locale to require energy usage disclosure

The City Council of Cambridge, Mass., approved the Building Energy Usage and Disclosure Ordinance (BEUDO) that requires benchmarking and disclosure of building energy performance for large commercial, institutional, and multifamily buildings.

| Jul 31, 2014

Stalled $1.5 billion Miami mixed-use redevelopment project advances

A long-delayed $1.5 billion mixed-use development in Miami moved ahead after city planners approved the project’s first phase.

| Jul 30, 2014

USGS updates National Seismic Hazard Maps

The U.S. Geological Service recently released an update of U.S. National Seismic Hazard Maps that reflect the latest analysis of where future earthquakes will occur, how frequently they may occur, and their strength.

| Jul 23, 2014

Fairfax County, Virginia toughens green standards

The Fairfax County Board of Supervisors recently strengthened its green building policy, requiring higher standards for residential, retail, office and other construction projects seeking approval for rezoning.

| Jul 23, 2014

Berkeley National Lab’s FLEXLAB is a test bed for energy efficient office design

FLEXLAB, short for the Facility for Low Energy Experiments, opened this summer at the Lawrence Berkeley National Laboratory.

| Jul 23, 2014

House passes 2015 GSA budget with 17% cut for new construction projects

The General Services Administration’s construction budget for fiscal year 2015 passed by the House this month includes cuts in both new construction and renovation/repairs compared to 2014.

| Jul 16, 2014

Coastal flooding increasing along East Coast, says report

An analysis of tidal levels and flood data by the news organization Reuters concludes that flooding has increased along the Eastern Seaboard over the past four decades.

| Jul 16, 2014

Local hiring requirement a tough challenge for new Detroit arena project

An agreement for a land transfer from the City of Detroit to Ilitch Holdings Inc., that enabled construction of a new arena for the Detroit Red Wings requires that 51% of the project’s construction workers must come from the city.

| Jul 16, 2014

Local hiring requirement a tough challenge for new Detroit arena project

An agreement for a land transfer from the City of Detroit to Ilitch Holdings Inc., that enabled construction of a new arena for the Detroit Red Wings requires that 51% of the project’s construction workers must come from the city.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021