flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Big-box retailers not just for DIYers

Big-box retailers not just for DIYers

Nearly half of all contractor purchases made from stores like Home Depot and Lowe's.


By By BD+C Staff | February 16, 2012

A national research study conducted by Eric Mower + Associates' Contractor Insight specialty reveals that contractors make nearly half of their tool and building supply purchases from big-box retailers.

"Retailers score high for variety and convenience, but that's not the whole story for brand marketers; they must 'see' the customer as a shopper, not only as a contractor. If they don't— and they don't know the shopper's journey or how to align their product in the retail environment— they will not reach full potential in the aisles," said John O'Hara partner and leader of EMA's Contractor Insight specialty.

When it comes to purchasing hand tools, power tools and tool accessories, big-box retailers like Home Depot and Lowe's have an advantage over traditional distributors as the preferred shopping destination. Study respondents cited convenience, range of products and brands, and accessibility as their reasons for choosing their place of purchase.

According to the research, 46% of contractors purchase hand tools, 47% purchase power tools and 49% purchase accessories from big-box retailers; 42%, 35% and 36% purchase hand tools, power tools and accessories from distributors, respectively.

Contractors perceived big-box retailers to have a better variety of products, lower pricing, and greater convenience as a one-stop shop, according to the study. Of the respondents, 63% would prefer to make small-volume purchases at big box retailers.

Those who prefer purchasing through distributors said it was for their customer service (75%), relationships (70%), knowledge (63%) and delivery (54%), all of which ranked significantly higher when compared to retailers. Distributors were also ranked high for having tools for pros, shipping directly to the contractor site and credit arrangements. According to the survey, 80% would make large-volume purchases at the distributorship, especially for plumbers (91%).

The EMA study was administered online to 500 general contractors, electricians, plumbers and HVAC specialists. More than 90 percent of respondents have at least six years' professional experience. BD+C

Related Stories

| Oct 13, 2010

Editorial

The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.

| Oct 13, 2010

Test run on the HP Z200 SFF Good Value in a Small Package

Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Oct 13, 2010

Thought Leader

Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.

| Oct 13, 2010

Hospital tower gets modern makeover

The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.

| Oct 13, 2010

Modern office design accentuates skyline views

Intercontinental|Exchange, a Chicago-based financial firm, hired design/engineering firm Epstein to create a modern, new 31st-floor headquarters.

| Oct 13, 2010

Hospital and clinic join for better patient care

Designed by HGA Architects and Engineers, the two-story Owatonna (Minn.) Hospital, owned by Allina Hospitals and Clinics, connects to a newly expanded clinic owned by Mayo Health System to create a single facility for inpatient and outpatient care.

| Oct 13, 2010

Biloxi’s convention center bigger, better after Katrina

The Mississippi Coast Coliseum and Convention Center in Biloxi is once again open for business following a renovation and expansion necessitated by Hurricane Katrina.

| Oct 13, 2010

Tower commemorates Lewis & Clark’s historic expedition

The $4.8 million Lewis and Clark Confluence Tower in Hartford, Ill., commemorates explorers Meriwether Lewis and William Clark at the point where their trek to the Pacific Ocean began—the confluence of the Mississippi and Missouri Rivers.

| Oct 13, 2010

Maryland replacement hospital expands care, changes name

The new $120 million Meritus Regional Medical Center in Hagerstown, Md., has 267 beds, 17 operating rooms with high-resolution video screens, a special care level II nursery, and an emergency room with 53 treatment rooms, two trauma rooms, and two cardiac rooms.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021