flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The Bill & Melinda Gates Center for Computer Science & Engineering opens on the University of Washington campus

University Buildings

The Bill & Melinda Gates Center for Computer Science & Engineering opens on the University of Washington campus

LMN Architects designed the facility.


By David Malone, Associate Editor | March 26, 2019
Bill and Melinda Computer Science building exterior

All Photos: Tim Griffith

Since 2003, the University of Washington’s Paul G. Allen School of Computer Science and Engineering has grown considerably. The program outgrew the existing 165,000 sf building and found itself needing more space.

Enter the Bill & Melinda Gates Center for Computer Science & Engineering. Designed by LMN Architects, the 140,000-sf facility expands the current capacity of the school and provides research spaces, classrooms and lecture spaces, faculty offices, and a new home for the School’s undergraduate majors. A central, naturally-lit atrium provides visual and physical connections to all the floors and acts as the school’s central hub. At the roof-level, an event center will support a wide range of educational needs, industry collaborations, and outreach functions. A cafe activates the primary entry and acts as a transition between the exterior landscape to the central atrium.

 

Interior of the Bill and Melinda Gates Center for Computer Science and Engineering

 

The building’s exterior features a two-sided curving form that responds to the site’s topography and the flow of campus circulation. The building’s facade system of terra cotta panels in four texture types acts as a juxtaposition against the modern black glass and metal.

 

See Also: University of Arizona Student Success District begins construction

 

The completed project is targeting LEED New Construction Silver.

Related Stories

University Buildings | Aug 22, 2018

Skanska completes James Madison University’s new dining hall

The three-story building will open for fall semester 2018.

University Buildings | Aug 14, 2018

Following in the Ryan Fieldhouse’s footsteps, Northwestern University’s Walter Athletics Center officially opens

Perkins+Will designed both the Ryan Fieldhouse and the new Walter Athletics Center.

University Buildings | Aug 6, 2018

Academic honors: The importance of residence halls

Three recent projects demonstrate the dynamic role residence halls are playing on America’s college and university campuses.

University Buildings | Jul 30, 2018

University trends 2018: Schools are desperately searching for ways to economize

Though the U.S. economy is strong with investment gains buoying endowments, colleges and universities face pressures to economize and stretch their capital budgets.

Multifamily Housing | Jul 13, 2018

Student housing vs. multifamily housing—what are the differences?

While student and multi-family housing share a common building form, it’s the student resident that drives the innovation of new spaces.

University Buildings | Jul 5, 2018

Brown University’s Engineering Research Center increases the university’s School of Engineering lab space by 30%

KieranTimberlake designed the facility and Shawmut Design and Construction was the general contractor.

University Buildings | Jun 25, 2018

Virginia Commonwealth has at least three major expansion projects under construction

New buildings for outpatient care, engineering, and rehabilitation of serious injuries and debilities are scheduled to be completed in 2020.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021