The nation's largest architecture, engineering, and construction companies are on the BIM bandwagon in a big way, according to Building Design+Construction's premier Top 50 BIM Adopters ranking, published as part of the 2009 Giants 300 survey.
Of the 320 AEC firms that participated in Giants survey, 83% report having at least one BIM seat license in house, half have more than 30 seats, and nearly a quarter (23%) have 100-plus seats. In total, the Giants hold 28,174 BIM seats, with the average firm having 106 seats.
As expected, design firms are the biggest adopters of BIM, representing 48 of the top 50. AECOM Technology Corp. and HDR Architecture hold the most BIM seats, each with 2,000, followed by Parsons Brinckerhoff (1,800), Gensler (1,320), and HOK (840). Turner (#8 with 530 seats) and Mortensen Construction (#38 with 163 seats) are the only pure contractors to make the Top 50 BIM Adopters list.
Project: Yankee StadiumArchitect: HOK Sport + Venue + EventStructural engineer: Thornton Tomasetti (EA 10)MEP engineer: M-E Engineers (E 15)General contractor: Turner (C 1, CM 17)Construction manager: Tishman Speyer PropertiesRendering: Courtesy Turner Construction Co. |
BIM adoption seems to be slowing among the Giants, which is expected given the rough economic environment. Slightly more than half (51%) of the respondents have added or plan on adding BIM seat licenses in 2009, down from 63% in 2008. And the number of seats being purchased is expected to drop by 56% this year, from a total of 6,465 in 2008 to 2,837 in 2009.
Stantec and Gensler are adding the most seats this year (250 and 199) and are two of only four firms adding more than 100 seats in 2009—compared to eight firms in 2008.
Expanded Top BIM Adopter rankings are available at www.BDCnetwork.com/Giants.
Company* | # of BIM seat licenses | # seats added in '08 | # seats adding in '09 | |
*Several firms, including Fluor Corp., report having an enterprise license for BIM-related software, and, therefore, cannot provide adoption numbers. Source: 2009 Giants 300 survey. Expanded BIM rankings at: www.BDCnetwork.com/Giants. | ||||
1 | AECOM Technology Corp. | 2,000 | — | — |
1 | HDR Architecture | 2,000 | 2,000 | — |
3 | Parsons Brinckerhoff | 1,800 | 40 | 50 |
4 | Gensler | 1,320 | 300 | 199 |
5 | HOK | 840 | — | — |
6 | Perkins+Will | 800 | 80 | — |
7 | HKS | 650 | 200 | — |
8 | Turner | 530 | 200 | 100 |
9 | SSOE | 500 | 150 | 50 |
10 | Skidmore, Owings & Merrill | 450 | 75 | 25 |
11 | Arup | 407 | — | — |
12 | RTKL Associates | 373 | 43 | — |
13 | Cannon Design | 320 | — | — |
14 | SmithGroup | 312 | 80 | — |
15 | Merrick & Co. | 302 | 15 | 25 |
16 | CH2M HILL | 300 | 40 | — |
17 | Jacobs | 280 | 280 | 15 |
18 | Middough | 270 | 10 | 20 |
18 | TLC Engineering for Architecture | 270 | 25 | — |
20 | Day & Zimmermann International | 265 | — | — |
21 | Stantec | 250 | 100 | 250 |
22 | Dewberry | 233 | 30 | 65 |
23 | Perkowitz+Ruth Architects | 225 | — | — |
23 | Smith Seckman Reid | 225 | 45 | 20 |
25 | KJWW Engineering Consultants | 209 | 35 | — |
26 | HNTB | 208 | — | — |
27 | Burt Hill | 205 | 25 | — |
28 | Gresham, Smith and Partners | 203 | 30 | — |
29 | Bergmann Associates, Architects Engineers Planners | 200 | 30 | 20 |
29 | Syska Hennessy Group | 200 | — | — |
31 | X-nth | 199 | 10 | — |
32 | PageSoutherlandPage | 181 | 36 | 50 |
33 | Albert Kahn Associates | 180 | 35 | 10 |
33 | Goodwyn Mills and Cawood | 180 | 20 | — |
35 | Affiliated Engineers | 175 | 13 | — |
36 | Heery International | 173 | 10 | 10 |
37 | Fanning/Howey Associates | 169 | 12 | 26 |
38 | Mortenson Construction | 163 | 25 | — |
39 | Morris Architects | 162 | 20 | — |
40 | KMD Architects | 155 | 20 | 10 |
41 | Clark Nexsen | 153 | 10 | — |
42 | KlingStubbins | 150 | 50 | 75 |
42 | RNL Design | 150 | — | — |
44 | GRAEF | 145 | 15 | 5 |
44 | Leo A Daly | 145 | 22 | 30 |
44 | NTD Architecture | 145 | — | — |
47 | Arquitectonica | 140 | — | — |
47 | Corgan Associates | 140 | 25 | — |
47 | CTA Architects Engineers | 140 | 115 | — |
47 | Little | 140 | — | — |
2009 | 2008 | Company | 2008 Billings ($) |
Rank | |||
Source: 2009 Giants 300 survey. For expanded Architecture Firm rankings, visit: www.BDCnetwork.com/Giants | |||
1 | 1 | Gensler | 744,300,000 |
2 | 2 | Perkins+Will | 400,000,000 |
3 | 3 | Callison | 185,000,000 |
4 | — | Kohn Pedersen Fox Associates | 146,000,000 |
5 | 4 | NBBJ | 135,735,000 |
6 | 5 | RMJM | 129,989,567 |
7 | 9 | WATG | 110,889,000 |
8 | 6 | Perkins Eastman | 107,000,000 |
9 | 7 | Zimmer Gunsul Frasca Architects | 81,070,000 |
10 | 15 | tvsdesign | 71,000,000 |
11 | 13 | HMC Architects | 65,446,823 |
12 | 8 | Arquitectonica | 62,400,000 |
13 | 10 | MulvannyG2 Architecture | 60,000,000 |
14 | 34 | VOA Associates | 51,000,000 |
15 | 12 | NTD Architecture | 49,200,000 |
16 | 24 | Corgan Associates | 48,929,118 |
17 | 17 | Anshen+Allen | 47,394,883 |
18 | 18 | OZ Architecture | 44,300,000 |
19 | 14 | Perkowitz+Ruth Architects | 44,000,000 |
20 | 21 | FXFOWLE Architects | 43,700,000 |
21 | 19 | Cooper Carry | 42,715,000 |
22 | 11 | Smallwood, Reynolds, Stewart, Stewart & Associates | 42,470,000 |
23 | 23 | Shepley Bulfinch Richardson and Abbott | 42,081,801 |
24 | 26 | Ware Malcomb | 41,896,419 |
25 | 35 | BBG-BBGM | 41,000,000 |
26 | 27 | RSP Architects | 40,091,508 |
27 | — | BLT Architects | 39,500,000 |
28 | 29 | FRCH Design Worldwide | 39,000,000 |
29 | — | SchenkelShultz | 34,880,000 |
30 | 29 | KKE Architects | 33,200,000 |
31 | 37 | WWCOT | 32,400,000 |
32 | 33 | FKP Architects | 31,939,000 |
33 | 48 | Fentress Architects | 31,679,680 |
34 | — | NAC Architecture | 31,551,000 |
35 | 35 | Jerde Partnership, The | 28,700,000 |
36 | — | SHW Group | 28,000,000 |
37 | 43 | Morris Architects | 27,109,737 |
38 | — | RBB Architects | 27,000,000 |
39 | 28 | WHR Architects | 26,400,000 |
40 | 38 | MBH Architects | 26,294,628 |
41 | — | Goodwyn Mills and Cawood | 26,240,000 |
42 | 20 | Nadel Architects | 26,000,000 |
43 | — | Polshek Partnership Architects | 25,397,128 |
44 | 32 | Niles Bolton Associates | 25,300,000 |
45 | 22 | Mithun | 24,000,000 |
46 | 44 | Cuningham Group Architecture | 23,892,676 |
47 | 41 | Harvard Jolly | 23,828,636 |
48 | 45 | Solomon Cordwell Buenz | 23,500,000 |
49 | 42 | Carrier Johnson + Culture | 22,000,000 |
50 | — | Gould Evans Associates | 21,402,000 |
51 | — | Cambridge Seven Associates | 21,400,000 |
52 | 50 | Kirksey | 20,821,686 |
Related Stories
Office Buildings | Mar 21, 2024
BOMA updates floor measurement standard for office buildings
The Building Owners and Managers Association (BOMA) International has released its latest floor measurement standard for office buildings, BOMA 2024 for Office Buildings – ANSI/BOMA Z65.1-2024.
Healthcare Facilities | Mar 18, 2024
A modular construction solution to the mental healthcare crisis
Maria Ionescu, Senior Medical Planner, Stantec, shares a tested solution for the overburdened emergency department: Modular hub-and-spoke design.
Codes and Standards | Mar 18, 2024
New urban stormwater policies treat rainwater as a resource
U.S. cities are revamping how they handle stormwater to reduce flooding and capture rainfall and recharge aquifers. New policies reflect a change in mindset from treating stormwater as a nuisance to be quickly diverted away to capturing it as a resource.
Plumbing | Mar 18, 2024
EPA to revise criteria for WaterSense faucets and faucet accessories
The U.S. Environmental Protection Agency (EPA) plans to revise its criteria for faucets and faucet accessories to earn the WaterSense label. The specification launched in 2007; since then, most faucets now sold in the U.S. meet or exceed the current WaterSense maximum flow rate of 1.5 gallons per minute (gpm).
MFPRO+ New Projects | Mar 18, 2024
Luxury apartments in New York restore and renovate a century-old residential building
COOKFOX Architects has completed a luxury apartment building at 378 West End Avenue in New York City. The project restored and renovated the original residence built in 1915, while extending a new structure east on West 78th Street.
Multifamily Housing | Mar 18, 2024
YWCA building in Boston’s Back Bay converted into 210 affordable rental apartments
Renovation of YWCA at 140 Clarendon Street will serve 111 previously unhoused families and individuals.
Healthcare Facilities | Mar 17, 2024
5 criteria to optimize medical office design
Healthcare designers need to consider privacy, separate areas for practitioners, natural light, outdoor spaces, and thoughtful selection of materials for medical office buildings.
Construction Costs | Mar 15, 2024
Retail center construction costs for 2024
Data from Gordian shows the most recent costs per square foot for restaurants, social clubs, one-story department stores, retail stores and movie theaters in select cities.
Architects | Mar 15, 2024
4 ways to streamline your architectural practice
Vessel Architecture's Lindsay Straatmann highlights four habits that have helped her discover the key to mastering efficiency as an architect.
Healthcare Facilities | Mar 15, 2024
First comprehensive cancer hospital in Dubai to host specialized multidisciplinary care
Stantec was selected to lead the design team for the Hamdan Bin Rashid Cancer Hospital, Dubai’s first integrated, comprehensive cancer hospital. Named in honor of the late Sheikh Hamdan Bin Rashid Al Maktoum, the hospital is scheduled to open to patients in 2026.