BIM has been paying off for AE firm NELSON. “Once a team becomes proficient in the BIM process, we see better margins for projects completed in Revit,” says John “Ozzie” Nelson, Jr., President/CEO. “We see more RFPs that require Revit.” Creating Revit models opens up doors in analysis, data integration, facilities management, and advanced visualization, he says.
Perkins Eastman is starting to see results from its investment in BIM. “Our most recent in-house analysis of project labor costs on comparable CAD/BIM projects is showing an increase in BIM projects over CAD projects,” says Chair/CEO Bradford Perkins, FAIA, MRAIC, AICP. “Many of the other benefits of a BIM workflow are not so easily quantified, but they are real enough to give us confidence that BIM is paying off.”
SCROLL DOWN FOR GIANTS 300 BIM FIRM RANKINGS
Alex Ivanikiw, AIA, LEED AP, Senior Vice President at Barton Malow: “The real benefit is how the use of BIM enables collaboration, which in turn builds a real sense of trust and teamwork.” When subcontractors had trouble using the BIM model for submittal approval and materials fabrication, Barton Malow created a BIM 101 seminar to educate them in these processes, says Ivanikiw.
BIM projects have been profitable for Syska Hennessy Group, but there’s always room for improvement, says Co-president Gary Brennen, PE, LEED AP. SHG was “committed and fully invested in the early adoption of BIM,” but the MEP software still lags behind the architectural and structural components. “We were aware of that going into the process,” he says.
Structural engineering firm Magnusson Klemencic Associates is producing 100% of its projects as BIM models. “After many years of investment, we are finally turning the corner on implementing BIM in an efficient and thoughtful manner,” says MKA President Ron Klemencic, PE, SE.
The key to successful BIM implementation: “A project team with the experience and knowledge of what to model and how to model it,” says Klemencic.
“Allowing owners to better visualize the project has become an influencing factor during the presentation process,” says Doug Davidson, President, New South Construction. In 2011, over 45% of New South’s projects used BIM.
“There’s no question that BIM has paid off in our role as engineer of record producing construction drawings and as detailing engineer,” says Robert Otani, PE, LEED AP, Vice President of Thornton Tomasetti. The firm’s Construction Support Services practice uses BIM to produce digital fabrication drawings, connection engineering, and erection engineering for steel contractors. “The technology is constantly changing, and the engineers need to stay ahead of the curve,” says Otani.
KJWW Engineering recently standardized on Revit BIM in all 11 offices. President Paul VanDuyne, PE, says it was much more difficult to develop the MEP and technology components of the firm’s BIM platform than it was for structural engineering and medical equipment planning. “Now we are completing projects in close to the same time frame as previously with 3D, and in some cases faster,” he says.
EwingCole now uses an internal “cloud” for team members, who are now able to work on BIM through higher-end processors and central servers, says President Mark Hebden, AIA, LEED AP.
EYP Architecture & Engineering adopted BIM in 2006, and it has become a core competency. One unexpected benefit: “BIM integration has created more opportunities for younger tech-savvy staff to collaborate with senior technical team members,” says John Pocorobba, AIA, NCARB, LEED AP, Chief Operations Officer.
“It becomes apparent which market sectors are embracing BIM,” said Greg Lyon, Vice President and Director of Business Development at Nadel Architects, whose BIM work focuses on hospitality and retail clients.
“BIM implementation has been a long-term effort and a considerable one,” says Phil Harrison, FAIA, LEED AP, CEO of Perkins+Will. The firm has overcome the technical and training issues and is now “focusing on innovations and efficiencies,” he says.
Shepley Bulfinch has been using BIM since 2009 and now uses it for all projects. President Carole Wedge, FAIA, LEED AP, says BIM implementation has led to a “deeper exploration about how we approach our work, including how we draw and how we schedule our projects.”
According to Graef CEO John Kissinger, “We were early adopters. It was more difficult than we thought, but it is ingrained in all areas of our practice now.”
SmithGroupJJR began transitioning to Revit in 2005, and is now demonstrating a return on its BIM investment. On a daily basis, the firm peaks at around 310 concurrent users on Revit Architecture, Revit MEP, and Revit Structure.
President Steven Straus says Glumac made “an enormous investment” in BIM training and software development. “BIM is a new technology that is improving coordination,” he says, “but the software is not ready for prime time.”
“Not all contractors we work with are leveraging BIM. This means we have to spend more time preparing drawings in BIM than we normally would,” says BRPH President/CEO Brad Harmsen, AIA.
The chief conclusion from this survey: BIM is here to stay, but be prepared to invest staff time and money to perfect it. +
TOP 25 BIM ARCHITECTURE FIRMS
Rank | Company | 2011 BIM Revenue ($) |
1 | HOK | 398,217,301 |
2 | HDR Architecture | 327,690,000 |
3 | Perkins+Will | 274,336,000 |
4 | Skidmore, Owings & Merrill | 204,000,000 |
5 | HKS | 200,000,000 |
6 | Cannon Design | 173,000,000 |
7 | SmithGroupJJR | 150,540,000 |
8 | RTKL Associates | 140,000,000 |
9 | Hammel, Green and Abrahamson | 76,740,000 |
10 | EYP Architecture & Engineering | 72,681,105 |
11 | Corgan Associates | 67,575,000 |
12 | Flad Architects | 65,100,000 |
13 | HNTB Architecture | 63,244,852 |
14 | Fentress Architects | 58,824,000 |
15 | DLR Group | 49,500,000 |
16 | BSA LifeStructures | 45,316,495 |
17 | PageSoutherlandPage | 44,918,630 |
18 | ZGF Architects | 40,352,152 |
19 | Ennead Architects | 39,341,000 |
20 | KMD Architects | 35,143,453 |
21 | Cooper Carry | 34,000,000 |
22 | Perkins Eastman | 32,500,000 |
23 | LS3P Associates | 32,211,134 |
24 | FKP Architects | 30,000,000 |
25 | Harley Ellis Devereaux | 28,740,000 |
TOP 25 BIM ENGINEERING FIRMS
Rank | Company | 2011 BIM Revenue ($) |
1 | Jacobs | 355,021,036 |
2 | URS Corp. | 275,000,000 |
3 | Stantec | 181,300,000 |
4 | SSOE Group | 103,506,950 |
5 | Science Applications International Corp. | 92,695,000 |
6 | Thornton Tomasetti | 83,314,632 |
7 | KPFF Consulting Engineers | 60,000,000 |
8 | Burns & McDonnell | 50,000,000 |
9 | KJWW Engineering Consultants | 43,784,892 |
10 | Bard, Rao + Athanas Consulting Engineers | 32,000,000 |
11 | H&A Architects & Engineers | 29,883,975 |
12 | TLC Engineering for Architecture | 27,290,274 |
13 | STV | 26,646,000 |
14 | Glumac | 26,408,740 |
15 | Magnusson Klemencic Associates | 25,845,578 |
16 | Middough | 25,000,000 |
17 | R.G. Vanderweil Engineers | 24,912,000 |
18 | Michael Baker Jr., Inc | 24,000,000 |
19 | Syska Hennessy Group | 23,500,000 |
20 | Smith Seckman Reid | 21,360,000 |
21 | Bergmann Associates | 18,420,000 |
22 | ccrd partners | 16,700,000 |
23 | Rutherford & Chekene | 16,568,000 |
24 | Paulus, Sokolowski and Sartor | 15,500,000 |
25 | L.R. Kimball | 14,200,000 |
TOP 25 BIM CONSTRUCTION FIRMS
Rank | Company | 2011 BIM Revenue ($) |
1 | Turner Corporation, The | 5,458,100,812 |
2 | URS Corp. | 4,150,000,000 |
3 | Hensel Phelps Construction | 2,230,890,000 |
4 | Mortenson | 2,220,000,000 |
5 | Balfour Beatty US | 2,070,776,637 |
6 | McCarthy Holdings | 1,897,000,000 |
7 | Holder Construction | 1,651,000,000 |
8 | Whiting-Turner Contracting Co., The | 1,282,424,019 |
9 | Lend Lease | 1,264,115,151 |
10 | Hoffman Corp. | 1,165,887,387 |
11 | Walsh Group, The | 1,128,436,530 |
12 | PCL Construction Enterprises | 1,100,346,901 |
13 | JE Dunn Construction | 1,097,865,953 |
14 | Clayco | 820,000,000 |
15 | DPR Construction | 691,319,178 |
16 | Swinerton | 653,859,000 |
17 | Gilbane Building Co. | 622,414,000 |
18 | Suffolk Construction | 621,498,214 |
19 | Structure Tone | 606,850,000 |
20 | Pepper Construction Group | 566,300,000 |
21 | Weitz Co., The | 560,000,000 |
22 | Manhattan Construction Group | 549,029,000 |
23 | Austin Industries | 547,065,203 |
24 | Power Construction | 530,000,000 |
25 | Brasfield & Gorrie | 504,676,926 |
Related Stories
Senior Living Design | Apr 24, 2024
Nation's largest Passive House senior living facility completed in Portland, Ore.
Construction of Parkview, a high-rise expansion of a Continuing Care Retirement Community (CCRC) in Portland, Ore., completed recently. The senior living facility is touted as the largest Passive House structure on the West Coast, and the largest Passive House senior living building in the country.
Hotel Facilities | Apr 24, 2024
The U.S. hotel construction market sees record highs in the first quarter of 2024
As seen in the Q1 2024 U.S. Hotel Construction Pipeline Trend Report from Lodging Econometrics (LE), at the end of the first quarter, there are 6,065 projects with 702,990 rooms in the pipeline. This new all-time high represents a 9% year-over-year (YOY) increase in projects and a 7% YOY increase in rooms compared to last year.
Architects | Apr 24, 2024
Shepley Bulfinch appoints new Board of Director: Evelyn Lee, FAIA
Shepley Bulfinch, a national architecture firm announced the appointment of new Board of Director member Evelyn Lee, FAIA as an outside director. With this new appointment, Lucia Quinn has stepped down from the firm’s Board, after serving many years as an outside board advisor and then as an outside director.
ProConnect Events | Apr 23, 2024
5 more ProConnect events scheduled for 2024, including all-new 'AEC Giants'
SGC Horizon present 7 ProConnect events in 2024.
75 Top Building Products | Apr 22, 2024
Enter today! BD+C's 75 Top Building Products for 2024
BD+C editors are now accepting submissions for the annual 75 Top Building Products awards. The winners will be featured in the November/December 2024 issue of Building Design+Construction.
Laboratories | Apr 22, 2024
Why lab designers should aim to ‘speak the language’ of scientists
Learning more about the scientific work being done in the lab gives designers of those spaces an edge, according to Adrian Walters, AIA, LEED AP BD+C, Principal and Director of SMMA's Science & Technology team.
Resiliency | Apr 22, 2024
Controversy erupts in Florida over how homes are being rebuilt after Hurricane Ian
The Federal Emergency Management Agency recently sent a letter to officials in Lee County, Florida alleging that hundreds of homes were rebuilt in violation of the agency’s rules following Hurricane Ian. The letter provoked a sharp backlash as homeowners struggle to rebuild following the devastating 2022 storm that destroyed a large swath of the county.
Mass Timber | Apr 22, 2024
British Columbia changing building code to allow mass timber structures of up to 18 stories
The Canadian Province of British Columbia is updating its building code to expand the use of mass timber in building construction. The code will allow for encapsulated mass-timber construction (EMTC) buildings as tall as 18 stories for residential and office buildings, an increase from the previous 12-story limit.
Standards | Apr 22, 2024
Design guide offers details on rain loads and ponding on roofs
The American Institute of Steel Construction and the Steel Joist Institute recently released a comprehensive roof design guide addressing rain loads and ponding. Design Guide 40, Rain Loads and Ponding provides guidance for designing roof systems to avoid or resist water accumulation and any resulting instability.
Building Materials | Apr 22, 2024
Tacoma, Wash., investigating policy to reuse and recycle building materials
Tacoma, Wash., recently initiated a study to find ways to increase building material reuse through deconstruction and salvage. The city council unanimously voted to direct the city manager to investigate deconstruction options and estimate costs.