BIM has been paying off for AE firm NELSON. “Once a team becomes proficient in the BIM process, we see better margins for projects completed in Revit,” says John “Ozzie” Nelson, Jr., President/CEO. “We see more RFPs that require Revit.” Creating Revit models opens up doors in analysis, data integration, facilities management, and advanced visualization, he says.
Perkins Eastman is starting to see results from its investment in BIM. “Our most recent in-house analysis of project labor costs on comparable CAD/BIM projects is showing an increase in BIM projects over CAD projects,” says Chair/CEO Bradford Perkins, FAIA, MRAIC, AICP. “Many of the other benefits of a BIM workflow are not so easily quantified, but they are real enough to give us confidence that BIM is paying off.”
SCROLL DOWN FOR GIANTS 300 BIM FIRM RANKINGS
Alex Ivanikiw, AIA, LEED AP, Senior Vice President at Barton Malow: “The real benefit is how the use of BIM enables collaboration, which in turn builds a real sense of trust and teamwork.” When subcontractors had trouble using the BIM model for submittal approval and materials fabrication, Barton Malow created a BIM 101 seminar to educate them in these processes, says Ivanikiw.
BIM projects have been profitable for Syska Hennessy Group, but there’s always room for improvement, says Co-president Gary Brennen, PE, LEED AP. SHG was “committed and fully invested in the early adoption of BIM,” but the MEP software still lags behind the architectural and structural components. “We were aware of that going into the process,” he says.
Structural engineering firm Magnusson Klemencic Associates is producing 100% of its projects as BIM models. “After many years of investment, we are finally turning the corner on implementing BIM in an efficient and thoughtful manner,” says MKA President Ron Klemencic, PE, SE.
The key to successful BIM implementation: “A project team with the experience and knowledge of what to model and how to model it,” says Klemencic.
“Allowing owners to better visualize the project has become an influencing factor during the presentation process,” says Doug Davidson, President, New South Construction. In 2011, over 45% of New South’s projects used BIM.
“There’s no question that BIM has paid off in our role as engineer of record producing construction drawings and as detailing engineer,” says Robert Otani, PE, LEED AP, Vice President of Thornton Tomasetti. The firm’s Construction Support Services practice uses BIM to produce digital fabrication drawings, connection engineering, and erection engineering for steel contractors. “The technology is constantly changing, and the engineers need to stay ahead of the curve,” says Otani.
KJWW Engineering recently standardized on Revit BIM in all 11 offices. President Paul VanDuyne, PE, says it was much more difficult to develop the MEP and technology components of the firm’s BIM platform than it was for structural engineering and medical equipment planning. “Now we are completing projects in close to the same time frame as previously with 3D, and in some cases faster,” he says.
EwingCole now uses an internal “cloud” for team members, who are now able to work on BIM through higher-end processors and central servers, says President Mark Hebden, AIA, LEED AP.
EYP Architecture & Engineering adopted BIM in 2006, and it has become a core competency. One unexpected benefit: “BIM integration has created more opportunities for younger tech-savvy staff to collaborate with senior technical team members,” says John Pocorobba, AIA, NCARB, LEED AP, Chief Operations Officer.
“It becomes apparent which market sectors are embracing BIM,” said Greg Lyon, Vice President and Director of Business Development at Nadel Architects, whose BIM work focuses on hospitality and retail clients.
“BIM implementation has been a long-term effort and a considerable one,” says Phil Harrison, FAIA, LEED AP, CEO of Perkins+Will. The firm has overcome the technical and training issues and is now “focusing on innovations and efficiencies,” he says.
Shepley Bulfinch has been using BIM since 2009 and now uses it for all projects. President Carole Wedge, FAIA, LEED AP, says BIM implementation has led to a “deeper exploration about how we approach our work, including how we draw and how we schedule our projects.”
According to Graef CEO John Kissinger, “We were early adopters. It was more difficult than we thought, but it is ingrained in all areas of our practice now.”
SmithGroupJJR began transitioning to Revit in 2005, and is now demonstrating a return on its BIM investment. On a daily basis, the firm peaks at around 310 concurrent users on Revit Architecture, Revit MEP, and Revit Structure.
President Steven Straus says Glumac made “an enormous investment” in BIM training and software development. “BIM is a new technology that is improving coordination,” he says, “but the software is not ready for prime time.”
“Not all contractors we work with are leveraging BIM. This means we have to spend more time preparing drawings in BIM than we normally would,” says BRPH President/CEO Brad Harmsen, AIA.
The chief conclusion from this survey: BIM is here to stay, but be prepared to invest staff time and money to perfect it. +
TOP 25 BIM ARCHITECTURE FIRMS
Rank | Company | 2011 BIM Revenue ($) |
1 | HOK | 398,217,301 |
2 | HDR Architecture | 327,690,000 |
3 | Perkins+Will | 274,336,000 |
4 | Skidmore, Owings & Merrill | 204,000,000 |
5 | HKS | 200,000,000 |
6 | Cannon Design | 173,000,000 |
7 | SmithGroupJJR | 150,540,000 |
8 | RTKL Associates | 140,000,000 |
9 | Hammel, Green and Abrahamson | 76,740,000 |
10 | EYP Architecture & Engineering | 72,681,105 |
11 | Corgan Associates | 67,575,000 |
12 | Flad Architects | 65,100,000 |
13 | HNTB Architecture | 63,244,852 |
14 | Fentress Architects | 58,824,000 |
15 | DLR Group | 49,500,000 |
16 | BSA LifeStructures | 45,316,495 |
17 | PageSoutherlandPage | 44,918,630 |
18 | ZGF Architects | 40,352,152 |
19 | Ennead Architects | 39,341,000 |
20 | KMD Architects | 35,143,453 |
21 | Cooper Carry | 34,000,000 |
22 | Perkins Eastman | 32,500,000 |
23 | LS3P Associates | 32,211,134 |
24 | FKP Architects | 30,000,000 |
25 | Harley Ellis Devereaux | 28,740,000 |
TOP 25 BIM ENGINEERING FIRMS
Rank | Company | 2011 BIM Revenue ($) |
1 | Jacobs | 355,021,036 |
2 | URS Corp. | 275,000,000 |
3 | Stantec | 181,300,000 |
4 | SSOE Group | 103,506,950 |
5 | Science Applications International Corp. | 92,695,000 |
6 | Thornton Tomasetti | 83,314,632 |
7 | KPFF Consulting Engineers | 60,000,000 |
8 | Burns & McDonnell | 50,000,000 |
9 | KJWW Engineering Consultants | 43,784,892 |
10 | Bard, Rao + Athanas Consulting Engineers | 32,000,000 |
11 | H&A Architects & Engineers | 29,883,975 |
12 | TLC Engineering for Architecture | 27,290,274 |
13 | STV | 26,646,000 |
14 | Glumac | 26,408,740 |
15 | Magnusson Klemencic Associates | 25,845,578 |
16 | Middough | 25,000,000 |
17 | R.G. Vanderweil Engineers | 24,912,000 |
18 | Michael Baker Jr., Inc | 24,000,000 |
19 | Syska Hennessy Group | 23,500,000 |
20 | Smith Seckman Reid | 21,360,000 |
21 | Bergmann Associates | 18,420,000 |
22 | ccrd partners | 16,700,000 |
23 | Rutherford & Chekene | 16,568,000 |
24 | Paulus, Sokolowski and Sartor | 15,500,000 |
25 | L.R. Kimball | 14,200,000 |
TOP 25 BIM CONSTRUCTION FIRMS
Rank | Company | 2011 BIM Revenue ($) |
1 | Turner Corporation, The | 5,458,100,812 |
2 | URS Corp. | 4,150,000,000 |
3 | Hensel Phelps Construction | 2,230,890,000 |
4 | Mortenson | 2,220,000,000 |
5 | Balfour Beatty US | 2,070,776,637 |
6 | McCarthy Holdings | 1,897,000,000 |
7 | Holder Construction | 1,651,000,000 |
8 | Whiting-Turner Contracting Co., The | 1,282,424,019 |
9 | Lend Lease | 1,264,115,151 |
10 | Hoffman Corp. | 1,165,887,387 |
11 | Walsh Group, The | 1,128,436,530 |
12 | PCL Construction Enterprises | 1,100,346,901 |
13 | JE Dunn Construction | 1,097,865,953 |
14 | Clayco | 820,000,000 |
15 | DPR Construction | 691,319,178 |
16 | Swinerton | 653,859,000 |
17 | Gilbane Building Co. | 622,414,000 |
18 | Suffolk Construction | 621,498,214 |
19 | Structure Tone | 606,850,000 |
20 | Pepper Construction Group | 566,300,000 |
21 | Weitz Co., The | 560,000,000 |
22 | Manhattan Construction Group | 549,029,000 |
23 | Austin Industries | 547,065,203 |
24 | Power Construction | 530,000,000 |
25 | Brasfield & Gorrie | 504,676,926 |
Related Stories
| Aug 11, 2010
Wisconsin becomes the first state to require BIM on public projects
As of July 1, the Wisconsin Division of State Facilities will require all state projects with a total budget of $5 million or more and all new construction with a budget of $2.5 million or more to have their designs begin with a Building Information Model. The new guidelines and standards require A/E services in a design-bid-build project delivery format to use BIM and 3D software from initial ...
| Aug 11, 2010
Opening night close for Kent State performing arts center
The curtain opens on the Tuscarawas Performing Arts Center at Kent State University in early 2010, giving the New Philadelphia, Ohio, school a 1,100-seat multipurpose theater. The team of Legat & Kingscott of Columbus, Ohio, and Schorr Architects of Dublin, Ohio, designed the 50,000-sf facility with a curving metal and glass façade to create a sense of movement and activity.
| Aug 11, 2010
Residence hall designed specifically for freshman
Hardin Construction Company's Austin, Texas, office is serving as GC for the $50 million freshman housing complex at the University of Houston. Designed by HADP Architecture, Austin, the seven-story, 300,000-sf facility will be located on the university's central campus and have 1,172 beds, residential advisor offices, a social lounge, a computer lab, multipurpose rooms, a fitness center, and a...
| Aug 11, 2010
News Briefs: GBCI begins testing for new LEED professional credentials... Architects rank durability over 'green' in product attributes... ABI falls slightly in April, but shows market improvement
News Briefs: GBCI begins testing for new LEED professional credentials... Architects rank durability over 'green' in product attributes... ABI falls slightly in April, but shows market improvement
| Aug 11, 2010
Luxury Hotel required faceted design
Goettsch Partners, Chicago, designed a new five-star, 214-room hotel for the King Abdullah Financial District (KAFD) in Riyadh, Saudi Arabia. The design-build project, with Saudi Oger Ltd. as contractor and Rayadah Investment Co. as developer, has a three-story podium supporting a 17-story glass tower with a nine-story opening that allows light to penetrate the mass of the building.
| Aug 11, 2010
Three Schools checking into L.A.'s Ambassador Hotel site
Pasadena-based Gonzalez Goodale Architects is designing three new schools for Los Angeles Unified School District's Central Wilshire District. The $400 million campus, located on the site of the former Ambassador Hotel, will house a K-5 elementary school, a middle school, a high school, a shared recreation facility (including soccer field, 25-meter swimming pool, two gymnasiums), and a new publ...
| Aug 11, 2010
New Jersey's high-tech landscaping facility
Designed to enhance the use of science and technology in Bergen County Special Services' landscaping programs, the new single-story facility at the technical school's Paramus campus will have 7,950 sf of classroom space, a 1,000-sf greenhouse (able to replicate different environments, such as rainforest, desert, forest, and tundra), and 5,000 sf of outside landscaping and gardening space.
| Aug 11, 2010
U.S. firm designing massive Taiwan project
MulvannyG2 Architecture is designing one of Taipei, Taiwan's largest urban redevelopment projects. The Bellevue, Wash., firm is working with developer The Global Team Group to create Aquapearl, a mixed-use complex that's part of the Taipei government's "Good Looking Taipei 2010" initiative to spur redevelopment of the city's Songjian District.