Regular maintenance of a new or existing structure is critical not only to the health of the building, but also to the bottom line of the building’s owner. All too often, deferred maintenance results in excessive costs to restore structural integrity and serviceability. In some cases, long-term deferred maintenance can result in catastrophic failure. Neither scenario is acceptable to the building owner.
This article will identify the primary causes of engineering failures, define proactive versus reactive maintenance, recognize the reasons for deferred maintenance, and identify the financial and safety risks related to deferred maintenance.
The primary causes of engineering failures are typically related to design flaws, material failures, construction deficiencies, deferred maintenance, or a combination of one or more of the previously mentioned reasons.
In regard to proactive maintenance versus reactive maintenance, the former includes regularly scheduled maintenance, which can lead to the early detection of issues and problems. As for the latter, maintenance is only provided when serviceability is compromised. This is detectable when the distress is usually severe, which can lead to astronomical repair costs. The longer maintenance is deferred, the more the structure deteriorates. In addition to high repair costs, the structure is at risk of a structural failure that can lead to the demolition of the structure.
Structural engineers are typically asked: “What are the reasons for deferring required maintenance for a structure?” The reasons include an inadequate maintenance budget, unqualified building staff to manage the maintenance process, the disruption of services due to maintenance may not be tolerated by the owners and/or tenants, an inadequate understanding of the long-term consequences related to the deferred maintenance of a structure, and a simple lack of planning by the structure’s owners.
A simple way to define the trickle-down effect of deferred maintenance is to examine David Tod Geaslin’s Inverse Square Rule for Deferred Maintenance, which says:
If a part is known to be failing and the repair is deferred and the part is allowed to remain in service until the next level of failure, the resultant expense will be the square of the cost to repair the failed part.
According to the Inverse Square Rule for Deferred Maintenance, let’s examine the following hypothetical scenario. In a typical structure, a bolt that is missing in a beam connection may cost $100 to replace. If the bolt is not replaced and the beam that is supporting the floor remains in use, it causes overstress in the remaining bolts in the connection. Over time, the connection yields, and an engineering firm is dispatched to examine the structure, a contractor is hired to provide an emergency shoring system, and the floor is deemed unsafe until repairs are completed. In this scenario, the bolt that should have been repaired for $100 ends up costing the building owner $10,000.
This is the best cast scenario, now let’s look at the worst-case scenario.
The owner decides not to perform the $10,000 repair and the additional deferred maintenance results in a partial collapse of the floor. Additionally, personal injury or death occurs resulting in the loss of use of the space and legal expenses. The required repair cost was $10,000 and using Geaslin’s formula, the ultimate expenses incurred by the owner due to the second level failure totals $100,000,000 – this figure includes rebuilding of the collapsed floor, legal expenses due to personal injury or death, and the loss of use of the space. The resulting cost is the square of $10,000, which totals $100,000,000.
Taking a look at a real-life case study, let’s look at a post-tensioned concrete parking garage that suffered from deferred maintenance. Constructed in 1978, the cast-in-place concrete structure included unbonded post-tensioned pan joist framing. There was also a one-foot gap between the east side of the garage and the adjacent building.
In 2001, an engineering team was hired to conduct a full-scale review of the garage in regard to maintenance issues. The review found a distressed concrete column that had deteriorated due to long-term exposure to water. It was recommended that the water infiltration be addressed before repairing the column to provide for a more durable repair and mitigate the on-going concrete deterioration. The total estimated cost of the repair was $70,000. Unfortunately, the building owners opted to defer the repairs at the time.
In 2008 another review of the garage was conducted. By this time, the concrete column distress had accelerated significantly and had extended to all four levels of the garage while roof level joist framing adjacent to the column and the girders supporting the joists had also become distressed. Cracking and spalling in the overhead concrete pan joist framing on the roof level as well as distressed concrete and post-tensioned tendon corrosion at the roof joists were also observed. The total estimated cost of the repair was $700,000.
Ultimately, the source of the water infiltration was traced back to overspray from a roof level cooling tower and leaks from a Level 4 mechanical room.
There are various strategies to increase the durability of existing structures. These include periodic engineering assessments of structures to identify maintenance repair needs, preparation of repair documents and implementation of specified repairs by a qualified restoration contractor. The best strategy would also include a life cycle cost analysis using proprietary software in order to determine the service life and life cycle costs of maintaining the protective waterproofing components of the structure. The life cycle cost analysis should also evaluate alternatives for protective waterproofing systems which could potentially enhance the durability of the structure. The software analysis can be used for a wide variety of new and existing structures including stadiums, parking garages, bridges, commercial buildings, and roads and runways.
The life cycle cost analysis provides knowledge of the concrete, environment, and structure. Furthermore, it provides the building owner piece of mind in regard to the maintenance and repair schedules and costs as it is related to new or existing construction.
--
Javier Balma, Ph.D, P.E., S.E., is a principal and senior project manager in Walter P Moore’s Diagnostics Group. He can be reached at jbalma@walterpmoore.com.
Webb Wright, P.E., is a senior associate and senior project manager in Walter P Moore’s Diagnostics Group. He can be reached at wwright@walterpmoore.com.
More from Author
Walter P Moore | Oct 7, 2024
A journey through masonry reclad litigation
This blog post by Walter P Moore's Mallory Buckley, RRO, PE, BECxP + CxA+BE, and Bob Hancock, MBA, JD, of Munsch Hardt Kopf & Harr PC, explains the importance of documentation, correspondence between parties, and supporting the claims for a Plaintiff-party, while facilitating continuous use of the facility, on construction litigation projects.
Walter P Moore | May 28, 2024
Healthcare design: How to improve the parking experience for patients and families
Parking is likely a patient’s—and their families—first and last touch with a healthcare facility. As such, the arrival and departure parking experience can have a profound impact on their experience with the healthcare facility, writes Beth Bryan, PE, PTOE, PTP, STP2, Principal, Project Manager, Walter P Moore.
Walter P Moore | Mar 11, 2024
BIM at LOD400: Why Level of Development 400 matters for design and virtual construction
As construction projects grow more complex, producing a building information model at Level of Development 400 (LOD400) can accelerate schedules, increase savings, and reduce risk, writes Stephen E. Blumenbaum, PE, SE, Walter P Moore's Director of Construction Engineering.
Walter P Moore | Jan 18, 2024
Walter P Moore promotes former 40 Under 40 winner Kelly Roberts
In addition to her role as a Principal, Roberts is a distinguished leader in structural design with an extensive portfolio encompassing diverse projects such as educational and healthcare facilities to commercial and healthcare structures.
Walter P Moore | Sep 8, 2023
Secrets of a structural engineer
Walter P Moore's Scott Martin, PE, LEED AP, DBIA, offers tips and takeaways for young—and veteran—structural engineers in the AEC industry.
Walter P Moore | Jul 12, 2023
Building movement: When is it a problem?
As buildings age, their structural conditions can deteriorate, causing damage and safety concerns. In order to mitigate this, it’s important to engage in the regular inspection and condition assessment of buildings for diagnosis.
Walter P Moore | Jun 5, 2023
How to properly assess structural wind damage
Properly assessing wind damage can identify vulnerabilities in a building's design or construction, which could lead to future damage or loss, writes Matt Wagner, SE, Principal and Managing Director with Walter P Moore.
Walter P Moore | Jun 5, 2023
27 important questions about façade leakage
Walter P Moore’s Darek Brandt discusses the key questions building owners and property managers should be asking to determine the health of their building's façade.