Two loads you must understand before requesting an estimate

Sponsored Content Metals

Two loads you must understand before requesting an estimate


Jenny Arrowood | July 30, 2015
Two loads you must understand before requesting an estimate

Mezzanine in a Bilbao metro station, Spain. Photo: Javierme/Wikimedia Commons.

The SBS Mezzanine inputs act as a tool to pass along complete and necessary information to your estimator. Having this information ensures that you receive your pricing back in a timely manner! We all want that.

Jenny Arrowood, Sales Engineer at Star Buildings, discusses the two loads to understand for mezzanine loads.

The most influential factors in your mezzanine pricing are member spans, mezzanine loads, and required clearances. The more restrictive the clearances are, the greater the impact on your mezzanine framing. Knowing the maximum available or required clearances above and below your mezzanine will get you the most accurate design and cost effective pricing.

Another factor in mezzanine pricing is the loading required. The higher the loads are, the greater the impact to the cost of the mezzanine. There are two primary types of loads: dead and live.

Dead loads

Dead loads are the self-weight of the mezzanine structure, i.e. the weight of the mezzanine joists, beams, decking material and floor systems, etc.

Dead loads can largely vary depending on the deck material. For example, the typical dead load for a plywood deck is about 1 psf for every ¼” of thickness. Meaning for a 1” plywood deck, the dead load would be about 4 psf. In contrast, a normal weight concrete deck is about 12 psf for every 1” of thickness. For a 4” concrete deck, you will have a 48 psf dead load.

Live loads

Live loads are a result of the expected mezzanine use and consider the weight of people, furniture, mechanical units, or anything else that will be supported by the mezzanine.

The building code has a minimum load that is required for every mezzanine use. For example, the code minimum for a light-storage mezzanine is 125 psf. For an office with no hallways, the minimum is 50 psf. That’s a 75 psf difference!

Another type of live load required on mezzanines is called a partition load. The partition load accounts for any walls, or partitions, that will be supported by the mezzanine. A minimum of 15 psf partition load is required per the building code unless the mezzanine live load is 80 psf or greater and partitions will not be installed.

For more, continue reading on the Star Buildings blog.

Tags

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Â