flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

BLT Architects Selected to Complete New Project for Drexel University

BLT Architects Selected to Complete New Project for Drexel University

The Dornsife Center for Neighborhood Partnerships is expected to open in 2014


By Posted by Raissa Rocha, Associate Editor | January 18, 2013

BLT Architects (BLTa), a Philadelphia-based architectural and interior design firm, announced it has been commissioned to begin work on Drexel University's Dornsife Center. The Dornsife Center was made possible by a generous $10 million gift by Dana and David Dornsife and will be located on a 1.3-acre site at 35th and Spring Garden streets.

The Dornsife Center will be a resource hub to share expertise and knowledge with the West Philadelphia community. The center will offer a welcoming environment for local children, senior citizens, and families to interact with technology. The current site of the Dornsife Center is home to three existing buildings — an elementary school and two administrative buildings that have sat dormant for a number of years. These buildings will be renovated by BLTa to provide a range of flexible spaces that will accommodate small group meetings and workshops, as well as larger gatherings and hands-on exhibits.

“We are excited to begin renovations on Drexel's newest outreach efforts in West Philadelphia," said Michael L. Prifti, FAIA, Managing Principal at BLTa. "This project is especially fulfilling as not only will we be restoring life to a site that has sat vacant for years, but the newly outfitted buildings will serve a higher purpose of providing a harbor of learning for the local community. BLTa has a deep history of renovating existing structures and new construction in higher education settings, and we are looking forward to bringing our expertise to the Dornsife project." +

Related Stories

University Buildings | Apr 9, 2020

Designing for the next generation of student life: Academically aligned

Since many academic departments have been concentrated in their own buildings or portions of campus, bringing these disciplines into a shared facility is fairly new territory.

Coronavirus | Mar 30, 2020

Learning from covid-19: Campuses are poised to help students be happier

Overcoming isolation isn’t just about the technological face to face, it is about finding meaningful connection and “togetherness”.

University Buildings | Mar 26, 2020

How to convert college dorms to support the coronavirus crisis

While student dormitories are well-suited to certain alternate healthcare uses — from housing clinical staff to treating low-acuity patients — there are important elements to consider when exploring how to convert them for coronavirus treatment.

Plumbing | Mar 13, 2020

Pioneer Industries launches new website

Pioneer Industries launches new website

University Buildings | Mar 9, 2020

Designing campus buildings through an equity lens

As colleges become more diverse, campus conversation is focusing on how to create equitable environments that welcome all voices.

University Buildings | Mar 9, 2020

Auburn University, Robins & Morton open Construction Field Laboratory

Robins & Morton and Auburn University’s College of Architecture, Design and Construction (CADC) recently celebrated the dedication of the Robins & Morton Construction Field Laboratory.

University Buildings | Feb 18, 2020

UC Berkeley’s Enclave Apartments features a unique Moorish Castle design

Kirk E Peterson & Associates designed the project.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021