flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Boston Celtics training and practice facility will be part of Boston Landing mixed-use development

Sports and Recreational Facilities

Boston Celtics training and practice facility will be part of Boston Landing mixed-use development

The facility will also include two floors of Class A laboratory and office space and retail space.


By David Malone, Associate Editor | April 21, 2017

Boston Landing is a massive transit-oriented urban development located just minutes from downtown Boston. The development includes 650,000 sf of office and laboratory space, a 175-room hotel, a track and field sports center, a 295-unit residential building, 80,000 sf of retail space, and 1.4 acres of landscaped open space.

Also included in the development will be the Auerbach Center at New Balance World Headquarters, the Boston Celtics new 71,000-sf training and practice facility. The facility, located at 40 Guest St., will be one component of a 160,000 sf building. The training and practice facility will occupy 71,000 sf of space. 83,500 sf across two floors will be used for Class A laboratory and office space and an additional 5,700 sf will be set aside for retail space.

The Auerbach Center isn’t the only professional sports practice facility found at Boston Landing. The development is also home to the Boston Bruins practice facility.

The Auerbach Center broke ground in 2016 with completion expected in mid-2018. Elkus Manfredi Architects is the architect for the project.

Related Stories

| Feb 22, 2013

Westlake Reed Leskosky will renovate training center for Cleveland Browns

Local firm Westlake Reed Leskosky has been chosen to design renovations to the Cleveland Browns' Training and Administrative Complex in Berea, Ohio.

| Feb 14, 2013

Brasfield & Gorrie breaks ground on New College Football Hall of Fame in Atlanta

General contractor Brasfield & Gorrie is scheduled to kick off construction on the new College Football Hall of Fame in downtown Atlanta. With an anticipated completion date of fall 2014, the $66.5 million project will continue the revitalization of the city’s tourist district.

| Feb 6, 2013

George W. Bush Presidential Center among award-winning roofing projects honored by Sika Sarnafil

Winners of the 2012 Contractor Project of the Year Competition were announced this week by Sika Sarnafil. The annual competition highlights excellence in roofing installation. Roofing contractors are judged based on project complexity, design uniqueness, craftsmanship, and creative problem solving.

| Dec 5, 2012

McIntyre appointed Business Development Director for Shawmut’s Sports Venue Group

McIntyre will be tasked with expanding existing client relationships and creating new partnerships.

| Dec 4, 2012

Wagner joins Ghafari as Manager of Structural Engineering

Wagner comes to Ghafari from Walter P Moore, where he served as a principal, chaired the construction administration task force and led the design of numerous projects ranging in size from $10 million to $70 million.

| Sep 24, 2012

$3.8-million athletic field and track opens in Glen Head, N.Y.

The complex also includes a new, one-story, multi-purpose building that serves as the main entry port to the athletic facilities.

| Sep 7, 2012

Duffy joins Thornton Tomasetti

At Hardesty & Hanover, Duffy partnered with Thornton Tomasetti on a number of projects.

| Aug 24, 2012

Meis heads to Woods Bagot Sport

Staples Center, Paul Brown Stadium architect to leverage global studio to serve clients worldwide.

| Aug 8, 2012

Giants 300 Sports Facilities Report

BD+C's Giants 300 Top 25 AEC Firms in the Sports Facilities sector.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021