flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Boston ends its opposition to a casino, Wynn to build $1.7B resort

Casinos

Boston ends its opposition to a casino, Wynn to build $1.7B resort

A judge’s ruling last year paved the way for Wynn Resorts to begin construction on a 33-acre gambling palace in Everett, Mass. 


By John Caulfield, Senior Editor | January 30, 2016

A giant proposed casino-hotel in Everett, Mass., will include 600-plus rooms, six restaurants, and a 20-foot-wide harborwalk along the Mystic River. The resort is scheduled to open in 2018. Rendering: Wynn Resorts

When it comes to casinos, it would seem that resistance is futile, as municipalities large and small continue to crave the tax revenue and tourism these gambling emporiums generate, even though neither is the sure bet it once was.

Gambling revenue in Nevada was up only 1% last year to $11.1 billion, according to the state’s Gaming Control Board, which reported that gambling revenue from casinos on the Las Vegas Strip, $6.3 billion of the state’s total, was about flat with 2014 totals. In fact, Nevada’s gambling revenue has essentially been flat since 2009.

Next November, New Jersey voters will decide whether to expand casino gambling to the northern part of the state. That vote could have significant ramifications for Atlantic City, where four of 12 casinos closed in 2014, and where the state in January said it was taking over the finances and decision making to prevent that city from being forced to file for bankruptcy protection from creditors.

Against this backdrop, Boston ended its longstanding and costly opposition to casino gambling when, in the last week of January, it struck an agreement that removed the last obatacle for Wynn Resorts to build a $1.7 billion, 3-million-sf casino and hotel complex in Everett, Mass., a suburb of the city. Boston’s opposition was thwarted last December when a judge rejected the City’s lawsuit against the project.

Last September, the City of Everett Planning Board approved the site plan for the resort, a month after Wynn Everett received approval of its Environmental Impact report from the state, the culmination of a 27-month process. To prepare the property for the resort, Wynn had spent $30 million to remediate a contaminated 33-acre former chemical plant site that had been inaccessible to the public for more than a century. Charter Contracting conducted the initial phase of the land cleanup, and GZA was the licensed site professional on that project.

The Boston Globe reports that in exchange for Boston dropping any future legal efforts to block the casino, Wynn has agreed to pay an extra $6 million over the 15-year term of its agreement with the city. The city and Wynn Resorts have also agreed to cooperate on solving the inevitable challenges Boston will face opening a facility this large in a congested urban area.

Boston Mayor Martin Walsh—who had opposed the casino to protect neighboring Charlestown from the resort’s 24-7 impact—told the Globe that he anticipates some flak from anti-casino groups, especially those in Charlestown and Chelsea. But he also pointed out the benefits of this project will include thousands of new permanent jobs and millions of new tax dollars, which could be used for youth group activities and arts programs, along with helping to pay for a solution to chronic traffic problems at Sullivan Square, one of Massachusetts’ worse bottlenecks.

Two years ago, Wynn Resorts, in an attempt to move its plans forward, had assented to a $25 million payment to the City of Boston to help find a fix to traffic snarls at Sullivan Square, along with a $1.6 million annual payment to offset the long-term impact of the casino. Under the new 12-page agreement with Boston signed on January 27, Wynn has agreed to ante up another $400,000 per year for the next decade and a half. It will also make a one-time $750,000 payment to defray the City’s legal costs—estimated as high as $1.9 million—related to its efforts to block the casino.

On its website for the Everett resort, Wynn says it will have more than 600 hotel rooms that average 700 sf, which would make them the largest standard hotel rooms in Boston. The resort will include six restaurants, a sports bar, meeting and wedding spaces, as well as a four-season harborwalk park along Everett’s Mystic River, with viewing decks, pedestrian and bike paths, a water ferry, and waterfront dining and retail.

Suffolk Construction has been named the 33-acre resort’s general contractor for what is being dubbed as the largest single-phase construction project in Massachusetts’ history. Jacobs is the executive architect, and Wynn Design & Development created the building's design. The construction is expected to generate 4,000 union trade union jobs, and 4,000 permanent operation jobs. 

The Everett resort is scheduled to open in 2018.  

In 2011, then Massachusetts Gov. Deval Patrick signed Chapter 194, “An Act Establishing Expanded Gaming in the Commonwealth,” to promote job creation and tax revenue. Under that legislation, the licensing fee for each casino built in the state will be a minimum of $85 million, and the required capital investment at least $500 million. The state will receive 25% of the gross gaming revenue.

 

Related Stories

| Sep 22, 2014

4 keys to effective post-occupancy evaluations

Perkins+Will's Janice Barnes covers the four steps that designers should take to create POEs that provide design direction and measure design effectiveness.

| Sep 22, 2014

Sound selections: 12 great choices for ceilings and acoustical walls

From metal mesh panels to concealed-suspension ceilings, here's our roundup of the latest acoustical ceiling and wall products. 

| Sep 9, 2014

Using Facebook to transform workplace design

As part of our ongoing studies of how building design influences human behavior in today’s social media-driven world, HOK’s workplace strategists had an idea: Leverage the power of social media to collect data about how people feel about their workplaces and the type of spaces they need to succeed.

| Sep 3, 2014

New designation launched to streamline LEED review process

The LEED Proven Provider designation is designed to minimize the need for additional work during the project review process.

| Sep 2, 2014

Ranked: Top green building sector AEC firms [2014 Giants 300 Report]

AECOM, Gensler, and Turner top BD+C's rankings of the nation's largest green design and construction firms. 

| Jul 28, 2014

Reconstruction market benefits from improving economy, new technology [2014 Giants 300 Report]

Following years of fairly lackluster demand for commercial property remodeling, reconstruction revenue is improving, according to the 2014 Giants 300 report.

| Jul 28, 2014

Reconstruction Sector Construction Firms [2014 Giants 300 Report]

Structure Tone, Turner, and Gilbane top Building Design+Construction's 2014 ranking of the largest reconstruction contractor and construction management firms in the U.S.

| Jul 28, 2014

Reconstruction Sector Engineering Firms [2014 Giants 300 Report]

Jacobs, URS, and Wiss, Janney, Elstner top Building Design+Construction's 2014 ranking of the largest reconstruction engineering and engineering/architecture firms in the U.S.

| Jul 28, 2014

Reconstruction Sector Architecture Firms [2014 Giants 300 Report]

Stantec, HDR, and HOK top Building Design+Construction's 2014 ranking of the largest reconstruction architecture and architecture/engineering firms in the U.S.

| Jul 23, 2014

Architecture Billings Index up nearly a point in June

AIA reported the June ABI score was 53.5, up from a mark of 52.6 in May.

boombox1
boombox2
native1

More In Category




Giants 400

Top 25 Casino Construction Firms for 2023

The Yates Companies, Swinerton, Suffolk Construction, and Level 10 Construction top BD+C's ranking of the nation's largest casino general contractors and construction management (CM) firms for 2023, as reported in the 2023 Giants 400 Report.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021