flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Bricklaying robot speeds up construction time of University of Nevada Arts Building

Building Automation

Bricklaying robot speeds up construction time of University of Nevada Arts Building

A-1 Masonry and Sandblasting and Q&D Construction brought the robot to the project.


By David Malone, Associate Editor | August 28, 2018
SAM used to build the new University of Nevada Arts Building

SAM100, a Semi-Automated Mason, uses a robotic arm to spread mortar on a brick and places it on the new University Arts Building at the University of Nevada, Reno.

The University of Nevada’s new Arts Building will require about 100,000 bricks to be installed in the three-story building. But for the first time in Nevada, about 60% of those bricks will be laid by SAM, a bricklaying robot.

SAM, which stands for Semi-Automated Mason, is being used on the $35.5 million project to cut construction time and costs and help with Nevada’s construction labor shortage. The device uses a robotic arm, computer programming, and a materials-feeder system to lay bricks at a rate of about one brick every eight seconds.

The robotic, metal arm spreads mortar on brick and uses a laser-guided system to lay rows. According to Q&D Construction, the project’s general contractor, SAM can accomplish the work of five masons.

 

See Also: Rovers set to invade construction jobsites

 

The robot is designed to work on large, uninterrupted walls, which means the first five feet of an area, corners, and around windows must be done by hand by a mason. Additionally, humans are still needed to set up the Hydro-Mobile scaffolding, program the design, load bricks and mortar, align the row, clean the mortar joints, and do the finishing touches to set the brick. Even with all of the human help still needed, SAM sped up the brick veneer installation process by 50%.

When completed, the Arts Building will feature a 287-seat recital hall, a new art museum, a fabrication lab, an electroacoustic lab, soundproof rehearsal spaces, music practice rooms, faculty office spaces, and a recording studio. Construction is slated to complete in the fall with the grand opening held during Spring 2019 semester.

Related Stories

M/E/P Systems | May 23, 2019

Process analysis is how one MEP producer is coping with the industry’s labor woes

Southland Industries takes a measured approach to leaning into technology.

AEC Tech | Jan 9, 2019

Our robotic future: Assessing AI's impact on the AEC profession and the built environment

This is the first in a series by Lance Hosey, FAIA, on how automation is disrupting design and construction.

Building Technology | Dec 20, 2018

Autodesk is spending $1.15 billion to acquire two construction tech providers

PlanGrid and BuildingConnected are the latest pieces in the company’s quest to digitize the construction industry.

Building Technology | Dec 18, 2018

Data and analytics are becoming essential for EC firms competing to rebuild America’s infrastructure

A new paper from Deloitte Consulting advises companies to revise their strategies with an eye toward leveraging advanced technologies.

Modular Building | Aug 6, 2018

More contractors are turning to offsite production for speed and quality

Skender launches an advanced manufacturing division. Katerra ups its bet on modular. Prefabrication comes to the rescue on multiple projects.

Building Automation | Jul 13, 2018

Katerra has plans for a new advanced manufacturing factory in California

The building components facility will be located near rail, shipping ports, and freeways.

Building Technology | Jun 13, 2018

Rovers set to invade construction jobsites

This autonomous construction management tool tracks jobsite progress in real time.

AEC Tech | May 23, 2017

A funny thing may happen on the way to AI

As AI proves safe, big business will want to reduce overhead.

Retail Centers | Apr 27, 2017

Changing an automotive retail paradigm

Significant changes are underway as automotive manufacturers and retailers try to anticipate consumer demands in changes in their business models.

Building Tech | Aug 26, 2016

NBBJ’s Goldilocks sensor technology can help employees find a workspace that is just right

The technology measures light levels, humidity and temperature, motion, and sound.

boombox1
boombox2
native1

More In Category


AEC Tech

Lack of organizational readiness is biggest hurdle to artificial intelligence adoption

Managers of companies in the industrial sector, including construction, have bought the hype of artificial intelligence (AI) as a transformative technology, but their organizations are not ready to realize its promise, according to research from IFS, a global cloud enterprise software company. An IFS survey of 1,700 senior decision-makers found that 84% of executives anticipate massive organizational benefits from AI. 



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021