Ten years. That’s how long it took developer L&L Holding Company to get approval from the New York City Landmarks Preservation Commission for its retail master plan of the lobby of the AT&T Headquarters Building.
The adaptation of the 45,000-sf neoclassical lobby at 195 Broadway—originally designed by William Welles Bosworth and opened in 1916—created three retail spaces and a public walkway that connects two major streets in Lower Manhattan.
The project team, led by Gabellini Sheppard Associates (architect), Highland Associates (AOR), Sciame Construction (electrical engineer, CM), and OC Development Management (GC), installed 28-foot-tall glass demising walls to complement the 50 Doric columns in the lobby. A marble and bronze sculpture by Chester Beach commemorates the first transcontinental phone line (1915).
Nearly 70% of the retail space was leased two years in advance of the project’s completion. The major tenants are Nobu, which is moving its flagship restaurant from Tribeca to this location, and clothing/retailer Anthropologie.
Project Summary
Bronze Award Winner
Building Team: L&L Holding Company (submitting firm, owner) Gabellini Shepherd Associates (architect) Highland Associates (AOR) Thornton Tomasetti (SE) Cosentini Associates (M/P engineer) Sciame Construction (EE, CM) OC Development Management (GC).
Details: 40,000 sf (retail space). Total cost: Confidential. Construction time: 2015 to September 2016. Delivery method: Design-bid-build.
See all of the 2017 Reconstruction Award winners here
Related Stories
Reconstruction Awards | Nov 12, 2018
Cincinnati Music Hall: Saving a cultural anchor
Cincinnati uses ‘skillful triage’ to bring its endangered Music Hall up to date.
Reconstruction Awards | Dec 1, 2017
Rescue mission: Historic movie palace is now the centerpiece of Baltimore’s burgeoning arts hub
In restoring the theater, the design team employed what it calls a “rescued ruin” preservation approach.
Reconstruction Awards | Dec 1, 2017
Gothic revival: The nation’s first residential college is meticulously restored
This project involved the renovation and restoration of the 57,000-sf hall, and the construction of a 4,200-sf addition.
Reconstruction Awards | Dec 1, 2017
Rockefeller remake: Iconic New York tower is modernized for its next life
To make way for new ground-floor retail and a more dramatic entrance and lobby, the team removed four columns at the ground floor.
Reconstruction Awards | Nov 30, 2017
BD+C's 2017 Reconstruction Award Winners
Provo City Center Temple, the Union Trust Building, and the General Motors Factory One are just a few of the projects recognized as 2017 Reconstruction Award winners.
Reconstruction Awards | Nov 29, 2017
College credit: Historic rehab saves 50% on energy costs
The project team conducted surveys of students, faculty, and staff to get their input.
Reconstruction Awards | Nov 29, 2017
Amazing grace: Renovation turns a church into elegant condos
The windows became The Sanctuary’s chief sales edge.
Reconstruction Awards | Nov 27, 2017
Higher education: The rebirth of a Washington, D.C., high school
The project team, led by architect Perkins Eastman, restored the original cupola.
Reconstruction Awards | Nov 27, 2017
Bank statement: A project team saves a historic bank, yielding 100% leaseup for the developer
The project team had to fix poor renovations made in the ’50s.
Reconstruction Awards | Nov 27, 2017
Patient friendly: The University of Chicago Medicine Center for Care and Discovery adds 203 new beds
Strict infection control and life safety measures were implemented to protect patients on other floors as work proceeded.