In 1995, the Chicago Department of Environment (CDOE) faced a formidable task. CDOE began clean-up of over 17 acres and 600,000 tons of concrete and construction debris dumped illegally by Sacramento Crushing, a company that was permitted to collect and recycle construction and demolition material but that had far exceeded the parameters of its permit.
The CDOE successfully fought Sacramento Crushing in court and not only closed down their operation but also became the owner of the site itself. By 1999, CDOE was the proud owner of a clean, uncontaminated site with a vacant building. Rather than simply renovating the structure using traditional building methods, they seized the opportunity to design and develop an environmentally sustainable building, using some of the most sophisticated green technology available. The CDOE enlisted the Chicago Chapter of the American Institute of Architects (AIA) Committee on the Environment and redesigned the building and property using LEED guidelines, as established by the USGBC.
Green from the ground up
The building, originally erected in 1952, now showcases over 40,000-sf of state-of-the-art environmental features including solar panels, rainwater collection for irrigation, recycled materials, smart lighting, a geothermal exchange system, and a green roof. It is the nation’s first rehabilitated municipal building to receive LEED Platinum rating from the USGBC.
The Center is home to a number of companies that focus on environmental and sustainable design. It also acts as a community resource and CDOE satellite office, offering a range of educational classes for professionals and homeowners and a testament that green technology is cost-effective and good for the environment.
Green never looked so good
Two years after opening, the Chicago Center for Green Technology installed high-speed XLERATOR hand dryers.
"With over 30,000 visitors per year, we were using an awful lot of paper towels," said Sarah Moloney, project coordinator for the City of Chicago.
Unlike conventional hand dryers, which average 30 to 45 seconds of drying time, XLERATOR dries hands three times faster--completely in 10-15 seconds--and uses 80% less energy than conventional hand dryers. The hand dryer represents a 95% cost savings when compared to paper towels, reduces the need for maintenance, and improved restroom hygiene. It is also the only hand dryer that is Made in USA Certified, the first hand dryer to be GreenSpec Listed and helps facilities qualify for LEED credits.
In 2009, XLERATOR hand dryers with custom graphic covers were installed. These dryers include an educational “Good for the Environment” message for guests to read while drying their hands. In addition to offering superior functionality, the hand dryers’ sleek stainless steel covers compliment the facility’s modern design.
To meet the aesthetic needs of architects and designers, Excel Dryer Inc., manufacturer of XLERATOR, offers customers a wide range of finishes including traditional white, brushed stainless steel, vandalism-resistant bulk molded compound, fingerprint-resistant textured graphite, and other metallic finishes. +
Related Stories
Construction Costs | Oct 16, 2024
Construction Crane Index: Most major markets’ crane counts increase or hold steady in third quarter
Rider Levett Bucknall’s (RLB’s) latest Crane Index and Quarterly Cost Report shows continued decreasing cost inflation and crane counts increasing or holding steady in 10 of the 14 major markets it surveyed. The national average increase in construction costs was 1.07%, the lowest it’s been in the last three years.
AEC Tech | Oct 16, 2024
How AI can augment the design visualization process
Blog author Tim Beecken, AIA, uses the design of an airport as a case-study for AI’s potential in design visualizations.
University Buildings | Oct 15, 2024
Recreation and wellness are bedfellows in new campus student centers
Student demands for amenities and services that address their emotional and mental wellbeing are impacting new development on college campuses that has led to recreation centers with wellness portfolios.
Higher Education | Oct 14, 2024
Higher education design for the first-gen college student
In this Design Collaborative blog, Yogen Solanki, Assoc. AIA, shares how architecture and design can help higher education institutions address some of the challenges faced by first-generation students.
Performing Arts Centers | Oct 10, 2024
Studio Gang's performing arts center for Hudson Valley Shakespeare breaks ground
A new permanent home for Hudson Valley Shakespeare, a professional non-profit theater company, recently broke ground in Garrison, N.Y. The Samuel H. Scripps Theater Center includes a 14,850 sf performance venue that will serve as a permanent home for the theater company known for its sweeping open-air productions of classics and new works.
Sustainable Design and Construction | Oct 10, 2024
Northglenn, a Denver suburb, opens a net zero, all-electric city hall with a mass timber structure
Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.
3D Printing | Oct 9, 2024
3D-printed construction milestones take shape in Tennessee and Texas
Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.
University Buildings | Oct 9, 2024
Des Moines University Medicine and Health Sciences opens a new 88-acre campus
Des Moines University Medicine and Health Sciences has opened a new campus spanning 88 acres, over three times larger than its previous location. Designed by RDG Planning & Design and built by Turner Construction, the $260 million campus features technology-rich, flexible educational spaces that promote innovative teaching methods, expand research activity, and enhance clinical services. The campus includes four buildings connected with elevated pathways and totaling 382,000 sf.
Student Housing | Oct 9, 2024
University of Maryland begins work on $148 million graduate student housing development
The University of Maryland, in partnership with Campus Apartments and Mosaic Development Partners, has broken ground on a $148.75 million graduate student housing project on the university’s flagship College Park campus. The project will add 741 beds in 465 fully furnished apartments.
Healthcare Facilities | Oct 9, 2024
How healthcare operations inform design
Amanda Fisher, Communications Specialist, shares how BWBR's personalized approach and specialized experience can make a meaningful impact to healthcare facilities.