flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Buffalo, N.Y., contractor exec pleads guilty to fraud for bid rigging on $750 million contract

Codes and Standards

Buffalo, N.Y., contractor exec pleads guilty to fraud for bid rigging on $750 million contract

LPCiminelli stops functioning as GC in fallout from the case.


By Peter Fabris, Contributing Editor | June 6, 2018

Wikimedia Commons

Kevin Schuler, a former executive with Buffalo, N.Y. general contractor LPCiminelli, pleaded guilty to fraud and conspiracy for his part in an alleged bid-rigging scheme.

The scheme reportedly helped his former employer win a $750 million contract related to the Buffalo Billion development program. Prosecutors claim that Schuler and two other LPCiminelli executives, Louis Ciminelli and Michael Laipple, and other individuals related to Gov. Andrew Cuomo's economic initiative, rigged the bid process in favor of LPCiminelli and other contractors.

The executives allegedly made bribes paid to former Cuomo aide Todd Howe and one other individual. Former U.S. Attorney Preet Bharara alleged that LPCiminelli received the multimillion-dollar SolarCity construction contract in return for bribes that were disguised as consultant fees to Howe, who had influence over contract awards.

The fallout from the criminal charges has reportedly cost LPCiminelli $4 billion in contracts from other customers. As a result, the company has stopped functioning as a general contractor and has refocused on program management and development.

Related Stories

Codes and Standards | Sep 22, 2021

Group proposes Carbon Use Intensity metric for new buildings

Plan would track embedded carbon on projects.

Codes and Standards | Sep 22, 2021

Cities need to step up flood mitigation efforts to save lives

Recent storms highlight climate change dangers.

Codes and Standards | Sep 21, 2021

Steps to improve ventilation for Covid can combat colds and flu

New look at airborne disease spread shows time viruses linger in air may have been underestimated.

Codes and Standards | Sep 15, 2021

USGBC will change leaders, conduct strategic review

Aims to ensure organization is ‘well positioned to scale its work in the post-pandemic world’.

Codes and Standards | Sep 15, 2021

LEED-certified offices earn higher rents than non-sustainable properties

Are also more resilient to dips in real estate market.

Codes and Standards | Sep 7, 2021

Boston turns to developer fees to fund flood protection infrastructure

Assessments on commercial properties will help build seawall and other protective measures.

Codes and Standards | Sep 3, 2021

Low-cost methods can have substantial impact on reducing embodied carbon

Whole-building design, material substitution, and specification strategies can slash carbon by up to 46%.

Codes and Standards | Sep 2, 2021

Case for power resiliency in buildings grows with more disaster and outages

Essential businesses like data centers, hospitals are first adopters of new storage systems.

Codes and Standards | Aug 31, 2021

UK industry group wants mandatory whole-life carbon assessments of buildings

Aims to address hidden emissions embedded in supply chains.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021