flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Building owners to speak out at BUILDINGChicago conference and expo

Building owners to speak out at BUILDINGChicago conference and expo

Real estate professionals from Crate and Barrel, Jones Lang LaSalle, and Baxter are among the building owner representatives that will be attending and speaking at the show.


By BD+C Staff | August 28, 2013
Chicago-based McCaffery Interests is among nearly three dozen owner/developer fi
Chicago-based McCaffery Interests is among nearly three dozen owner/developer firms attending and speaking at the BUILDINGChicago show, September 9-11 at the Holiday Inn Chicago Mart Plaza. A representative from the company will speak about its planned sustainable development on the vacant U.S. Steel mill site.

Real estate professionals from Crate and Barrel, Jones Lang LaSalle, Baxter, and Advocate Healthcare are among the building owner representatives attending and speaking at Building Design+Construction's new conference and expo, BUILDINGChicago, September 9-11. 

More than half of the 65+ continuing education sessions offered at the show will include a building owner representative, who will offer their unique perspective on current trends and projects. 

Some of the owner-driven sessions include:

From Energy Hog to Energy Miser: Transforming the U.S. Bank Building, Madison, Wis.
Owner: Urban Land Interests

Informing the Design + Construction of Healthcare Facilities through Simulation: BIM + VDC at Lurie Children's Hospital of Chicago
Owner: Ann & Robert H. Lurie Children's Hospital of Chicago 

Chicago Lakeside Development: Bringing LEED for Neighborhood Development to the U.S. Steel Works Site
Owner: McCaffery Interests 

Sustainable Campus Master Planning at a Community College: Harnessing the Opportunities
Owner: College of Lake County, Ill. 

Transforming Medicine at the Community Level: Creating a Healthcare based Mixed-Use Development in Southwest Chicago
Owner: St. Anthony Hospital and Greater Southwest Development Corporation 

Sustainable Senior Housing in South Chicago: Combining LEED with Active Green Environments at Victory Centre
Owner: Pathway Senior Living

Two Net Zero Projects, One Conclusion: From the Yannell Residence to Harmony House Animal Shelter
Owner: Harmony House

An Owners Experience with BIM: The Crate and Barrel Story
Owner: Crate and Barrel

A New Post-occupancy Evaluation Process at Advocate BroMenn Medical Center, Normal, Ill.
Owner: Advocate Healthcare

Guiding Principles of Highly Effective K-8 Design: A Case Study at the University of Chicago Lab Schools
Owner: University of Chicago

 

As of August 27, here are the building owner organizations attending or speaking at the show:

  • Advocate Healthcare
  • Ann & Robert H. Lurie Children's Hospital of Chicago 
  • Baxter
  • Chicago Park District
  • Chicago Regional Council of Carpenters
  • City of Blue Island, Ill.
  • City of Brookfield, Wis.
  • City of Chicago 
  • City of Cincinnati
  • City of Indianapolis 
  • City of Lafayette, Ind.
  • City of Richfield, Minn.
  • City of Southfield, Mich.
  • City of Urbana
  • College of Lake County
  • ComEd
  • ComEd
  • Consulate General of Canada
  • Crate and Barrel
  • General Growth Properties
  • Grand Valley State University
  • Greater Southwest Development Corporation
  • GSA
  • Harmony House
  • Illinois Capital Development Board
  • Iowa State University
  • Jones Lang LaSalle
  • Lake County - Facilities Operations
  • Lake County - FAS
  • Loyola University Chicago
  • McCaffery Interests
  • Metropolitan Water Reclamation District of Greater Chicago
  • Ministry Health Care
  • Moraine Valley Community College
  • Nicor
  • Nicor Gas
  • Pathway Senior Living
  • Siemens
  • St. Anthony Hospital
  • State of Illinois Capital Development Board
  • State of Iowa, Department of Corrections
  • Transwestern
  • Tribune Co.
  • University of Chicago Medicine
  • University of Illinois
  • University of Wisconsin
  • Univiversity of Newcastle, England
  • Urban Land Interests

 

For information on attending BUILDINGChicago, visit: http://www.buildingchicagoexpo.com/

Related Stories

Urban Planning | Oct 30, 2024

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.

M/E/P Systems | Oct 30, 2024

After residential success, DOE will test heat pumps for cold climates in commercial sector

All eight manufacturers in the U.S. Department of Energy’s Residential Cold Climate Heat Pump Challenge completed rigorous product field testing to demonstrate energy efficiency and improved performance in cold weather.

MFPRO+ New Projects | Oct 30, 2024

Luxury waterfront tower in Brooklyn features East River and Manhattan skyline views

Leasing recently began for The Dupont, a 41-story luxury rental property along the Brooklyn, N.Y., waterfront. Located within the 22-acre Greenpoint Landing, where it overlooks the newly constructed Newtown Barge Park, the high-rise features East River and Manhattan skyline views along with 20,000 sf of indoor and outdoor communal space.

Resiliency | Oct 29, 2024

Climate change degrades buildings slowly but steadily

While natural disasters such as hurricanes and wildfires can destroy buildings in minutes, other factors exacerbated by climate change degrade buildings more slowly but still cause costly damage.

Office Buildings | Oct 29, 2024

Editorial call for Office Building project case studies

BD+C editors are looking to feature a roundup of office building projects for 2024, including office-to-residential conversions. Deadline for submission: December 6, 2024.

Healthcare Facilities | Oct 28, 2024

New surgical tower is largest addition to UNC Health campus in Chapel Hill

Construction on UNC Health’s North Carolina Surgical Hospital, the largest addition to the Chapel Hill campus since it was built in 1952, was recently completed. The seven-story, 375,000-sf structure houses 26 operating rooms, four of which are hybrid size to accommodate additional equipment and technology for newly developed procedures. 

Sports and Recreational Facilities | Oct 24, 2024

Stadium renovation plans unveiled for Boston’s National Women’s Soccer League

A city-owned 75-year-old stadium in Boston’s historic Franklin Park will be renovated for a new National Women’s Soccer League team. The park, designed by Fredrick Law Olmsted in the 1880s, is the home of White Stadium, which was built in 1949 and has since fallen into disrepair.

Laboratories | Oct 23, 2024

From sterile to stimulating: The rise of community-centric life sciences campuses

To distinguish their life sciences campuses, developers are partnering with architectural and design firms to reimagine life sciences facilities as vibrant, welcoming destinations. By emphasizing four key elements—wellness, collaboration, biophilic design, and community integration—they are setting their properties apart. 

Adaptive Reuse | Oct 22, 2024

Adaptive reuse project transforms 1840s-era mill building into rental housing

A recently opened multifamily property in Lawrence, Mass., is an adaptive reuse of an 1840s-era mill building. Stone Mill Lofts is one of the first all-electric mixed-income multifamily properties in Massachusetts. The all-electric building meets ambitious modern energy codes and stringent National Park Service historic preservation guidelines.

MFPRO+ News | Oct 22, 2024

Project financing tempers robust demand for multifamily housing

AEC Giants with multifamily practices report that the sector has been struggling over the past year, despite the high demand for housing, especially affordable products.

boombox1
boombox2
native1

More In Category

Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021