flexiblefullpage

Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

billboard
interstitial1
catfish1

Architects

Every building starts with a concept and a design. Architects are involved at every stage of the process, even after a design has been finalized, helping other building team members through the snares and missteps in the construction process. Building Design+Construction delivers news, trends, and research to the nation's largest architectural design firms. 

Aug 11, 2010

Burt Hill, HOK top BD+C's ranking of the nation's 100 largest university design firms

A ranking of the Top 100 University Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
Aug 11, 2010

ACSA Announces 2008-2009 ACSA/AISC Steel Design Student Competition Winners

(Washington, DC) - The Association of Collegiate Schools of Architecture (ACSA) is pleased to…
Aug 11, 2010

PBK, DLR Group among nation's largest K-12 school design firms, according to BD+C's Giants 300 report

A ranking of the Top 75 K-12 School Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
Aug 11, 2010

UC Irvine to host design innovation symposium October 1, 2009

WHO:  UC Irvine Design & Construction Services (D&CS); building industry leaders WHAT:  …
Aug 11, 2010

WHR Architects’ Cadenhead Presents at Design + Health Congress in Singapore on Trends in Critical Care

Houston, TX — Charles Cadenhead FAIA, FACHA, Senior Principal at WHR Architects will join an…
Aug 11, 2010

Turner Building Cost Index dips nearly 4% in second quarter 2009

Turner Construction Company announced that the second quarter 2009 Turner Building Cost Index, which measures nonresidential building construction costs in the U.S., has decreased 3.35% from the first quarter 2009 and is 8.92% lower than its peak in the second quarter of 2008. The Turner Building Cost Index number for second quarter 2009 is 837.

Aug 11, 2010

Australian water expert Dr. Jim Gill to keynote WaterSmart Innovations Conference, Oct. 7-9, Las Vegas

LAS VEGAS (June 29) – Dr. Jim Gill, inaugural chairman of Water Australia and past CEO of the Water…
Aug 11, 2010

AGC unveils comprehensive plan to revive the construction industry

The Associated General Contractors of America unveiled a new plan today designed to revive the nation’s construction industry. The plan, “Build Now for the Future: A Blueprint for Economic Growth,” is designed to reverse predictions that construction activity will continue to shrink through 2010, crippling broader economic growth.
Aug 11, 2010

New AIA report on embassies: integrate security and design excellence

The American Institute of Architects (AIA) released a new report to help the State Department design and build 21st Century embassies.
Aug 11, 2010

Section Eight Design wins 2009 Open Architecture Challenge for classroom design

Victor, Idaho-based Section Eight Design beat out seven other finalists to win the 2009 Open Architecture Challenge: Classroom, spearheaded by the Open Architecture Network. Section Eight partnered with Teton Valley Community School (TVCS) in Victor to design the classroom of the future. Currently based out of a remodeled house, students at Teton Valley Community School are now one step closer to getting a real classroom.
leaderboard1