Editorial call for Office Building project case studies
BD+C editors are looking to feature a roundup of office building projects for 2024, including office-to-residential conversions. Deadline for submission: December 6, 2024.
HORIZONTV FEATURING BD+C: WATCH EPISODES ON DEMAND AT HORIZONTV
BD+C editors are looking to feature a roundup of office building projects for 2024, including office-to-residential conversions. Deadline for submission: December 6, 2024.
This blog series exploring Gensler's Workplace Survey shows the top three surprises uncovered in the return to the office.
Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.
The San Francisco Department of Building Inspection announced a series of new building code guidelines clarifying adaptive reuse code provisions and exceptions for converting office-to-residential buildings. Developed in response to the Commercial to Residential Adaptive Reuse program established in July 2023, the guidelines aim to increase the viability of converting underutilized office buildings into housing by reducing regulatory barriers in specific zoning districts downtown.
No longer marked by gray, uniform rows of cubicles, offices have become more personalized and employee-centric than ever, giving people a more comfortable place to spend their working hours. New approaches to office customization and the way employees interact are breathing new life into the workplace.
Analysis of 15 major metros shows the average rent in central business districts was $43.48/sf for transit-accessible buildings versus $26.01/sf for car-dependent buildings.
The David Chipperfield Architects-designed project began in 2010.
Hacker Architects designed the space for Portland’s Frontside District.
Solomon Cordwell Buenz is designing the building.
The new headquarters includes almost 20,000 sf of additional space.
The project team completed this full-floor renovation in four months.
Watch a time-lapse of the HQ being built from groundbreaking to grand opening.
HGA designed the space.