Editorial call for Office Building project case studies
BD+C editors are looking to feature a roundup of office building projects for 2024, including office-to-residential conversions. Deadline for submission: December 6, 2024.
HORIZONTV FEATURING BD+C: WATCH EPISODES ON DEMAND AT HORIZONTV
BD+C editors are looking to feature a roundup of office building projects for 2024, including office-to-residential conversions. Deadline for submission: December 6, 2024.
This blog series exploring Gensler's Workplace Survey shows the top three surprises uncovered in the return to the office.
Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.
The San Francisco Department of Building Inspection announced a series of new building code guidelines clarifying adaptive reuse code provisions and exceptions for converting office-to-residential buildings. Developed in response to the Commercial to Residential Adaptive Reuse program established in July 2023, the guidelines aim to increase the viability of converting underutilized office buildings into housing by reducing regulatory barriers in specific zoning districts downtown.
No longer marked by gray, uniform rows of cubicles, offices have become more personalized and employee-centric than ever, giving people a more comfortable place to spend their working hours. New approaches to office customization and the way employees interact are breathing new life into the workplace.
The HQ occupies 75,000 sf in a 400,000-sf suburban office building.
The new free trade zone is designed to resemble a small village.
The new location provides the firm with 40,000 sf of space.
The new facility expands on the company’s old distribution facility by over 300,000 sf.
The costs ranged from 50 cents to $4 per sf, according to a ULI report.
An analysis of mortgage-backed loans suggests that demand remains relatively steady.
Toyota invested $1 billion in the project, which was designed by Corgan.
By varying an LED luminaire’s color temperature, it is possible to mimic daylighting, to some extent, and the natural circadian rhythms that accompany it, writes DLR Group’s Sean Avery.
Connecting personal values to company values is important to millennial workers.
Design Tech High School, located on Oracle Corporation’s Headquarters campus, will span 64,000 sf across two stories and have a capacity of 550 students.