Oakland, CA (March 8, 2010) -- BuildSite, a single source of product, technical, and procurement information for construction, has introduced online submittal templates tied to BuildSite Green Data. This latest innovation in the SaaS product enables detailed product information to flow directly into LEED submittal templates, providing a fully-electronic project record for owners and builders. Submittals generated in BuildSite can attach to design objects in building information (BIM) models and flow seamlessly into software for project management.
BuildSite's comprehensive database of product and technical information provides access to hundreds of manufacturers in one easily-searched location. The database houses over 20,000 construction products from more than 350 manufacturers. In addition to accessing over 20 document types, including product data and material safety data, users have access to Green Data, a next-generation database of product-specific LEED attribute information. Green Data, designed specifically to meet LEED requirements, includes VOC content, recycled content, manufacture location, SRI, and R-value, among other attributes.
"LEED submittals can be challenging for contractors and for the architects and consultants who receive them," said Ned Trainor, President of BuildSite. "We want to make LEED approachable to every member of the project team. Our submittals have all the fields a subcontractor or architect needs-you don't have to be a LEED AP to complete LEED submittals through BuildSite."
About BuildSite
BuildSite provides a single source of product, technical, procurement, and green product information to the construction industry worldwide. The BuildSite database features over 20,000 products from more than 350 manufacturers, along with a Distributor Directory of over 700 locations. BuildSite also offers software tools for construction submittals, allowing data from the supply chain to flow into project management and 3D building information (BIM) models. BuildSite Green Data, a next generation database of environmental and LEED® data for construction products, includes online submittal templates tied to the requirements of the US Green Building Council. Visit BuildSite.
Related Stories
| Feb 8, 2012
World’s tallest solar PV-installation
The solar array is at the elevation of 737 feet, making the building the tallest in the world with a solar PV-installation on its roof.
| Feb 2, 2012
Call for Entries: 2012 Building Team Awards. Deadline March 2, 2012
Winning projects will be featured in the May issue of BD+C.
| Jan 31, 2012
28th Annual Reconstruction Awards: Modern day reconstruction plays out
A savvy Building Team reconstructs a Boston landmark into a multiuse masterpiece for Suffolk University.
| Jan 30, 2012
Hollister Construction Services to renovate 30 Montgomery Street in Jersey City, N.J.
Owner Onyx Equities hires firm to oversee comprehensive upgrades of office building.
| Jan 27, 2012
Smith Seckman Reid opens two new offices
Smith Seckman Reid, Inc. (SSR), an engineering design and facility consulting firm, has opened two new offices, one in Chicago, the other in Washington, D.C.
| Jan 24, 2012
New iPad app ready for prime time
Siemens’ versatile application connects users to APOGEE BAS control and monitoring functions via wireless network connectivity. The application directly interacts with BACnet/IP and Siemens APOGEE P2 field panels.
| Jan 24, 2012
U of M installs new lighting at Crisler Player Development Center
Energy efficient lighting installed at PDC reduce costs and improves player performance.
| Jan 12, 2012
3M takes part in Better Buildings Challenge
As a partner in the challenge, 3M has committed to reduce energy use by 25% in 78 of its plants, encompassing nearly 38 million-sf of building space.
| Jan 8, 2012
TCA releases The Construction of Tilt-Up
The newest publication from the TCA is the second in a planned trilogy of resources covering the architecture, engineering and construction of Tilt-Up
| Jan 3, 2012
New Chicago hospital prepared for pandemic, CBR terror threat
At a cost of $654 million, the 14-story, 830,000-sf medical center, designed by a Perkins+Will team led by design principal Ralph Johnson, FAIA, LEED AP, is distinguished in its ability to handle disasters.