The Chicago Architecture Foundation (CAF) has recently announced plans to build the Chicago Architecture Center (CAC). The 20,000-sf building will showcase Chicago’s architectural legacy and how it has helped to shape cities around the world.
Adrian Smith + Gordon Gill Architecture (AS+GG) will design the facility set for construction at 111 East Wacker Drive. The modern building will be located on the Chicago River, just above the dock for the Chicago Architecture Foundation River Cruise.
Visitors will enter the CAC and be greeted at a tour orientation center on the ground level. They will then be taken on an expert, docent-led tour or move on to view exhibition spaces designed by Local Projects, an exhibition and media design studio.
“We want the CAC’s exhibitions to actively engage audiences and encourage them to keep digging into the many stories and insights we have to share about architecture,” said Local Projects founder Jake Barton in a release.
Courtesy of CAF.
The CAC will comprise almost 10,000-sf of exhibition space that will house an expanded, interactive and digitally enhanced Chicago City Model Experience that will tell the story of Chicago. A City of Neighborhoods Gallery will focus on the varied stories of Chicago’s neighborhoods. Chicago is often considered the birthplace of the skyscraper, as such, the history of Chicago’s skyscrapers will be on full display in a permanent Tall Buildings and Innovation exhibit. This exhibit, located in a 26-foot, double-height exhibition space dubbed the Skyscrape Gallery, will tell the stories of famous skyscrapers in Chicago and around the world. The exhibits will include 3D, scale models, including the world’s largest 3D Chicago model as part of the Chicago City Model Experience. There will also be rotating temporary exhibits on display throughout the year.
In addition to the exhibition space, the CAC will include a lecture hall, a hands-on design studio, new retail space for the Chicago Architecture Foundation’s shop, and office space for the 70 CAF employees stationed in the new building. The design studio will host programs and classes for children and adults. Programs will include expanded scholarship-based summer camps for middle school students, a STEM-based program for girls, and free family festivals.
CAF is currently in the silent phase of a campaign to raise $10 million to establish the center and to expand education and public programs. The CAC is scheduled to open in summer 2018.
Related Stories
Museums | Jul 1, 2021
New-York Historical Society Museum & Library expands Central Park West location
Robert A.M. Stern Architects designed the project.
Resiliency | Jun 24, 2021
Oceanographer John Englander talks resiliency and buildings [new on HorizonTV]
New on HorizonTV, oceanographer John Englander discusses his latest book, which warns that, regardless of resilience efforts, sea levels will rise by meters in the coming decades. Adaptation, he says, is the key to future building design and construction.
Museums | Jun 22, 2021
Cleveland’s Natural History museum to break ground on new Exhibit Hall
The added space will organize its artifacts and specimens to show humanity’s connection to science, the planet, and the universe.
Digital Twin | May 24, 2021
Digital twin’s value propositions for the built environment, explained
Ernst & Young’s white paper makes its cases for the technology’s myriad benefits.
Museums | May 19, 2021
Naismith Memorial Basketball Hall of Fame opens after $25 million renovation
CambridgeSeven designed the project.
Wood | May 14, 2021
What's next for mass timber design?
An architect who has worked on some of the nation's largest and most significant mass timber construction projects shares his thoughts on the latest design trends and innovations in mass timber.
Education Facilities | May 3, 2021
Khor Kalba Turtle and Wildlife Sanctuary completes in the United Arab Emirates
Hopkins Architects designed the project.
Museums | Apr 27, 2021
GWWO Architects unveils design of the new Niagara Falls Visitor Center
The project will replace the current outdated and cramped facility.
Market Data | Feb 24, 2021
2021 won’t be a growth year for construction spending, says latest JLL forecast
Predicts second-half improvement toward normalization next year.