flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The California Science Center breaks grounds on its Air and Space Center

Museums

The California Science Center breaks grounds on its Air and Space Center

The new addition will almost double the Science Center’s educational exhibit areas and serve as the permanent home of Space Shuttle Endeavour.


By Novid Parsi, Contributing Editor | June 28, 2022
Samuel Oschin Air and Space Center ext
Courtesy ZGF.

The California Science Center—a hands-on science center in Los Angeles—recently broke ground on its Samuel Oschin Air and Space Center. At 200,000 square feet and 20 stories high, the Air and Space Center will almost double the California Science Center’s educational exhibit areas.

The new addition to the Science Center will contain 150 interactive, educational exhibits in three multilevel galleries. The hands-on exhibits will be designed to encourage visitors to investigate scientific and engineering principles of atmospheric flight and the exploration of the universe. The Air and Space Center’s collection of aircraft and spacecraft will be selected to illustrate a key concept on each of its three multilevel galleries—air, space, and shuttle—across four floors and 100,000 square feet of exhibit space.

The Air and Space Center also will become the permanent home of Space Shuttle Endeavour, one of three remaining flown space shuttle orbiters. Endeavour will be presented in a “ready-to-launch” vertical configuration that will include solid rocket boosters and an external tank—the world’s only display of an authentic space shuttle system, according to the Science Center. The June 1 groundbreaking event coincided with the 11th anniversary of Space Shuttle Endeavour’s final touchdown.

The Samuel Oschin Air and Space Center marks the third phase of the California Science Center’s three-phase, three-decade master plan to develop one of the world’s leading science learning centers. Now underway, construction is expected to last three years. At about a year and a half into construction, Space Shuttle Endeavour will be positioned in the Air and Space Center. Architectural design is by ZGF, construction by MATT Construction, and exhibit design by Evidence Design.

On the project team: 
Owner and developer: California Science Center Foundation
Design architect and architect of record: ZGF
MEP engineer and structural engineer: Arup
General contractor/construction manager: MATT Construction

Aerial Samuel Oschin Air and Space
Courtesy ZGF.
Endeavour in the Samuel Oschin Air and Space Center
Courtesy ZGF.
Shuttle Gallery Intro Theater
Courtesy ZGF.
The Concourse
Courtesy ZGF.

 

Related Stories

Building Team Awards | Apr 9, 2015

9/11 museum triumphs over controversy

The Building Team for this highly visible project had much more than design, engineering, and construction problems to deal with.

High-rise Construction | Mar 16, 2015

Mexican Museum tower caught in turmoil to break ground this summer in San Francisco

Millennium Partners said it will break ground on the 53-story residential and museum tower while the lawsuits go through the appeals process.

Museums | Mar 9, 2015

Architecture based on astronomy principles for new planetarium in Shanghai

The ancient Chinese civilization left some of the earliest records of humans studying the stars and skies. To exhibit this long history, a new planetarium and astronomy museum is planned for construction in Shanghai.

Museums | Mar 5, 2015

A giant, silver loop in Dubai will house the Museum of the Future

The Sheikh of Dubai hopes the $136 million museum will serve as an incubator for ideas and real designs—a global destination for inventors and entrepreneurs.

Architects | Feb 27, 2015

5 finalists announced for 2015 Mies van der Rohe Award

Bjarke Ingels' Danish Maritime Museum and the Ravensburg Art Museum by Lederer Ragnarsdóttir Oei are among the five projects vying for the award.

Museums | Feb 18, 2015

Foster + Partners' National Museum of Marine Science and Technology breaks ground in Taiwan

The museum will be home to an aquarium, exhibition space, and waterfront views. 

Museums | Feb 17, 2015

Light will shimmer through roof cutouts in Jean Nouvel’s Louvre Abu Dhabi

After many delays since construction started in 2009, the Jean Nouvel-designed Louvre Abu Dhabi is slated for completion sometime this year.

Architects | Feb 11, 2015

Shortlist for 2015 Mies van der Rohe Award announced

Copenhagen, Berlin, and Rotterdam are the cities where most of the shortlisted works have been built. 

Museums | Feb 9, 2015

Herzog & de Meuron's M+ museum begins construction in Hong Kong

When completed, M+ will be one of the first buildings in the Foster + Partners-planned West Kowloon Cultural District.

Museums | Feb 6, 2015

Tacoma Art Museum's new wing features sun screens that operate like railroad box car doors

The 16-foot-tall screens, operated by a hand wheel, roll like box car doors across the façade and interlace with a set of fixed screens.

boombox1
boombox2
native1

More In Category

Museums

UT Dallas opens Morphosis-designed Crow Museum of Asian Art

In Richardson, Tex., the University of Texas at Dallas has opened a second location for the Crow Museum of Asian Art—the first of multiple buildings that will be part of a 12-acre cultural district. When completed, the arts and performance complex, called the Edith and Peter O’Donnell Jr. Athenaeum, will include two museums, a performance hall and music building, a grand plaza, and a dedicated parking structure on the Richardson campus.




Museums

The Tampa Museum of Art will soon undergo a $110 million expansion

In Tampa, Fla., the Tampa Museum of Art will soon undergo a 77,904-sf Centennial Expansion project. The museum plans to reach its $110 million fundraising goal by late 2024 or early 2025 and then break ground. Designed by Weiss/Manfredi, and with construction manager The Beck Group, the expansion will redefine the museum’s surrounding site.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021