The California Science Center—a hands-on science center in Los Angeles—recently broke ground on its Samuel Oschin Air and Space Center. At 200,000 square feet and 20 stories high, the Air and Space Center will almost double the California Science Center’s educational exhibit areas.
The new addition to the Science Center will contain 150 interactive, educational exhibits in three multilevel galleries. The hands-on exhibits will be designed to encourage visitors to investigate scientific and engineering principles of atmospheric flight and the exploration of the universe. The Air and Space Center’s collection of aircraft and spacecraft will be selected to illustrate a key concept on each of its three multilevel galleries—air, space, and shuttle—across four floors and 100,000 square feet of exhibit space.
The Air and Space Center also will become the permanent home of Space Shuttle Endeavour, one of three remaining flown space shuttle orbiters. Endeavour will be presented in a “ready-to-launch” vertical configuration that will include solid rocket boosters and an external tank—the world’s only display of an authentic space shuttle system, according to the Science Center. The June 1 groundbreaking event coincided with the 11th anniversary of Space Shuttle Endeavour’s final touchdown.
The Samuel Oschin Air and Space Center marks the third phase of the California Science Center’s three-phase, three-decade master plan to develop one of the world’s leading science learning centers. Now underway, construction is expected to last three years. At about a year and a half into construction, Space Shuttle Endeavour will be positioned in the Air and Space Center. Architectural design is by ZGF, construction by MATT Construction, and exhibit design by Evidence Design.
On the project team:
Owner and developer: California Science Center Foundation
Design architect and architect of record: ZGF
MEP engineer and structural engineer: Arup
General contractor/construction manager: MATT Construction




Related Stories
Resiliency | Jun 24, 2021
Oceanographer John Englander talks resiliency and buildings [new on HorizonTV]
New on HorizonTV, oceanographer John Englander discusses his latest book, which warns that, regardless of resilience efforts, sea levels will rise by meters in the coming decades. Adaptation, he says, is the key to future building design and construction.
Museums | Jun 22, 2021
Cleveland’s Natural History museum to break ground on new Exhibit Hall
The added space will organize its artifacts and specimens to show humanity’s connection to science, the planet, and the universe.
Digital Twin | May 24, 2021
Digital twin’s value propositions for the built environment, explained
Ernst & Young’s white paper makes its cases for the technology’s myriad benefits.
Museums | May 19, 2021
Naismith Memorial Basketball Hall of Fame opens after $25 million renovation
CambridgeSeven designed the project.
Wood | May 14, 2021
What's next for mass timber design?
An architect who has worked on some of the nation's largest and most significant mass timber construction projects shares his thoughts on the latest design trends and innovations in mass timber.
Education Facilities | May 3, 2021
Khor Kalba Turtle and Wildlife Sanctuary completes in the United Arab Emirates
Hopkins Architects designed the project.
Museums | Apr 27, 2021
GWWO Architects unveils design of the new Niagara Falls Visitor Center
The project will replace the current outdated and cramped facility.
Market Data | Feb 24, 2021
2021 won’t be a growth year for construction spending, says latest JLL forecast
Predicts second-half improvement toward normalization next year.
Museums | Jan 28, 2021
Arkansas Arts Center to undergo $142 million transformation into the Arkansas Museum of Fine Arts
Studio Gang is designing the project.