A new 240-bed addition will rise on the oldest and largest veterans’ home in the country in Yountville, Calif.
The California Veteran Home, Skilled Nursing Facility and Memory Care project will provide long-term care for senior and disabled veterans, including those with dementia, Alzheimer’s, and traumatic brain injuries.
The project’s design was inspired by the veterans, the program, and the place. The entire facility is modeled around home environments with personal bedrooms designed for care and efficiency. Common areas provide a living room feel with natural lighting and views while multiple outdoor terraces are accessible throughout. A straightforward path to “neighborhoods” helps members find their way to their rooms easily and a centralized elevator bank and circulation path simplifies navigation.
The project will include features such as enhanced HVAC systems, radiant floor heating, displacement air cooling, circadian lighting, touches plumbing fixtures, outdoor terraces, an outdoor physical therapy area, and COVID-19 prevention strategies. Sustainable features will also be included such as mass timber, advanced daylighting strategies, and a high-performance mechanical system and energy envelope.
Rudolph and Sletten is leading the design-build effort as the general contractor and CannonDesign is the architect and interior design firm for the project.
Related Stories
Healthcare Facilities | Mar 4, 2021
Behavior mapping: Taking care of the caregivers through technology
Research suggests that the built environment may help reduce burnout.
Healthcare Facilities | Feb 25, 2021
The Weekly show, Feb 25, 2021: When healthcare designers become patients, and machine learning for building design
This week on The Weekly show, BD+C editors speak with AEC industry leaders from BK Facility Consulting, cove.tool, and HMC Architects about what two healthcare designers learned about the shortcomings—and happy surprises—of healthcare facilities in which they found themselves as patients, and how AEC firms can use machine learning to optimize design, cost, and sustainability, and prioritize efficiency protocols.
Market Data | Feb 24, 2021
2021 won’t be a growth year for construction spending, says latest JLL forecast
Predicts second-half improvement toward normalization next year.
Sponsored | Biophilic Design | Feb 19, 2021
Stantec & LIGHTGLASS Simulate Daylight in a Windowless Patient Space
Healthcare Facilities | Feb 18, 2021
The Weekly show, Feb 18, 2021: What patients want from healthcare facilities, and Post-COVID retail trends
This week on The Weekly show, BD+C editors speak with AEC industry leaders from JLL and Landini Associates about what patients want from healthcare facilities, based on JLL's recent survey of 4,015 patients, and making online sales work for a retail sector recovery.
Healthcare Facilities | Feb 5, 2021
Healthcare design in a post-COVID world
COVID-19’s spread exposed cracks in the healthcare sector, but also opportunities in this sector for AEC firms.
Healthcare Facilities | Feb 3, 2021
$545 million patient pavilion at Vassar Brothers Medical Center completes
CallisonRTKL designed the project.
Modular Building | Jan 26, 2021
Offsite manufacturing startup iBUILT positions itself to reduce commercial developers’ risks
iBUILT plans to double its production capacity this year, and usher in more technology and automation to the delivery process.
Healthcare Facilities | Jan 16, 2021
New patient pavilion is Poughkeepsie, N.Y.’s largest construction project to date
The pavilion includes a 66-room Emergency Department.
Healthcare Facilities | Jan 9, 2021
As mental healthcare is destigmatized, demand for treatment centers is rising
NBBJ is among the firms tapping into this trend.