The annual Giants 300 Report ranks the top AEC firms in commercial construction, by revenue. You’ll want to be sure your firm is on the Giants 300 list, as potential clients look to these rankings for prospective firms to design and construct their future projects. Giants 300 results will be published in our July 2015 issue.
CLICK HERE TO DOWNLOAD THE 2015 GIANTS 300 SURVEY
NOTE: The Excel document has multiple tabs. If you do not see the tabs at the bottom of the worksheet, go to the “view” tab on the menu and select “full screen." You should see six tabs at the bottom.
Completed surveys must be returned by Friday, April 24, 2015. Please fill out the survey form and attach it in an email to BOTH dbarista@sgcmail.com and bdcGiants2015@sgcmail.com.
There are two additional ways to participate in the July Giants 300 report:
1. SUBMIT YOUR LATEST PROJECT PHOTOS FOR CONSIDERATION
As in years past, we're looking for great project photos for use in the July Giants issue, including on the cover. Please email your photo submissions to me (dbarista@sgcmail.com) by April 24. If possible, please include a short description of each image, with the project name and location and key Building Team members (owner/client, architect, structural engineer, MEP engineer, and contractor), and photo credit.
2. SUBMIT YOUR IDEAS FOR THE JULY GIANTS ISSUE EDITORIAL COVERAGE
The editors would like to hear from your AEC teams on the latest trends, projects, and innovations across a number of major building sectors that will be covered in the July Giants issue. They include: government, green building, healthcare, higher education, hotels/hospitality, K-12 schools, military, multifamily, office buildings, reconstruction, retail, science & technology, sports & recreation, and transit/TOD. Please email a short summary (and photos, if applicable) of your trends/innovations/projects for any of these sectors to dbarista@sgcmail.com by April 24.
Questions? Contact David Barista, Editorial Director, at dbarista@sgcmail.com or 847-954-7929.
Related Stories
| Aug 11, 2010
Nurturing the Community
The best seat in the house at the new Seahawks Stadium in Seattle isn't on the 50-yard line. It's in the southeast corner, at the very top of the upper bowl. "From there you have a corner-to-corner view of the field and an inspiring grasp of the surrounding city," says Kelly Kerns, project leader with architect/engineer Ellerbe Becket, Kansas City, Mo.
| Aug 11, 2010
Two Rivers Marketing: Industrial connection
It was supposed to be the perfect new office. In July 2003, Two Rivers Marketing Group of Des Moines, Iowa, began working with Shiffler Associates Architects on a 14,000-sf building to house their rapidly growing marketing firm. Over the next six months they put together an innovative program that drew on unprecedented amounts of employee feedback.
| Aug 11, 2010
AIA Course: Historic Masonry — Restoration and Renovation
Historic restoration and preservation efforts are accelerating throughout the U.S., thanks in part to available tax credits, awards programs, and green building trends. While these projects entail many different building components and systems, façade restoration—as the public face of these older structures—is a key focus. Earn 1.0 AIA learning unit by taking this free course from Building Design+Construction.
| Aug 11, 2010
AIA Course: Enclosure strategies for better buildings
Sustainability and energy efficiency depend not only on the overall design but also on the building's enclosure system. Whether it's via better air-infiltration control, thermal insulation, and moisture control, or more advanced strategies such as active façades with automated shading and venting or novel enclosure types such as double walls, Building Teams are delivering more efficient, better performing, and healthier building enclosures.
| Aug 11, 2010
Glass Wall Systems Open Up Closed Spaces
Sectioning off large open spaces without making everything feel closed off was the challenge faced by two very different projects—one an upscale food market in Napa Valley, the other a corporate office in Southern California. Movable glass wall systems proved to be the solution in both projects.
| Aug 11, 2010
High School in a Hurry
One of the more compelling arguments for charter schools is their theoretical ability to streamline decision making. Eliminate all those layers of bureaucratic fat that clog the arteries of most public school systems, the argument goes, and decisions can be made to flow much more smoothly, even when it comes to designing and building a major school project.
| Aug 11, 2010
Right-Sizing Healthcare
Over the past 30 years or so, the healthcare industry has quietly super-sized its healthcare facilities. Since 1980, ORs have bulked up in size by 53%, acute-care patient rooms by 77%. The slow creep went unlabeled until recently, when consultant H. Scot Latimer applied the super-sizing moniker to hospitals, inpatient rooms, operating rooms, and other treatment and administrative spaces.
| Aug 11, 2010
Silver Award: Pere Marquette Depot Bay City, Mich.
For 38 years, the Pere Marquette Depot sat boarded up, broken down, and fire damaged. The Prairie-style building, with its distinctive orange iron-brick walls, was once the elegant Bay City, Mich., train station. The facility, which opened in 1904, served the Flint and Pere Marquette Railroad Company when the area was the epicenter of lumber processing for the shipbuilding and kit homebuilding ...
| Aug 11, 2010
Special Recognition: Durrant Group Headquarters, Dubuque, Iowa
Architecture firm Durrant Group used the redesign of its $3.7 million headquarters building as a way to showcase the firm's creativity, design talent, and technical expertise as well as to create a laboratory for experimentation and education. The Dubuque, Iowa, firm's stated desire was to set a high sustainability standard for both itself and its clients by recycling a 22,890-sf downtown buil...
| Aug 11, 2010
Hilton President Hotel
Once an elegant and fashionably trendy locale, the Presidential Hotel played host to the 1928 Republican National Convention where Herbert Hoover was nominated for President, and acted as a hot spot for Kansas City Jazz in the '30s and '40s. The hotel was eventually abandoned in 1984, at which point it became a haven for vagabonds and pigeons, collecting animal waste and incurring significant s...