flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Calling all building design professionals: BD+C needs your expertise on design innovation in 2021

Architects

Calling all building design professionals: BD+C needs your expertise on design innovation in 2021

This new BD+C research project explores the leading drivers, sources of inspiration, and successful outcomes for design innovation projects and initiatives.  


By David Barista, Editorial Director | March 11, 2021
Calling all building design professionals: BD+C needs your expertise on design innovation in 2021
Calling all building design professionals: BD+C needs your expertise on design innovation in 2021

The BD+C editors are conducting a research project on "design innovation" in the AEC industry and real estate market. 

We invite all U.S. architects, designers, structural engineers, MEP engineers, and other design professionals that specialize in building design to participate in our 10-minute, 15-question online survey. 

The purpose of the 2021 Design Innovation Survey is to explore the leading drivers, sources of inspiration, and successful outcomes for design innovation projects and initiatives. Let us know about:
- Your most successful design innovation initiatives 
- Your thoughts on the top drivers of design innovation 
- How your firm encourages innovation on design projects 
- Which building sectors are most in need of innovation 
- Promising companies/startups that support AEC innovation

All survey participants who provide their contact information will be sent a link to download a PDF report with the complete findings. 

Also, all participants who provide their contact information (last question of the survey) will be entered into a drawing to win one of four $50 Visa Gift Cards

 

TAKE THE 2021 DESIGN INNOVATION SURVEY

 

Your response will provide valuable information to the AEC industry and the U.S. real estate market.  

Thanks!

- David Barista, Editorial Director, BD+C

Related Stories

| Sep 11, 2012

McQuade appointed CEO of Tishman Construction

McQuade will focus on driving the growth of the company into new markets and expanding market share in its current areas of operation.

| Sep 11, 2012

Ecosystem Management & Associates joins HDR

EM&A staff will do business as part of HDR Engineering and HDR Environmental, Operations and Construction.

| Sep 10, 2012

Specialty door types—plenty of functional variety

In the MasterFormat section 08 30 00, Specialty Doors and Frames, a number of door types are listed for special functions, access locations, sliding and folding hardware, and even pressure-resistant types.

| Sep 7, 2012

7 Do's and Don'ts for PV roof rack installation

As PVs grow in popularity, nearly half of all installations require roof rack systems. Our expert tells how to do the job right and protect your client’s roof.

| Sep 7, 2012

Net-zero energy pioneers on the el-hi frontier

Getting to net-zero is not easy, but the promise of eliminating energy bills and using state-of-the-art technology as a learning lab can make a compelling case to reach for net-zero.

| Sep 7, 2012

Healthcare architects get a preview of tomorrow’s medical landscape

The topic on everyone’s mind was how the Affordable Care Act would impact healthcare design and construction––and whether the law would even make it past the coming election cycle.

| Sep 7, 2012

Goettsch Partners designs new tower in Abu Dhabi

Al Hilal Bank’s 24-story flagship development provides contemporary office space.

| Sep 7, 2012

Suffolk awarded One Channel Center project in Boston

Firm to manage $125 million, 525,000-sf office building project.

| Sep 7, 2012

Duffy joins Thornton Tomasetti

At Hardesty & Hanover, Duffy partnered with Thornton Tomasetti on a number of projects.

| Sep 7, 2012

Lucile Packard Children’s Hospital breaks ground on expansion

Sustainability and nature at the heart of the new addition at the Stanford University Medical Center designed by Perkins+Will.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021