flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Calling all building design professionals: BD+C needs your expertise on design innovation in 2021

Architects

Calling all building design professionals: BD+C needs your expertise on design innovation in 2021

This new BD+C research project explores the leading drivers, sources of inspiration, and successful outcomes for design innovation projects and initiatives.  


By David Barista, Editorial Director | March 11, 2021
Calling all building design professionals: BD+C needs your expertise on design innovation in 2021
Calling all building design professionals: BD+C needs your expertise on design innovation in 2021

The BD+C editors are conducting a research project on "design innovation" in the AEC industry and real estate market. 

We invite all U.S. architects, designers, structural engineers, MEP engineers, and other design professionals that specialize in building design to participate in our 10-minute, 15-question online survey. 

The purpose of the 2021 Design Innovation Survey is to explore the leading drivers, sources of inspiration, and successful outcomes for design innovation projects and initiatives. Let us know about:
- Your most successful design innovation initiatives 
- Your thoughts on the top drivers of design innovation 
- How your firm encourages innovation on design projects 
- Which building sectors are most in need of innovation 
- Promising companies/startups that support AEC innovation

All survey participants who provide their contact information will be sent a link to download a PDF report with the complete findings. 

Also, all participants who provide their contact information (last question of the survey) will be entered into a drawing to win one of four $50 Visa Gift Cards

 

TAKE THE 2021 DESIGN INNOVATION SURVEY

 

Your response will provide valuable information to the AEC industry and the U.S. real estate market.  

Thanks!

- David Barista, Editorial Director, BD+C

Related Stories

| Nov 14, 2011

Griffin Electric completes electrical work at Cary Arts Center

  The Griffin Electric team was responsible for replacing the previous electrical service on-site with a 1000A, 480/277V service and providing electrical feeds for a new fire pump chiller, six air-handlers and two elevators.

| Nov 14, 2011

303 East 33rd Street building achieves LEED-NC

  The 165,000 sf 12-story residential building is the first green development to be LEED certified in the Murray Hill neighborhood of Manhattan.

| Nov 14, 2011

VanSumeren appointed to Traco general manager

VanSumeren will draw on his more than 20 years of experience in manufacturing management and engineering to deliver operational and service excellence and drive profitable growth for Traco. 

| Nov 11, 2011

By the Numbers

What do ‘46.9,’ ‘886.2,’ and ‘171,271’ mean to you? Check here for the answer.

| Nov 11, 2011

Streamline Design-build with BIM

How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.

| Nov 11, 2011

AIA: Engineered Brick + Masonry for Commercial Buildings

Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam. 

| Nov 11, 2011

How Your Firm Can Win Federal + Military Projects

The civilian and military branches of the federal government are looking for innovative, smart-thinking AEC firms to design and construct their capital projects. Our sources give you the inside story.

| Nov 10, 2011

BD+C's 28th Annual Reconstruction Awards

A total of 13 projects recognized as part of BD+C's 28th Annual Reconstruction Awards.

| Nov 10, 2011

Grousbeck Center for Students & Technology opens doors

New Perkins School for the Blind Building is dedicated to innovation, interaction, and independence for students.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021