flexiblefullpage
interstitial1
Currently Reading

Campus-wide energy-efficiency program aims to deliver $3.5 million in energy and operational savings

Campus-wide energy-efficiency program aims to deliver $3.5 million in energy and operational savings

Merced College and Honeywell will use the school’s energy usage statistics to develop a course curriculum on sustainability, and raise awareness among students of the positive impact conservation practices contribute to the community.


By By BD+C Staff | November 17, 2011
Honeywell Merced College
Honeywell will complete the building system enhancements and future maintenance under a 15-year, $3.1 million performance contra

Honeywell and Merced College kicked off an energy conservation initiative that aims to reduce the school’s annual operating costs by $180,000 through energy-efficient building upgrades.

The program also includes the launch of an enhanced college curriculum focused on teaching conservation strategies that utilize the energy-efficient building upgrades as a real-world case study for classroom learning.

As part of the project, Honeywell will make building infrastructure improvements to 16 campus buildings, including the installation of energy-efficient lighting and upgraded heating, ventilation and air conditioning (HVAC) systems. Overall, these campus building improvements are expected to trim the college’s electricity use by more than 1.5 million kilowatt-hours annually - enough energy to power nearly 180,000 homes.

Merced College and Honeywell will use the school’s energy usage statistics to develop a course curriculum on sustainability, and raise awareness among students of the positive impact conservation practices contribute to the community. As part of this program, using Honeywell’s Energy Management System (EMS), Sustainability Interns will track resource usage in 16 campus buildings. The interns will develop a newsletter to update students, faculty and staff on the program’s progress and help lead additional campus-wide conservation efforts, such as recycling competitions and car-sharing programs.

Honeywell will complete the building system enhancements and future maintenance under a 15-year, $3.1 million performance contract. This will allow school officials to pay for the upgrades using the cost savings generated, which Honeywell guarantees. As a result, the program won’t increase school budgets or require additional funding.

Honeywell will implement a variety of conservation measures across campus buildings, including:

·         Sub-meters in 16 campus buildings to provide facility personnel with a more granular view of energy usage throughout campus from a centralized energy management system

·         Updated HVAC systems for the gymnasium, student union, theater and computer services building to improve energy efficiency

·         High-efficiency lighting for building exteriors and interiors, including light-emitting diode (LED) lights. BD+C

Related Stories

| Oct 25, 2011

MKK participates in BSA Engineering Merit Badge day

MKK principal Craig Watts attended the event as a representative of the MEP (mechanical/electrical/plumbing) engineering industry to give scouts an idea of what’s involved in becoming a mechanical engineer, and an overview of a typical day in the life of an engineer.

| Oct 24, 2011

FMI releases Adjust, Adapt, Act Study

 The paper explores several case studies, including Sun Country Builders, Huen, BakerTriangle, Consigli, Skender Construction and Flatiron, and distills the key factors that make these companies unique and successful.

| Oct 24, 2011

BBS Architects & Engineers receives 2011 Sustainable Design Award from AIA Long Island Chapter

AIA LI also recognized BBS with the 2011 ARCHI Award Commendation for the St. Charles Resurrection Cemetery St. Charles Resurrection Cemetery Welcoming and Information Center in Farmingdale, NY.

| Oct 24, 2011

Kolbe adds 3-D models of direct set windows to BIM library?

Beveled Direct Set SketchUp and Revit Models available.

| Oct 20, 2011

UNT receives nation’s first LEED Platinum designation for collegiate stadium

Apogee Stadium will achieve another first in December with the completion of three wind turbines that will feed the electrical grid that powers the stadium.

| Oct 20, 2011

Process leads to new design values for southern pine and other visually graded dimension lumber

A summary of the process used to develop new design values will clarify many of the questions received by the SFPA.

| Oct 20, 2011

Johnson Controls appoints Wojciechowski to lead real estate and facilities management business for Global Technology sector

Wojciechowski will be responsible for leading the continued growth of the technology vertical market, while building on the expertise the company has developed serving multinational technology companies. 

| Oct 20, 2011

Stellar hires Navy veteran Taylor as vice president

Stellar’s federal experience includes military exchanges (large retail stores on military bases), lodging facilities for military personnel, fuel stations, youth activities centers and recreational centers. 

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021